Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
Navigate Up
Sign In
​​​​
 

 Welcome!

 
IRBR Web Banner.jpg
 
 
 

 History & Overview

 

Construction to replace the Ironton-Russell Bridge in Lawrence County is nearly complete, and the new bridge is now open to traffic! The project is the relocation of the bridge that connects Ironton, Ohio, with Russell, Kentucky, between Second and Jefferson streets in downtown Ironton and the U.S. 23 viaduct south of Russell. The project also includes removal of the former bridge upon completion of the new one. To read more about the project's history, follow the links below...

 

 

 Project Completion & Schedule

 

As the new Ironton-Russell Bridge has been opened to traffic, there should be little impact to motorists in the construction zones in Ohio and Kentucky. Crews will have finishing work to complete through the winter and spring months; however, traffic impacts should be minimal, and traffic on the new structure and intersecting roadways will be maintained at all times.

Along with completing the new bridge, the former Ironton-Russell Bridge has been closed to traffic, and demolition of the structure is under way. Phase 1 includes removal of the main span of the bridge by lowering it to a barge and moving it off-site for disassembly and salvage, while Phases 2 and 3 will entail disassembling portions of the cantilevered structure at the piers and detonating the anchor arms, simple span and piers. Phase 1 demolition was completed in mid-January 2017, and Phases 2 and 3 are now scheduled to be completed by early summer.

 

 Demolition Photos

 
Previous Image Pause Next Image
 

 Phase 1 Demolition (Former Bridge)

 
Get Microsoft SilverlightPhase 1 Demolition (Former Bridge)
 

 Project Updates

 
 

 Contractor: Brayman Construction

 
  
 

 US23 & KY244 Intersection

 
IRB @ KY Viaduct Intersection.jpg
 

 Construction Photos 2016

 
Previous Image Pause Next Image
 

 Photo Archive

 
Selection Checkbox
Picture Size
IMG_4938.JPG
IMG_4938
3072 x 20482613 KB
IMG_4942.JPG
IMG_4942
3072 x 20482817 KB
IMG_4943.JPG
IMG_4943
3072 x 20483218 KB
IMG_4945.JPG
IMG_4945
3072 x 20482616 KB
IMG_4949.JPG
IMG_4949
3072 x 20482723 KB
IMG_4962.JPG
IMG_4962
3072 x 20481962 KB
IMG_4968.JPG
IMG_4968
3072 x 20482187 KB
IMG_4971.JPG
IMG_4971
3072 x 20482326 KB
IMG_4973.JPG
IMG_4973
3072 x 20483821 KB
IMG_4975.JPG
IMG_4975
3072 x 20483584 KB
IMG_4979.JPG
IMG_4979
3072 x 20482494 KB
IMG_6865.JPG
IMG_6865
1600 x 1200509 KB
IMG_6866.JPG
IMG_6866
1600 x 1200666 KB
IMG_6869.JPG
IMG_6869
1600 x 1200499 KB
IMG_6870.JPG
IMG_6870
1600 x 1200531 KB
IMG_6872.JPG
IMG_6872
1600 x 1200642 KB
IMG_6875.JPG
IMG_6875
1600 x 1200534 KB
IMG_6877.JPG
IMG_6877
1600 x 1200542 KB
IMG_6878.JPG
IMG_6878
1600 x 1200504 KB
IMG_6879.JPG
IMG_6879
1600 x 1200555 KB
IMG_6880.JPG
IMG_6880
1600 x 1200539 KB
IMG_6882.JPG
IMG_6882
1600 x 1200465 KB
IMG_6885.JPG
IMG_6885
1600 x 1200381 KB
IMG_6887.JPG
IMG_6887
1600 x 1200545 KB
IMG_6888.JPG
IMG_6888
1600 x 1200514 KB
IMG_6892.JPG
IMG_6892
1600 x 1200429 KB
IMG_6893.JPG
IMG_6893
1600 x 1200588 KB
IMG_6896.JPG
IMG_6896
1600 x 1200577 KB
IMG_6898.JPG
IMG_6898
1600 x 1200465 KB
IMG_6901.JPG
IMG_6901
1600 x 1200657 KB
IMG_6902.JPG
IMG_6902
1600 x 1200535 KB
IMG_6905.JPG
IMG_6905
1600 x 1200543 KB
IMG_6906.JPG
IMG_6906
1600 x 1200549 KB
IMG_6908.JPG
IMG_6908
1600 x 1200503 KB
IMG_6909.JPG
IMG_6909
1600 x 1200570 KB
IMG_6912.JPG
IMG_6912
1600 x 1200483 KB
IMG_6915.JPG
IMG_6915
1600 x 1200519 KB
IMG_6916.JPG
IMG_6916
1600 x 1200514 KB
IMG_6917.JPG
IMG_6917
1600 x 1200633 KB
IMG_6918.JPG
IMG_6918
1600 x 1200623 KB
1 - 40Next
 

 News Releases

 
 

 Virtual Tour (New Bridge)

 
Get Microsoft SilverlightVirtual Tour (New Bridge)
 

 Construction Consultant: FIGG Engineering