|
For informational/historical purposes only.
08-09-06 ODOT Announces
$14.5 Million In Funding For Community Enhancements >>
List of 2006 Transportation Enhancement Projects
|
Ohio Department of
Transportation |
|
2006
Transportation Enhancement Projects |
|
|
Central Ohio |
|
Project |
Type |
Description |
Estimated Award |
|
Main Street Corridor Enhancement
Madison County Village of West Jefferson |
Scenic |
Decorative street lighting, mast arms for three
signals, benches, trash receptacles and landscaping along downtown
Main Street. |
$464,000 |
|
State Route 95 Sidewalk
Marion County Marion Township
|
Bicycle/Ped. |
Construct 2,500 feet of sidewalk and curb
along SR 95 from Grave Creek Ditch to Jamesway Drive. |
$750,184 |
|
South Main Street Bicycle/Pedestrian Bridge
Licking County Village of Granville
|
Bicycle/Ped. |
Construct 150-foot long and eight-foot wide
bike/ped. bridge to span Raccoon Creek to the existing vehicular
bridge located on South Main Street (State Route 661). |
$290,400 |
|
Big Run Road Bridge Rehabilitation
Knox County
|
Historic |
Rehabilitation of historic Big Run Road
Bridge over the Kokosing State Scenic River. |
$573,760 |
|
Northwest Ohio |
|
Project |
Type |
Description |
Estimated Award |
|
Pioneer Streetscape Improvements
Williams County City of
Pioneer |
Scenic |
5,000 feet of streetscape. Primarily sidewalk
removal/replacement, curb ramps, brick inlays, decorative lighting
to match current, new trees to replace those scheduled for
removal, pavement grinding, asphalt surface course, new signal
heads. |
$667,140 |
|
Blanchard River Greenway Phase II
Hancock County Hancock Park District
|
Bicycle/Ped. |
Construct 1,390 foot long Blanchard River
Greenway Bike Path connector and underpass at CSX Railroad bridge
to complete the bike path system from downtown Findlay to
Riverside Park. |
$498,520 |
| Spencerville Downtown Streetscape
Allen County Village of Spencerville |
Scenic |
Enhance streetscape along State Route 66, between
Second Street and Fourth Street. Includes brick pavers, trees,
shrubs, benches and trash receptacles. |
$471,710 |
|
Eastown Road Phase IV Enhancement
Allen County Allen County Engineers Office |
Scenic |
Landscape enhancements to the proposed one mile
boulevard extension of Eastown Road between State Route 117 and
Elm Street. |
$74,800 |
|
Bluffton Downtown Streetscape Phase I
Allen County Village of Bluffton
|
Scenic |
Bluffton downtown streetscape improvements on
Main Street (State Route 103), from Jefferson Street to College
Avenue. Includes sidewalks with decorative brick pavers,
decorative lighting, landscaping, benches and trash receptacles.
|
$1,087,249 |
|
Northeast Ohio |
|
Project |
Type |
Description |
Estimated Award |
|
Western Reserve Greenway Phase III
Ashtabula County Ashtabula County
Metroparks
|
Bicycle/ Ped. |
Construct 5.83 miles of 10-foot-wide asphalt
trail on abandoned railroad right of way in Rome and Orwell
townships. Project will complete paving of Western Reserve
Greenway Trail. |
$464,146 |
|
Union Cemetery Bridge Rehabilitation
Ashtabula County Morgan Township
|
Historic |
Rehabilitation of historic Pratt Through
Truss Bridge. Includes rehabbing concrete abutments, new wood deck
and painting of the bridge. |
$275,671 |
|
Loudenville Bike and Pedestrian Bridge
Ashland County Village of Loudenville
|
Bicycle/Ped.
|
Construct a bike/ped. bridge to connect two
parks, and on a larger scale, Mohican State Park and the Village
of Loudenville. |
$234,960 |
|
Marshallville Community Connection
Wayne County Village of Marshallville
|
Bicycle/Ped. |
Construct new sidewalks that will connect the
community park to the central business district (downtown) to the
local school and to the future rails to trails project (Orrville
to Clinton). |
$283,672 |
|
State Route 14/46/Main Street Sidewalks
Columbiana County City of Columbiana
|
Bicycle/Ped. |
Construct new sidewalk along SR 14, SR 46 and
Main Street. Add sidewalk to the recently widened and improved
intersection of SR 14/46 and State Route 164 and SR 14/46 and
North Main Street. |
$131,588 |
|
East Lincolnway Enhancements
Columbiana County Village of Lisbon
|
Scenic |
Streetscape of East Lincolnway (U.S. Route
30) from Jackson to Jefferson streets. New sidewalks and curb
ramps, decorative lighting and landscaping. |
$371,842 |
Holmes County Trail Phase II
Holmes County Holmes County Park
District |
Bicycle/Ped.
|
Construct 4.72 miles of buggy/bike path from
Killbuck to Millersburg, including the rehabilitation of four
bridges and the replacement of one bridge. |
$948,624 |
|
Main Street Downtown Streetscape
Tuscarawas County Village of Sugarcreek
|
Scenic |
Downtown streetscape on Main Street from
Factory Street to Broadway Street and from Main Street to the
railroad tracks. Includes sidewalks and curbs, underground wires,
lighting, signing and landscaping. |
$517,500 |
|
Eastern Ohio |
|
Project |
Type |
Description |
Estimated Award |
|
Conotton Trail House
Harrison County
|
Bicycle/Ped. |
Construction of a 16x40 facility central to the 11-mile Conotton
Trail. Will house restrooms and concessions for trail users. |
$30,800 |
|
Wills Creek Valley Drive Sidewalk
Guernsey County City of Cambridge |
Bicycle/Ped. |
Adding sidewalk along one side of Wills Creek Valley Drive between
Deerpath Drive and Cambridge School Campus Drive. |
$98,586 |
|
Leatherwood Creek Connecting Corridor
Guernsey County
|
Bicycle/Ped. |
Construct trail along railroad corridor from
Cambridge to Lore City, approximately 1.2 miles.
|
$277,600 |
|
Southeast Ohio |
|
Project |
Type |
Description |
Estimated Award |
Bainbridge Sidewalks
Ross County Village of Bainbridge |
Bicycle/Ped. |
Construct new sidewalk along both sides of
George Washington Highway (U.S. Route 50) to connect to local
stores and church. Also a new walkway along South Quarry Street to
connect to new Bainbridge Civic Center. |
$181,541 |
South Connector Enhancements
Pike County City of Waverly |
Scenic |
Aesthetic and roadway enhancements to new
South Connector route. Includes sidewalks, decorative lighting,
decorative bridge railings and decorative street poles and mast
arms. |
$202,894 |
Jackson Bicycle/Pedestrian Path
Jackson County City of Jackson |
Bicycle/Ped. |
Construct bike/ped. Path from Westview
Elementary School to the downtown area. Path will run alongside
existing city streets where there are no sidewalks and on
city-owned abandoned railroad beds. |
$267,220 |
Mt. Olive Covered Bridge Rehabilitation
Vinton County |
Historic |
Rehabilitate covered bridge on Mt. Olive Road
(Township Road 46R) in Richland Township. Replace rotted members,
stringers, verticals, wood siding, abutments and roof. |
$311,349 |
Oldtown Aqueduct Trail Connector
Hocking County City of Logan |
Bicycle/Ped. |
Paved bike/pedestrian lane along Front
Street, between Oldtown Creek Bridge and Aqueduct Park. Safely
link Aqueduct Park, Oldtown Creek Preserve and the Hocking County
fairgrounds. |
$28,086 |
Nelsonville Bike path
Athens County City of Nelsonville
|
Bicycle/Ped. |
Construction of a 1.86-mile trail extension
from the city of Nelsonville to connect to the existing
Hockhocking Adena Bikeway. Modify former railroad bridge to
accommodate trail. |
$800,800 |
River Trail Phase II
Washington County City of Marietta |
Bicycle/Ped. |
Construct Phase II of Riverfront Trail to the
end of Fifth Street. Includes streetscape improvements. |
$658,497
|
|
Southwest Ohio |
|
Project |
Type |
Description |
Estimated Award |
|
Second Street Revitalization
Brown County Village of Ripley
|
Scenic |
Streetscape 600 feet on both sides of
Second Street between Main and Market streets. Includes sidewalks,
curbing, electric and landscaping. |
$462,046 |
|
Western Ohio |
|
Project |
Type |
Description |
Estimated Award |
|
South Main Walkway Extension and Lighting
Mercer County Village of Rockford |
Scenic |
Construct new sidewalks and curbs,
landscaping and trees, benches, trash receptacles, bury utilities,
decorative lighting, from the south corporation line of the
village to intersection of U.S. Route 33/State Route 118. |
$496,000 |
|
Eastern Avenue Corridor Improvements
Mercer County Village of St. Henry |
Scenic |
Construct new sidewalks and curbs, street
lighting, decorative fencing, cross walks and signalization,
landscaping, trash receptacles, bury utility lines, other scenic
beautification from the south corporation line of the village to
intersection of State Route 118/State Route 119. |
$198,000 |
|
Main Street Improvements
Mercer County City of Celina |
Scenic |
Remove/replace sidewalks/curbs. Add new
sidewalks, landscaping, trees, benches, trash receptacles and
decorative lighting on Main Street. |
$509,520 |
|
Public Square Streetscape Enhancement
Darke County City of Greenville |
Scenic |
Construct new sidewalks, brick paver inlays,
curb and gutter, decorative lighting, landscaping and hanging
planters for roundabout in citys Public Square. Includes
relocation of overhead wiring, way finding signage, pocket park
and a painted mural. |
$539,458 |
|
Abandoned Railroad Corridor Acquisition
Darke County Village of Bradford |
Bicycle/Ped. |
Acquisition of railroad corridor and
construction of extension of Bradford Railroad Trail. 1,580-foot
long concrete trail with pavers depicting railroad track,
landscaping, trees, benches, trash receptacles, decorative
lighting and signage from community park to historic railroad
tower. |
$64,000 |
|
Court Avenue Rehabilitation
Logan County City of Bellefontaine |
Historic |
Rehabilitate Court Street (On Register
oldest concrete street in America). Add decorative lighting, new
sidewalks and pavers, pedestrian walkways in alley, trash
receptacles, trees and repave the parking lot between Main and
Opera streets. |
$52,000 |
|
Scioto Street Enhancement
Champaign County City of Urbana |
Scenic |
New sidewalks, curb and gutter, decorative
lighting, landscaping, bury utilities from intersection of East
Lawn Avenue to Mercy Memorial Hospital. |
$1,216,000 |
Related Links:
Press Release
ODOT Announces $14.5 Million In Funding For Community Enhancements
Transportation Enhancement Projects
History 1992-2005
|
|