Construction to replace the Ironton-Russell Bridge in Lawrence County is nearly complete, and the new bridge is now open to traffic! The project is the relocation of the bridge that connects Ironton, Ohio, with Russell, Kentucky, between Second and Jefferson streets in downtown Ironton and the U.S. 23 viaduct south of Russell. The project also includes removal of the former bridge upon completion of the new one. To read more about the project's history, follow the links below...

 

 

 Project Completion & Schedule

 

As the new Ironton-Russell Bridge has been opened to traffic, there should be little impact to motorists in the construction zones in Ohio and Kentucky. Crews will have finishing work to complete through the winter and spring months; however, traffic impacts should be minimal, and traffic on the new structure and intersecting roadways will be maintained at all times.

Along with completing the new bridge, the former Ironton-Russell Bridge has been closed to traffic, and demolition of the structure is under way. Phase 1 includes removal of the main span of the bridge by lowering it to a barge and moving it off-site for disassembly and salvage, while Phases 2 and 3 will entail disassembling portions of the cantilevered structure at the piers and detonating the anchor arms, simple span and piers. Phase 1 demolition was completed in mid-January 2017, and Phases 2 and 3 are now scheduled to be completed by early summer.

 

 Demolition Photos

 
Previous Image Pause Next Image
 

 Phase 1 Demolition (Former Bridge)

 
Get Microsoft SilverlightPhase 1 Demolition (Former Bridge)
 

 Project Updates

 
 

 Contractor: Brayman Construction

 
  
 

 US23 & KY244 Intersection

 
IRB @ KY Viaduct Intersection.jpg
 

 Construction Photos 2016

 
Previous Image Pause Next Image
 

 Photo Archive

 
Selection Checkbox
Picture Size
03.18.15 OH BACKSPAN EDGE GIRDER POUR.jpg
03.18.15 OH BACKSPAN EDGE GIRDER POUR
640 x 426104 KB
03.18.15 P3.KY BACK.APPROACH SPANS DEBRIS AT FALSEWORK.jpg
03.18.15 P3.KY BACK.APPROACH SPANS DEBRIS AT FALSEWORK
640 x 42691 KB
03.18.15 POURING ELECTRICAL POLE BASES.jpg
03.18.15 POURING ELECTRICAL POLE BASES
640 x 42689 KB
04.01.15 P3 FORMING.jpg
04.01.15 P3 FORMING
640 x 42661 KB
04.01.15 P4 FORMING.jpg
04.01.15 P4 FORMING
640 x 42654 KB
04.08.15 INSTALLING P3 INITIAL CABLE STAY PIPES.jpg
04.08.15 INSTALLING P3 INITIAL CABLE STAY PIPES
640 x 42686 KB
04.08.15 P4 TABLE EDGE GIRDER.jpg
04.08.15 P4 TABLE EDGE GIRDER
640 x 426111 KB
04.08.15 P4 TABLE FLOOR BEAM.jpg
04.08.15 P4 TABLE FLOOR BEAM
640 x 426109 KB
04.09.15 P3 STAY PIPE INSTALLED.jpg
04.09.15 P3 STAY PIPE INSTALLED
640 x 42655 KB
04.15.15 FORMING P3.jpg
04.15.15 FORMING P3
640 x 426111 KB
04.17.15 P3 WITH BACKSPAN.jpg
04.17.15 P3 WITH BACKSPAN
640 x 42651 KB
04.23.15 P3 STRIPPING.jpg
04.23.15 P3 STRIPPING
640 x 42662 KB
04.24.15 POURING P4 PIER TABLE EDGE GIRDERS.jpg
04.24.15 POURING P4 PIER TABLE EDGE GIRDERS
640 x 42680 KB
04.28.15 EPOXY PAINTING KY APPROACH SPAN (2).jpg
04.28.15 EPOXY PAINTING KY APPROACH SPAN (2)
640 x 426108 KB
04.28.15 EPOXY PAINTING KY APPROACH SPAN.jpg
04.28.15 EPOXY PAINTING KY APPROACH SPAN
640 x 42692 KB
1.12.15 P3 PROGRESS.jpg
1.12.15 P3 PROGRESS
640 x 42634 KB
1.23.15 EDGE GIRDERS CONCRETE POUR 2.jpg
1.23.15 EDGE GIRDERS CONCRETE POUR 2
640 x 42696 KB
1.23.15 EDGE GIRDERS CONCRETE POUR.jpg
1.23.15 EDGE GIRDERS CONCRETE POUR
640 x 42691 KB
1.23.15 P4 BEARING BLOCK.jpg
1.23.15 P4 BEARING BLOCK
640 x 42691 KB
1.30.15 OH BACKSPAN.jpg
1.30.15 OH BACKSPAN
640 x 42686 KB
2.11.15 P4 BEARING BLOCK DR.SIDE CONCRETE POUR.jpg
2.11.15 P4 BEARING BLOCK DR.SIDE CONCRETE POUR
640 x 42650 KB
2.20.15 P3 BACKSPAN.jpg
2.20.15 P3 BACKSPAN
640 x 42660 KB
2.6.15 P4 BEARING UP RIVER SIDE CONCRETE POUR.jpg
2.6.15 P4 BEARING UP RIVER SIDE CONCRETE POUR
640 x 42674 KB
2.6.15 P4 BEARING UPRIVER CONCRETE POUR (2).jpg
2.6.15 P4 BEARING UPRIVER CONCRETE POUR (2)
640 x 42647 KB
2.6.15 P4 BEARING UPRIVER CONCRETE POUR.jpg
2.6.15 P4 BEARING UPRIVER CONCRETE POUR
640 x 42683 KB
3.02.15 POURING PIER SEGMENT UPRIVER.jpg
3.02.15 POURING PIER SEGMENT UPRIVER
640 x 426101 KB
3.12.15 P4 HIGH WATER OH BACK.APPROACH SPANS.jpg
3.12.15 P4 HIGH WATER OH BACK.APPROACH SPANS
640 x 42678 KB
7.13.15 - STRESSING FLOOR BEAM TENDONS OF POUR 3_JPG.jpg
7.13.15 - STRESSING FLOOR BEAM TENDONS OF POUR 3_JPG
640 x 42697 KB
all segments.jpg
all segments
640 x 42688 KB
approach span.jpg
approach span
640 x 42656 KB
backspan and tower.jpg
backspan and tower
640 x 42663 KB
deck pour.jpg
deck pour
640 x 42686 KB
duct tendons.jpg
duct tendons
640 x 426121 KB
erecting winsafe modular platforms.jpg
erecting winsafe modular platforms
640 x 42673 KB
forming segment.jpg
forming segment
640 x 42669 KB
KY backspan.jpg
KY backspan
640 x 42673 KB
KY shore facing up river.jpg
KY shore facing up river
640 x 42647 KB
loop tendons stressing.jpg
loop tendons stressing
640 x 426117 KB
OH and KY backspans.jpg
OH and KY backspans
640 x 42662 KB
pier table deck.jpg
pier table deck
640 x 426155 KB
1 - 40Next
 

 News Releases

 
 

 Virtual Tour (New Bridge)

 
Get Microsoft SilverlightVirtual Tour (New Bridge)
 

 Construction Consultant: FIGG Engineering