Construction to replace the Ironton-Russell Bridge in Lawrence County is nearly complete, and the new bridge is now open to traffic! The project is the relocation of the bridge that connects Ironton, Ohio, with Russell, Kentucky, between Second and Jefferson streets in downtown Ironton and the U.S. 23 viaduct south of Russell. The project also includes removal of the former bridge upon completion of the new one. To read more about the project's history, follow the links below...

 

 

 Project Completion & Schedule

 

As the new Ironton-Russell Bridge has been opened to traffic, there should be little impact to motorists in the construction zones in Ohio and Kentucky. Crews will have finishing work to complete through the winter and spring months; however, traffic impacts should be minimal, and traffic on the new structure and intersecting roadways will be maintained at all times.

Along with completing the new bridge, the former Ironton-Russell Bridge has been closed to traffic, and demolition of the structure is under way. Phase 1 includes removal of the main span of the bridge by lowering it to a barge and moving it off-site for disassembly and salvage, while Phases 2 and 3 will entail disassembling portions of the cantilevered structure at the piers and detonating the anchor arms, simple span and piers. Phase 1 demolition was completed in mid-January 2017, and Phases 2 and 3 are now scheduled to be completed by early summer.

 

 Demolition Photos

 
Previous Image Pause Next Image
 

 Phase 1 Demolition (Former Bridge)

 
Get Microsoft SilverlightPhase 1 Demolition (Former Bridge)
 

 Project Updates

 
 

 Contractor: Brayman Construction

 
  
 

 US23 & KY244 Intersection

 
IRB @ KY Viaduct Intersection.jpg
 

 Construction Photos 2016

 
Previous Image Pause Next Image
 

 Photo Archive

 
Selection Checkbox
Picture Size
10.16.12 Abutment 1 Breast Wall.JPG
10.16.12 Abutment 1 Breast Wall
800 x 60095 KB
10.26.12 Welding Fins on a Casing for Pier 4.JPG
10.26.12 Welding Fins on a Casing for Pier 4
800 x 53392 KB
11.20.12 Inside of Pier 3 Precast Segment Footer Lowering System.JPG
11.20.12 Inside of Pier 3 Precast Segment Footer Lowering System
800 x 53371 KB
3.28.12 Drill Rig Set Up at Pier 1 Facing Upstream.JPG
3.28.12 Drill Rig Set Up at Pier 1 Facing Upstream
800 x 600143 KB
3.28.12 Drill Rig Setting up to Drill Pier 1 Upstation Right Caisson.JPG
3.28.12 Drill Rig Setting up to Drill Pier 1 Upstation Right Caisson
800 x 600150 KB
3.28.12 Drilling Pier 1 Upstation Right Caisson.JPG
3.28.12 Drilling Pier 1 Upstation Right Caisson
800 x 600145 KB
3.28.12 Drilling Pier 1 Upstation Right Caisson2.JPG
3.28.12 Drilling Pier 1 Upstation Right Caisson2
800 x 600147 KB
3.28.12 Getting Ready to Install Casing at Pier 1 Upstation Right Caisson.JPG
3.28.12 Getting Ready to Install Casing at Pier 1 Upstation Right Caisson
800 x 60093 KB
3.28.12 Lowering Casing at Pier 1 Upstation Right Caisson.JPG
3.28.12 Lowering Casing at Pier 1 Upstation Right Caisson
800 x 600144 KB
3.28.12 Lowering Casing into Pier 1 Upstation Right Caisson.JPG
3.28.12 Lowering Casing into Pier 1 Upstation Right Caisson
800 x 600107 KB
3.28.12 Removing Spoils From Pier 1 Upstation Right Caisson.JPG
3.28.12 Removing Spoils From Pier 1 Upstation Right Caisson
800 x 600118 KB
3.29.12 During Assembly of Rebar Cage for Pier 1 Upstation Right Caisson.JPG
3.29.12 During Assembly of Rebar Cage for Pier 1 Upstation Right Caisson
800 x 600170 KB
4.09.12 Start of Drilling Pier 1 Upstation Left Caisson.JPG
4.09.12 Start of Drilling Pier 1 Upstation Left Caisson
800 x 600124 KB
4.10.12 Drilling Pier 1 Upstation Left Caisson.JPG
4.10.12 Drilling Pier 1 Upstation Left Caisson
800 x 600151 KB
4.12.12 Hoisting Pier 1 Upstation Center Caisson Rebar Cage Facing Upstream(2).JPG
4.12.12 Hoisting Pier 1 Upstation Center Caisson Rebar Cage Facing Upstream(2)
800 x 600115 KB
4.12.12 Lowering Pier 1 Upstation Center Caisson Rebar Cage into Casing.JPG
4.12.12 Lowering Pier 1 Upstation Center Caisson Rebar Cage into Casing
800 x 600114 KB
4.12.12 Pier 1 Upstation Center Dowel Rebar Cage for Column Set Facing Upstream.JPG
4.12.12 Pier 1 Upstation Center Dowel Rebar Cage for Column Set Facing Upstream
800 x 600151 KB
4.12.12 Setting Pier 1 Upstation Center Caisson Rebar Cage into Casing.JPG
4.12.12 Setting Pier 1 Upstation Center Caisson Rebar Cage into Casing
800 x 600172 KB
4.17.12  Pouring Pier 1 Upstation Center Caisson Facing Upstream.JPG
4.17.12 Pouring Pier 1 Upstation Center Caisson Facing Upstream
800 x 600106 KB
4.18.12  Lowering Rebar Cage into Pier 1 Upstation Left Caisson.JPG
4.18.12 Lowering Rebar Cage into Pier 1 Upstation Left Caisson
800 x 600125 KB
4.2.12 Pier 1 Upstation Right Caisson(2).JPG
4.2.12 Pier 1 Upstation Right Caisson(2)
800 x 600168 KB
4.2.12 Setting Dowels Cage for Pier 1 Upstation Right Column(2).JPG
4.2.12 Setting Dowels Cage for Pier 1 Upstation Right Column(2)
800 x 600124 KB
4.2.12 Setting Rebar Cage for Pier 1 Upstation Right Caisson(4).JPG
4.2.12 Setting Rebar Cage for Pier 1 Upstation Right Caisson(4)
800 x 600166 KB
4.2.12 Setting Rebar Cage for Pier 1 Upstation Right Caisson.JPG
4.2.12 Setting Rebar Cage for Pier 1 Upstation Right Caisson
800 x 600169 KB
4.20.12 Bore Pit at Main Office Lot in Ohio Facing West.JPG
4.20.12 Bore Pit at Main Office Lot in Ohio Facing West
800 x 600120 KB
4.20.12 Core Drilling at Pier 2 Facing Towards Ohio Riverbank.JPG
4.20.12 Core Drilling at Pier 2 Facing Towards Ohio Riverbank
800 x 600121 KB
4.20.12 Pier 1 Facing Upstream.JPG
4.20.12 Pier 1 Facing Upstream
800 x 600154 KB
4.23.12  Pouring Caisson DS-3 at Abutment 1(2).JPG
4.23.12 Pouring Caisson DS-3 at Abutment 1(2)
800 x 600148 KB
4.24.12  Grouting CSL Pipe at Pier 1(3).JPG
4.24.12 Grouting CSL Pipe at Pier 1(3)
800 x 600131 KB
4.24.12  Setting up Form Work at Pier 1.JPG
4.24.12 Setting up Form Work at Pier 1
800 x 600101 KB
4.27.12  Pouring Caisson DS-5 at Abutment 1(2).JPG
4.27.12 Pouring Caisson DS-5 at Abutment 1(2)
800 x 600167 KB
4.27.12  Tying Rebar for Column at Pier 1.JPG
4.27.12 Tying Rebar for Column at Pier 1
800 x 600154 KB
5.15.12 Cap Forms for Pier 1.JPG
5.15.12 Cap Forms for Pier 1
800 x 600154 KB
5.17.12 Upstream Side of Pier 1.JPG
5.17.12 Upstream Side of Pier 1
800 x 600121 KB
5.22.12 Pier 1 Facing Downstation.JPG
5.22.12 Pier 1 Facing Downstation
800 x 60097 KB
5.30.12 Set up for Drilling Test Caisson 2 Facing Downstream.JPG
5.30.12 Set up for Drilling Test Caisson 2 Facing Downstream
800 x 60094 KB
6.15.12 Driving Pile at Pier 6 Footer.JPG
6.15.12 Driving Pile at Pier 6 Footer
800 x 60070 KB
7.06.12 Picking up the Can for Test Shaft 1(2).JPG
7.06.12 Picking up the Can for Test Shaft 1(2)
800 x 60050 KB
7.17.12 On top of Pier 8 Cap Form During Pour.JPG
7.17.12 On top of Pier 8 Cap Form During Pour
800 x 600100 KB
7.26.12 Stripping Pie 8 Cap.JPG
7.26.12 Stripping Pie 8 Cap
800 x 60071 KB
1 - 40Next
 

 News Releases

 
 

 Virtual Tour (New Bridge)

 
Get Microsoft SilverlightVirtual Tour (New Bridge)
 

 Construction Consultant: FIGG Engineering