 History & Overview

 

Construction to replace the Ironton-Russell Bridge in Lawrence County is nearly complete, and the new bridge is now open to traffic! The project is the relocation of the bridge that connects Ironton, Ohio, with Russell, Kentucky, between Second and Jefferson streets in downtown Ironton and the U.S. 23 viaduct south of Russell. The project also includes removal of the former bridge upon completion of the new one. To read more about the project's history, follow the links below...

 

 

 Project Completion & Schedule

 

As the new Ironton-Russell Bridge has been opened to traffic, there should be little impact to motorists in the construction zones in Ohio and Kentucky. Crews will have finishing work to complete through the winter and spring months; however, traffic impacts should be minimal, and traffic on the new structure and intersecting roadways will be maintained at all times.

Along with completing the new bridge, the former Ironton-Russell Bridge has been closed to traffic, and demolition of the structure is under way. Phase 1 includes removal of the main span of the bridge by lowering it to a barge and moving it off-site for disassembly and salvage, while Phases 2 and 3 will entail disassembling portions of the cantilevered structure at the piers and detonating the anchor arms, simple span and piers. Phase 1 demolition was completed in mid-January 2017, and Phases 2 and 3 are now scheduled to be completed by early summer.

 

 Demolition Photos

 
Previous Image Pause Next Image
 

 Phase 1 Demolition (Former Bridge)

 
Get Microsoft SilverlightPhase 1 Demolition (Former Bridge)
 

 Project Updates

 
 

 Contractor: Brayman Construction

 
  
 

 US23 & KY244 Intersection

 
IRB @ KY Viaduct Intersection.jpg
 

 Construction Photos 2016

 
Previous Image Pause Next Image
 

 Photo Archive

 
Selection Checkbox
Picture Size
1.02.14 Looking Down the Face of Abutment 2 Backwall.jpg
1.02.14 Looking Down the Face of Abutment 2 Backwall
800 x 533156 KB
1.02.14 Pier 5 Diaphram.jpg
1.02.14 Pier 5 Diaphram
800 x 533191 KB
1.03.13 Prepping Pier 3 Coffer Rings Facing Upstream.JPG
1.03.13 Prepping Pier 3 Coffer Rings Facing Upstream
800 x 53379 KB
1.04.13 Pier 5 Right Upstation Caisson Rebar Cage.JPG
1.04.13 Pier 5 Right Upstation Caisson Rebar Cage
800 x 533107 KB
1.08.13 Pier 3 Coffer Ring Facing Downstream.JPG
1.08.13 Pier 3 Coffer Ring Facing Downstream
800 x 53373 KB
1.11.13 Abutment 1 Left Upstation Wing Wall.JPG
1.11.13 Abutment 1 Left Upstation Wing Wall
800 x 53395 KB
1.31.13 Rebar in Pier 5 Footer.JPG
1.31.13 Rebar in Pier 5 Footer
800 x 533135 KB
10.01.13 Inside of Abutment 2 Facing Downstation at Pile.jpg
10.01.13 Inside of Abutment 2 Facing Downstation at Pile
800 x 533184 KB
10.03.13 Ohio Backspan Formed Pile Cluster Caps for Falsework.jpg
10.03.13 Ohio Backspan Formed Pile Cluster Caps for Falsework
800 x 533171 KB
10.03.13 Standing to the Left of Pier 1 Facing Upstation.jpg
10.03.13 Standing to the Left of Pier 1 Facing Upstation
800 x 533190 KB
10.24.13 Standing on Barge Causeway Looking up Facing Towards Abutment 1.jpg
10.24.13 Standing on Barge Causeway Looking up Facing Towards Abutment 1
800 x 533172 KB
10.25.13 Standing on Bridge Deck Facing Downstation.jpg
10.25.13 Standing on Bridge Deck Facing Downstation
800 x 533294 KB
11.01.13 Standing by CSX Tracks Facing Towards Pier 3(Zoomed In).jpg
11.01.13 Standing by CSX Tracks Facing Towards Pier 3(Zoomed In)
800 x 533249 KB
11.01.13 Taken From Upstream Facing Towards Abutment 1 Thru Pier 3(Zoomed In).jpg
11.01.13 Taken From Upstream Facing Towards Abutment 1 Thru Pier 3(Zoomed In)
800 x 533193 KB
11.01.13 Taken From Upstream Facing Towards Pier 2 and Pier 3.jpg
11.01.13 Taken From Upstream Facing Towards Pier 2 and Pier 3
800 x 533168 KB
11.13.13 Forming Abutment 2 Footer.jpg
11.13.13 Forming Abutment 2 Footer
800 x 533219 KB
11.13.13 Picking Rebar Cage for Pier 5 Diaphram(Zoomed In).jpg
11.13.13 Picking Rebar Cage for Pier 5 Diaphram(Zoomed In)
800 x 533176 KB
11.13.13 Pier 3 Strut Falsework.jpg
11.13.13 Pier 3 Strut Falsework
800 x 533169 KB
11.29.13 Pouring Pier 3 Strut.jpg
11.29.13 Pouring Pier 3 Strut
800 x 533178 KB
12.12.13 Face of MSE Wall at Abutment 2.jpg
12.12.13 Face of MSE Wall at Abutment 2
800 x 533188 KB
12.12.13 Looking Down the Face of Abutment 2 MSE Wall.jpg
12.12.13 Looking Down the Face of Abutment 2 MSE Wall
800 x 533173 KB
12.13.13 Standing to the Right of Pier 1 Facing Upstation.jpg
12.13.13 Standing to the Right of Pier 1 Facing Upstation
800 x 533115 KB
12.26.13 Pier 3.jpg
12.26.13 Pier 3
800 x 533218 KB
12.27.13 Standing on KY Riverbank Facing Upstation at Drift Against KY Falsework.jpg
12.27.13 Standing on KY Riverbank Facing Upstation at Drift Against KY Falsework
800 x 533247 KB
2.20.13 Bottom Ring of Pier 2 Coffer Facing Upstream.JPG
2.20.13 Bottom Ring of Pier 2 Coffer Facing Upstream
800 x 533101 KB
2.22.13 Pouring Pier 5 Footer Facing Southeast.JPG
2.22.13 Pouring Pier 5 Footer Facing Southeast
800 x 53376 KB
3.27.13 Pier 2 Stem Rebar Facing Upstream.JPG
3.27.13 Pier 2 Stem Rebar Facing Upstream
800 x 533102 KB
5.01.13 Formwork for Pier 5 Cap.JPG
5.01.13 Formwork for Pier 5 Cap
800 x 533120 KB
5.01.13 Pier 5 Stem.JPG
5.01.13 Pier 5 Stem
800 x 53383 KB
5.22.13 Pier 2 Stem.JPG
5.22.13 Pier 2 Stem
800 x 53377 KB
5.31.13 Rebar at Abutment 1 Back Wall.JPG
5.31.13 Rebar at Abutment 1 Back Wall
800 x 53395 KB
6.14.13 KY Backspan Falsework.JPG
6.14.13 KY Backspan Falsework
800 x 533127 KB
6.14.13 Pouring Pier 3 Stem 1st Lift Facing Upstream.JPG
6.14.13 Pouring Pier 3 Stem 1st Lift Facing Upstream
800 x 53371 KB
6.27.13 KY Backspan Falsework Facing Upstation.JPG
6.27.13 KY Backspan Falsework Facing Upstation
800 x 53399 KB
7.03.13 Pier 3 Stem Formwork 2nd Lift.JPG
7.03.13 Pier 3 Stem Formwork 2nd Lift
800 x 53383 KB
7.03.13 Pre-Tying Pier 5 Cap Rebar Cage.JPG
7.03.13 Pre-Tying Pier 5 Cap Rebar Cage
800 x 533132 KB
7.17.13 Rebar at Pier 2 Diaphram Upstation Side Facing Downstream.jpg
7.17.13 Rebar at Pier 2 Diaphram Upstation Side Facing Downstream
800 x 533272 KB
7.25.13 Lifting Rebar Cage of Pier 3 Upstream Side of 2nd Lift(2).jpg
7.25.13 Lifting Rebar Cage of Pier 3 Upstream Side of 2nd Lift(2)
480 x 640152 KB
7.29.13 Splicing up Girder Line 5 Span 1 Over the CSX Tracks.jpg
7.29.13 Splicing up Girder Line 5 Span 1 Over the CSX Tracks
800 x 533183 KB
8.01.13 Standing on Top of Abutment 1 Facing Upstation.jpg
8.01.13 Standing on Top of Abutment 1 Facing Upstation
800 x 533224 KB
1 - 40Next
 

 News Releases

 
 

 Virtual Tour (New Bridge)

 
Get Microsoft SilverlightVirtual Tour (New Bridge)
 

 Construction Consultant: FIGG Engineering