Ohio Department of Transportation    News Release
District 9  Vaughn Wilson, P.E., Deputy Director
650 Eastern Avenue • Chillicothe, Ohio 45601
www.transportation.ohio.gov/dist9
Comment Period Open For Bridge Replacement Project
 
Highland County – HIG-247-11.07 (PID: 88720)  The proposed construction project is to replace the bridge situated over Rocky Fork Creek and located at the 11.07-mile marker, just south of the city of Hillsboro’s corporation limit and north of Township Road 268 (Green Road) in Liberty Township.
 
The existing bridge is a three-span, continuous, steel beams with a concrete slab, and currently the project has four alternatives for the replacement of the structure. No new right of way will be required, and no homes or businesses will be removed as a result of the project. Some small trees and brushes will be removed for roadway reconstruction, but none of these have habitat for the endangered Indiana Bat.
 
Additional information regarding this project, including a complete description, maps and plans sheets, is available online at http://www.dot.state.oh.us/districts/D09/Pages/Public-Involvement-Process.aspx. Issues the public may wish to comment on include the effect on local residents, air quality, the local economy, and historic or cultural resources. 

Written comments should be
submitted by December 5, 2013, or the deadline date that is posted on the web site, to:

Greg Manson, ODOT District 9 Environmental Supervisor
P.O. Box 467; 650 Eastern Avenue, Chillicothe, Ohio 45601
E-Mail:
greg.manson@dot.state.oh.us
 
###
For more information contact:
Kathleen Fuller, Public Information Officer
1-888-819-8501, ext. 7748834, toll free and in Ohio