 History & Overview

 

Construction to replace the Ironton-Russell Bridge in Lawrence County is nearly complete, and the new bridge is now open to traffic! The project is the relocation of the bridge that connects Ironton, Ohio, with Russell, Kentucky, between Second and Jefferson streets in downtown Ironton and the U.S. 23 viaduct south of Russell. The project also includes removal of the former bridge upon completion of the new one. To read more about the project's history, follow the links below...

 

 

 Project Completion & Schedule

 

As the new Ironton-Russell Bridge has been opened to traffic, there should be little impact to motorists in the construction zones in Ohio and Kentucky. Crews will have finishing work to complete through the winter and spring months; however, traffic impacts should be minimal, and traffic on the new structure and intersecting roadways will be maintained at all times.

Along with completing the new bridge, the former Ironton-Russell Bridge has been closed to traffic, and demolition of the structure is under way. Phase 1 includes removal of the main span of the bridge by lowering it to a barge and moving it off-site for disassembly and salvage, while Phases 2 and 3 will entail disassembling portions of the cantilevered structure at the piers and detonating the anchor arms, simple span and piers. Phase 1 demolition was completed in mid-January 2017, and Phases 2 and 3 are now scheduled to be completed by early summer.

 

 Demolition Photos

 
Previous Image Pause Next Image
 

 Phase 1 Demolition (Former Bridge)

 
Get Microsoft SilverlightPhase 1 Demolition (Former Bridge)
 

 Project Updates

 
 

 Contractor: Brayman Construction

 
  
 

 US23 & KY244 Intersection

 
IRB @ KY Viaduct Intersection.jpg
 

 Construction Photos 2016

 
Previous Image Pause Next Image
 

 Photo Archive

 
Selection Checkbox
Picture Size
IMG_1642.JPG
IMG_1642
3264 x 24482194 KB
IMG_1645.JPG
IMG_1645
3264 x 24482633 KB
IMG_1652.JPG
IMG_1652
3264 x 24482071 KB
IMG_1654.JPG
IMG_1654
3264 x 24481838 KB
IMG_1656.JPG
IMG_1656
3264 x 24482263 KB
IMG_1658.JPG
IMG_1658
3264 x 24482074 KB
IMG_1659.JPG
IMG_1659
3264 x 24482075 KB
IMG_1660.JPG
IMG_1660
3264 x 24482025 KB
IMG_1664.JPG
IMG_1664
3264 x 24482542 KB
IMG_1665.JPG
IMG_1665
3264 x 24482006 KB
IMG_1667.JPG
IMG_1667
3264 x 24481794 KB
IMG_1669.JPG
IMG_1669
3264 x 24481998 KB
IMG_1670.JPG
IMG_1670
3264 x 24482018 KB
IMG_1674.JPG
IMG_1674
3264 x 24482174 KB
IMG_1676.JPG
IMG_1676
3264 x 24481915 KB
IMG_1681.JPG
IMG_1681
3264 x 24481969 KB
IMG_1686.JPG
IMG_1686
3264 x 24482100 KB
IMG_1690.JPG
IMG_1690
3264 x 24481982 KB
IMG_1692.JPG
IMG_1692
3264 x 24482068 KB
IMG_1693.JPG
IMG_1693
3264 x 24482032 KB
IMG_1698.JPG
IMG_1698
3264 x 24482246 KB
IMG_1699.JPG
IMG_1699
3264 x 24482100 KB
IMG_1701.JPG
IMG_1701
3264 x 24482361 KB
IMG_1702.JPG
IMG_1702
3264 x 24482089 KB
IMG_1704.JPG
IMG_1704
3264 x 24481982 KB
IMG_1705.JPG
IMG_1705
3264 x 24482080 KB
IMG_1706.JPG
IMG_1706
3264 x 24481770 KB
IMG_1707.JPG
IMG_1707
3264 x 24481815 KB
IMG_1708.JPG
IMG_1708
3264 x 24482270 KB
IMG_1709.JPG
IMG_1709
3264 x 24482117 KB
IMG_1710.JPG
IMG_1710
3264 x 24481131 KB
IMG_1711.JPG
IMG_1711
3264 x 24481125 KB
IMG_1714.JPG
IMG_1714
3264 x 24481941 KB
IMG_1716.JPG
IMG_1716
3264 x 24482259 KB
IMG_1718.JPG
IMG_1718
3264 x 24482042 KB
IMG_1720.JPG
IMG_1720
3264 x 24481938 KB
IMG_1722.JPG
IMG_1722
3264 x 24481809 KB
IMG_1727.JPG
IMG_1727
3264 x 24481905 KB
IMG_1729.JPG
IMG_1729
3264 x 24481187 KB
IMG_1733.JPG
IMG_1733
3264 x 24482124 KB
1 - 40Next
 

 News Releases

 
 

 Virtual Tour (New Bridge)

 
Get Microsoft SilverlightVirtual Tour (New Bridge)
 

 Construction Consultant: FIGG Engineering