KeepingOhio'sEconomyMoving-SM.pngODOT's 2013 Construction Season Highlights  

Roll over the map to view highlights of this season's construction activities from the ODOT District serving that area. Click on a district for more information details and links. 

ODOT District Map, Click a district to visit its link. District 1District 2District 3District 4District 5District 6District 7District 8District 9District 10District 11District 12

2013 Ohio Construction Fast Facts

 

 

 Please Remember Work Zone Safety!

 

Traveling through construction zones requires extra attention, and ODOT urges drivers to be careful, avoid distractions and obey posted speed limit reductions in all work areas across the state.

​Visit ODOT's Look Up, Hang Up and Go Slow For the Cone Zone! page for more Work Zone Safety information.

 

District 1 Highlights - Click here for a District Project Map - District 1  District 1 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
Fourth St. and Reservoir Rd. Bridge Replacements over Interstate 75, Allen County
 
Description

Replacement of the Fourth St. and Reservoir Rd. bridges over I-75 is the first of three projects which will reconstruct I-75 from the Auglaize County line to just north of SR 81 through Allen County and the city of Lima. The project was largely completed last year but finish work will take place this season. Begin: February 2012 Complete: May 2013

More info at: http://www.dot.state.oh.us/
districts/D01/Pages/I75-Reconstruction.aspx

RouteInterstate 75
Ohio CountyAllen
PID87965
Est. StartFebruary 2012
Est. EndDecember 2012
 
Project
I-75 Reconstruction, Fourth Street to SR 81
 
Description

Reconstruction of the existing two lanes of pavement, replacement of all mainline and overhead bridges and reconstruction of the interchanges at Fourth St., SR 81 and SR 309 is the second of three projects which will reconstruct I-75 from the Auglaize County line to SR 81 through Allen County and the city of Lima.

More info at: http://www.dot.state.oh.us/
districts/D01/Pages/I75-Reconstruction.aspx

RouteInterstate 75
Ohio CountyAllen
PID76691
Est. StartMarch 2013
Est. EndOctober 2015
 
Project
State Route 117/309 @ I-75    
 
Description
Safety upgrade project which includes installation of a raised curb median, construction of roadside curb and installation of drainage from the interchange with Interstate 75 to Bowman Rd. on the east side of Lima.
 
RouteState Route 117/309
Ohio CountyAllen
PID75467
Est. StartMarch 2013
Est. End November 2015
 
 

District 2 Highlights - Click here for a District Project Map - District 2  District 2 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
Interstate 75/475 Interchange Upgrade
Description

Lane restrictions in both directions on I-475, from I-75 to Monroe St. for reconstruction. Various ramps are closed within the project. Detours are posted.

More info at: http://www.dot.state.oh.us/districts/
D02/Pages/
Interstate75475InterchangeUpgradeProject.aspx

RouteInterstate 75/475
Ohio CountyLucas
PID77255
Est. StartJune 2010
Est. EndNovember 2013
 
Project
SR 2 Anthony Wayne Bridge
Description

Rehabilitation of the Anthony Wayne Bridge (SR 2) bridge over the Maumee River. Intermittent lane restrictions will be possible on the structure this year. SR 2 between Broadway St. and Clark St. will be closed for approximately 19 months. Date will be announced. This closure will be announced. Intermittent lane restrictions are also possible on Miami St. between Greenwood Ave. and Nevada St.

More info at: http://www.dot.state.oh.us/districts
/D02/High%20Level%20Bridge%20Project/

RouteState Route 2
Ohio CountyLucas
PID80551
Est. StartSpring 2013
Est. EndNovember 2015
 
Project
I-475  Bridge Widening 
Description

Widen and reconstruct surface of the I-475 bridge over the Ohio Turnpike (I-80/I-90). Overnight and weekend lane restrictions are possible on I-475 at the Ohio Turnpike and on Ohio Turnpike (I-80/I-90) at I-475. Two lanes will be maintained during peak travel times.

RouteI-475
Ohio CountyLucas
PID80695
Est. StartSummer 2013
Est. EndDecember 2014 ​
 
Project
Interstate 475: Corey & Talmadge Road Ramp Improvements, Lucas County
Description

Lane restrictions at the intersection of Corey & Whiteford roads and Sylvania Ave. for turn lane and signal installation. Expect a traffic shift on the ramp from eastbound I-475 to Corey Rd. for signal and turn lane installation. Expect traffic shifts on westbound I-475 from Woodley Rd. to Talmadge Rd. and on the ramp from westbound I-475 to Talmadge Rd. for ramp improvement.

RouteInterstate 475
Ohio CountyLucas
PID94619
Est. StartSummer 2013
Est. EndNovember 2013
 
 

District 3 Highlights - Click here for a District Project Map - District 3  District 3 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
I-76 Pavement Replacement
Description

Full-depth replacement of asphalt, including repairs to the concrete base, from SR 57 to the Summit County line. New drainage, guardrails, signing and striping. Cable median barrier will be installed from I-71 to the Summit County line. One lane of traffic in each direction will be maintained throughout construction. During construction of the ramp improvements at SR 57 and SR 94, traffic traveling west will transition to the eastbound side of I-76 (using crossovers), with one lane of traffic in each direction traveling in the eastbound lanes.

RouteInterstate 76
Ohio CountyMedina
PID77474
Est. StartApril 2012
Est. EndSeptember 2013 
 
Project
I-71 Widening
 
Description

Three projects on I-71 will add a third lane in each direction to the only two-lane section of roadway between Columbus and Cleveland. The first project, from SR 95 to the Richland County line, began last year and is expected to be complete this fall. Project 2, from just north of U.S. 36 to north of SR 61, began in March of this year and Project 3, from SR 61 to SR 95, will begin in April. Projects 2 and 3 are expected to be complete in 2015. Two lanes of traffic will be maintained in each direction. Project is located in ODOT District ​ 6, but is partially administered through ODOT District 3

RouteInterstate 71
Ohio CountyDelaware, Morrow
PID86916 +
Est. StartMarch 2012
Est. EndOctober 2015
 
Project
I-90 Bridge Replacements
Description

Replacement of twin bridges on I-90 in Lorain County over the Black River and Ford Rd. The project includes bridge widening to maintain two lanes and paving Ford Rd. from the project limits to Gulf Rd. Two lanes of traffic will be maintained in each direction. Lane width will be 11 feet.

RouteInterstate 90
Ohio CountyLorain
PID25734
Est. StartMarch 2012
Est. EndOctober 2013 
 
Project
State Route 58, Lorain County
 
Description

Railroad grade separation project on SR 58, just north of SR 18, in the village of Wellington. The project will construct an underpass at the CSX railroad tracks on a new roadway alignment. Short-duration detours will be necessary throughout construction. ​

RouteState Route 58
Ohio CountyLorain
PID23104
Est. StartApril 2013
Est. EndSeptember 2014
 
 

District 4 Highlights - Click here for a District Project Map - District 4  District 4 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
I- 90 Reconstruction
Description

Reconstruction of I-90 from the Pennsylvania state line to just east of SR 193, approximately six miles of pavement. During this project, two lanes of traffic will be maintained on I-90 east and west. Project also includes six bridge reconstructions.

RouteInterstate 90
Ohio CountyAshtabula
PID25869
Est. StartSeptember 2011
Est. EndNovember 2013
 
Project
Interstate 271, Summit County
Description

Pavement replacement on I-271 from Broadview Rd. to the Ohio Turnpike. Project also includes repairs to nine bridges along I-271. A minimum of two lanes of traffic will be maintained in each direction during peak traffic times. The ramp from I-271 northbound to I-77 northbound will be closed for 90 days.

RouteInterstate 271
Ohio CountySummit
PID18710
Est. StartMay 2013
Est. End November 2015
 
Project
Interstate 90, Ashtabula County
 
Description

Reconstruction of I-90 from just east of Clay St. to the Penn Central railroad. This project also includes bridge replacements and modifications to the I-90/SR 11 interchange. Two lanes of traffic will be maintained on I-90 during peak traffic times. Various side streets will be closed during the project.

RouteInterstate 90
Ohio CountyAshtabula
PID76747
Est. StartFebruary 2013
Est. EndNovember 2016
 
Project
Interstate 77, Stark County
 
Description

Resurfacing of I-77 from the Tuscarawas County line to the southern Canton corporation limit. Project also includes bridge repairs to ten structures. Two lanes of traffic will be maintained in each direction of I-77 during peak traffic hours. Dueber Ave. will be closed for 75 days.

RouteInterstate 77
Ohio CountyStark
PID77885
Est. StartAugust 2012
Est. EndJune 2015
 
Project
Interstate 80, Trumbull County
 
Description

Resurfacing and bridge replacement project along I-80 from SR 193 to Mt. Everett Rd. This project will include the widening and re-decking of the I-80 bridges over Logan Way and Sampson Rd. Traffic will be maintained on I-80.

RouteInterstate 80
Ohio CountyTrumbull
PID76411
Est. StartJanuary 2013
Est. EndOctober 2013
 
 

District 5 Highlights - Click here for a District Project Map - District 5  District 5 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
SR 158/I-70 Interchange Upgrade
Description

Bridge replacement and road widening as part of interchange upgrade. The eastbound entrance and exit ramp closures will occur on alternating ramps for a maximum of 19 days, weather permitting. Short duration closures will occur on I-70 during specific project activities. SR 158 traffic will be maintained at all times. Resurfacing of I-70 in the area of the interchange will be performed at night with one lane maintained in each direction at all times.

RouteState Route 158 and Interstate 70
Ohio CountyLicking
PID84700
Est. StartMay 2012
Est. EndOctober 2013
 
Project
I-70 Bridge Rehabs
Description

Bridge rehabilitation work will be performed at three separate locations on I-70 (Blacklick Trail, SR 256 and Palmer Road). Closure dates and detour information will be communicated by message boards and media releases.

•    Blacklick Trail and  SR 256
One lane will be maintained in each direction, with work being performed on four separate weekends, closing I-70 from Friday at 7 p.m. to Monday at 4 a.m. 
     Palmer Road
One lane will be maintained in each direction, with work being performed on two separate weekends, closing I-70 from Friday at 7 p.m. to Monday at 4 a.m.
RouteInterstate 70
Ohio CountyFairfield, Licking
PID88957
Est. StartJune 2013
Est. EndSeptember 2013
 
Project
I-70 Resurfacing
Description

Resurfacing and associated work on the section of I-70 extending from the SR 513 interchange to the Belmont County line. Two lanes of traffic will be maintained in each direction from 2 p.m. to 6 p.m., Monday through Thursday, and 11 a.m. through 6 p.m., Friday through Sunday, for the duration of the project. Work requiring a lane closure will be performed outside of those hours.

RouteInterstate 70
Ohio CountyGuernsey
PID87595
Est. StartJune 2013
Est. EndNovember 2013
 
Project
I-70 Bridges at Canal Road
Description

Replace and widen existing structures on I-70 over Canal Rd., located two miles west of the SR 79 interchange. Two lanes of traffic will be maintained at all times, with the exception of intermittent lane restrictions. Canal Rd. will be closed for 30 days beginning in mid-March. The Park Trail, beneath the structures will be closed for a total of 10 weeks.

RouteInterstate 70
Ohio CountyLicking
PID85540
Est. StartMarch 2013
Est. EndNovember 2014
 
Project
I-70/SR 79 Interchange Reconfiguration
Description

Reconfiguration of ramps at the I-70/SR 79 interchange. Work on I-70 and SR 79 will create various lane and ramp closures. Closure dates and detour information will be communicated by message boards and media releases.

Route Interstate 70, Licking County
Ohio CountyLicking
PID84695
Est. StartMay 2013
Est. EndSeptember 2013
 
Project
I-70 Bridge Replacement
Description

Replace bridge, just west of the village of Gratiot. Two lanes of traffic will be maintained at all times.

RouteInterstate 70
Ohio CountyLicking
PID81253
Est. StartJune 2013
Est. EndNovember 2013
 
 

District 6 Highlights - Click here for a District Project Map - District 6  District 6 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
I-71/670 Columbus Crossroads - Phase I
Description

Reconstruction of the I-71/670 interchange began in 2011. This $200 million project includes 22 bridges, 38 retaining walls and the first-ever cultural wall in the State of Ohio. All travel lanes are expected to open this fall, however, final completion for the project is in the fall of 2014.

More info at: http://www.ODOT71670.org

RouteInterstates 71/670
Ohio CountyFranklin
PID77369
Est. StartSeptember 2011
Est. EndSeptember 2014
 
Project
Interstate 270/U.S. Route 23 (The North Side Fix), Franklin County
Description

Widen U.S. 23 from four to six lanes between I-270 and Lazelle Road. The project will also reconfigure two ramps at the I-270/US 23 interchange and construct two northbound express lanes on U.S. 23 called “the trench” because they will travel below the surface of the road.

Route Interstate 270/U.S. Route 23
Ohio CountyFranklin
PID81739, 81746, 81747, 81748
Est. StartJuly 2013
Est. EndOctober 2015
 
Project
Interstate 270 Widening, Franklin County
Description

Widen I-270 from two to four lanes between I-71 and U.S. 23 on the south side of Franklin County. Two lanes of I-270 will be maintained in each direction with one-lane closures during overnight hours.

Route Interstate 270
Ohio CountyFranklin
PID92610
Est. StartAugust 2013
Est. EndSeptember 2014
 
Project
I-71 Widening
Description

Three projects on I-71 will add a third lane in each direction to the only two-lane section of roadway between Columbus and Cleveland. The first project, from SR 95 to the Richland County line, began last year and is expected to be complete this fall. Project 2, from just north of U.S. 36 to north of SR 61, began in March of this year and Project 3, from SR 61 to SR 95, will begin in April. Projects 2 and 3 are expected to be complete in 2015. Two lanes of traffic will be maintained in each direction. Project is located in ODOT District ​ 6, but is partial being administered through ODOT District 3​

RouteInterstate 71
Ohio CountyDelaware, Morrow
PID86916 +
Est. StartMarch 2012
Est. EndOctober 2015
 
Project
Pickaway East-West Connector -  (Phase 1A)
Description

New interchange on U.S. 23 and connector to Rickenbacker Airport​. This phase includes widening and realignment of Duvall Road to a total of three lanes from U.S. 23 to Ashville Pike and building a bridge over the railroad on Duvall Road. More details on D-6's Pickaway East West Connector Page.

RouteU.S. Route 23
Ohio CountyPickaway
PID83666
Est. StartNovember 2012
Est. End2014
 
 

District 7 Highlights - Click here for a District Project Map - District 7  District 7 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
SR 185 Realignment
Description

SR 185 (Jackson St.) in Versailles will be realigned between Catalpa Dr. and SR 47 (Greenlawn Ave.). This will create a new intersection at SR 185 and SR 47. The proposed work will include a new three lane roadway, curb and gutter, sidewalk and utility relocation work. Motorists will encounter temporary road closures at each end of the new realignment on SR 185.

RouteState Route 185, Darke County
Ohio CountyDarke
PID93852
Est. StartMay 2013
Est. EndOctober 2013
 
Project
SR 794 Realignment
Description

SR 794 will be realigned between Peacock Rd. and Sparrow Rd. (between U.S. 69 and SR 72) in Springfield. This area is adjacent to the Ohio Air National Guard and Army National Guard facilities. Motorists will encounter temporary road closures at each end of the new realignment of SR 794.​

RouteState Route 794
Ohio CountyClark
PID78677
Est. StartMarch 2013
Est. EndOctober 2013
 
 

District 8 Highlights - Click here for a District Project Map - District 8  District 8 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
I-71 Jeremiah Morrow Bridge Replacement
Description

Replacement of the two Jeremiah Morrow spans over the Little Miami River. One lane of traffic will be maintained in both directions.

More info on the Jeremiah Morrow Bridge Project site

RouteInterstate 71
Ohio CountyWarren
PID22950
Est. StartAugust 2010
Est. EndMay 2016 
 
Project
Hamilton Co. I-75 Reconstruction
Description

Reconstruction of 1.2 miles of I-75 including the replacement of structures over Clifton Avenue and Mitchell Avenue;  improvement to Mitchell Avenue and interchange. Lane closures permitted during nighttime hours.

More info at: http://www.dot.state.oh.us/districts/
D08/MillCreekExpress/

RouteInterstate 75
Ohio CountyHamilton
PID82278
Est. StartJune 2011
Est. EndJuly 2014
 
Project
Waldvogel Viaduct and Sixth Street Expressway Improvement
Description

Removal of existing Waldvogel Memorial Viaduct, including four ramps to Elberon and Warsaw Avenues. Replacement of structures for the four ramps to Elberon and Warsaw and replacement of structures for the connection to the Sixth Street Expressway. Removal and replacement of roadways for the required portions of River Road, Elberon Avenue, Warsaw Avenue, State Avenue, Evans Street and Maryland Avenue. One lane of traffic maintained in each direction.

RouteU.S. Route 50
Ohio CountyHamilton
PID20082
Est. StartJuly 2011
Est. EndOct. 2014
 
Project
Interstate 71, Hamilton County
I-71 at Pfeiffer Road Improvement
Description

Improve approximately one mile of I-71 by adding a northbound auxiliary lane between Pfeiffer Rd. and I-275, and add dual left turn lanes on Pfeiffer Rd. Traffic will be maintained.​

Route Interstate 71
Ohio CountyHamilton
PID83077
Est. StartJanuary 2013
Est. EndJune 2014
 
Project
I-75/Hopple Street Interchange Improvement
Description

Reconstruction and improvement of the I-75/Hopple St. (exit 3) interchange. Four lanes of traffic will be maintained in both directions.​

RouteInterstate 75
Ohio CountyHamilton
PID76257
Est. StartMarch 2013
Est. EndJune 2016
 
 

District 9 Highlights - Click here for a District Project Map - District 9  District 9 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
U.S. 52 Bridge Rehab and Pavement Resurfacing
Description

The “Spaghetti Bowl” project is the bridge rehabilitation and resurfacing of U.S. 52 between the  SR 239 interchange and the Scioto River bridges at the Portsmouth corporation limit. The $12 million project includes the rehabilitation of 14 bridges and resurfacing approximately 12 lane miles in a design-build format. It will be phased out over two construction seasons, with the majority of bridge work being completed this year and resurfacing in the next.​

RouteU.S. Route 52
Ohio CountyScioto
PID80094
Est. StartMarch 2013
Est. EndSeptember 2014
 
 

District 10 Highlights - Click here for a District Project Map - District 10  District 10 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
Nelsonville Bypass - Phases III
Description

The Nelsonville Bypass is a more than $150 million project consisting of 8.5 miles of new four lane highway of U.S. 33 near Nelsonville, Ohio.  Motorists traveling through the eastside of Nelsonville on U.S. 33 may encounter short term lane closures with traffic being maintained by a flagger.  Construction crews will be finalizing bridge work and paving of the eastside of the bypass.

For more details, visit the Nelsonville Bypass Site 

RouteU.S. Route 33
Ohio CountyAthens, Hocking
PID23846 and 79577
Est. StartSeptember 2009 
Est. EndPhase III: November 2013.
 
Project
U.S. Route 33/SR 664 Interchange Reconstruction
Description

The reconstruction of U.S. 33 and SR 664 intersection includes the state’s first-ever double roundabout interchange.  Motorists traveling through the U.S. 33 and SR 664 interchange in Hocking County will encounter possible lane closures on US 33.  Although two lanes of traffic will be maintained on SR 664 during the duration of the project, motorists can expect traffic pattern changes.  Visit ODOT’s Official US 33/SR 664 Double Roundabout website for more information.​

RouteU.S. Route 33/SR 664 Interchange Reconstruction
Ohio CountyHocking
PID80912
Est. StartMarch 2013
Est. EndNovember 2013
 
 

District 11 Highlights - Click here for a District Project Map - District 11  District 11 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
Interstate 77 Resurfacing 
Description

Four-lane resurfacing from Guernsey County line to just south of Newcomerstown​.

RouteInterstate 77
Ohio CountyTuscarawas
PID78245
Est. StartMay 2013
Est. EndJuly 2013
 
Project
Interstate 77 Resurfacing
Description

Four-lane resurfacing from New Philadelphia to Strasburg.

RouteInterstate 77
Ohio CountyTuscarawas
PID81725
Est. StartMay 2013
Est. EndOctober 2013
 
Project
Interstate 70 Bridge Replacement
Description

Bridge replacement at SR 9 Interchange in St. Clairsville.

RouteInterstate 70
Ohio CountyBelmont
PID25510
Est. StartMarch 2013​
Est. EndAugust 2014
 
Project
Interstate 70 Resurfacing
Description

Four-lane resurfacing between exit 213 and exit 218.​

RouteInterstate 70
Ohio CountyBelmont
PID77355
Est. StartMay 2013
Est. EndAugust 2013
 
Project
Interstate 70 Bridge Repair
Description
Bridge repair about a mile west of exit 213.
RouteInterstate 70
Ohio CountyBelmont
PID88897
Est. StartJuly 2013
Est. EndOctober 2013
 
Project
SR 7 Landslide Repair
Description

Landslide repair at Rush Run.

RouteState Route 7
Ohio CountyJefferson
PID81015
Est. StartJune 2012
Est. EndJuly 2014
 
Project
Interstate 70 Bridge Work
Description

Bridge deck replacement about a mile west of exit 208. ​

RouteInterstate 70
Ohio CountyBelmont
PID91548
Est. StartJuly 2013
Est. EndDecember 2013
 
 

District 12 Highlights - Click here for a District Project Map - District 12  District 12 Highlights - Click here for a District Project Map

 
Project
Description
  
Ohio County
  
  
  
  
Project
I-90 New WB Innerbelt Bridge
Description

Crews work to construct a new Innerbelt Bridge – the first of two – which will eventually carry westbound traffic. Multiple lane and ramp closures are expected. The existing I-90 bridge will remain open; however motorists are advised to Opt for the Alternate and use I-490 and I-77 to avoid the construction zone. The new westbound bridge is expected to be open to traffic during the fall of 2013 at which time it will carry traffic in both directions while the existing bridge is demolished and the new eastbound bridge is constructed. Begin: March 2011 Complete: December 2013 (westbound bridge)/December 2016 (eastbound bridge)

Visit: http://www.innerbelt.org/ for more info!

RouteInterstate 90
Ohio CountyCuyahoga
PID85531
Est. StartDesign Build Awarded: September 2010; Construction Began: March 2011
Est. EndDecember 2013
 
Project
Interstate 90 Reconstruction
Description

Crews have begun work for the major pavement reconstruction on I-90 between Morley and Paine roads. Motorists can expect the contra-flow traffic configuration through this work zone during the summer months. Lane closures are expected, but will not impact peak travel times.

Route Interstate 90
Ohio CountyLake
PID75479
Est. StartJanuary 2012
Est. EndAugust  2014
 
 

 2013 Ohio Construction Fast Facts

 
  • ODOT’s Calendar Year 2013 construction program includes nearly 1,000 new projects, and totals an estimated $2.3 billion
  • This year’s construction program includes close to $1.6 billion in resurfacing and roadway maintenance work. 
  • More than 100 projects will improve the interstate highways this year.
  • Six NEW mega projects – projects costing more than $50 million - will begin this year:
  • Pavement Replacement on Interstate 271 in Summit County = $53.2 million
  • The “North Side Fix” on Interstate 270/U.S. Route 23 in Franklin County = $71.1 million
  • Construction of the eastbound Cleveland Innerbelt Bridge = $320 million
  • Reconstruction of Interstate 75 in Allen County = $57.5 million
  • Widening of Interstate 71 in Morrow County = $54.6 million
  • Reconstruction of Interstate 75 and three interchanges in Allen County = $70.2 million
  • Four mega projects – projects costing more than $50 million – will continue this year:
  • The westbound Cleveland Innerbelt Bridge in northern Ohio
  • The Columbus Crossroads I-670/I-71 Interchange Reconstruction in central Ohio
  • The Jeremiah Morrow Bridge in southern Ohio
  • The Ironton-Russell Bridge replacement in southern Ohio
  • Other projects which having a significant impact on traffic include:
  • Rehabilitation of Anthony Wayne Bridge in Lucas County
  • Reconstruction of the Interstate 275/SR 32 interchange in Clermont County
  • Multi-year projects wrapping up this year include:
  • Interstate 75/475 Interchange upgrade, Lucas County
  • Widening of Interstate 71 in Morrow County
  • Reconstruction of Interstate 90 in Ashtabula County
  • Construction of the Nelsonville Bypass on U. S. Route 33 in Athens-Hocking counties
  • Interstate 71 has been under construction for nearly 15 years in an effort to widen the roadway from two to three lanes from Columbus to Cleveland. This year, work will continue to widen the roadway in northern Morrow County while projects in northern Delaware County and southern Morrow County will begin. Although two lanes of traffic will be maintained in both directions at all times, the work will result in a 25 mile-long work zone. The final section of the I-71 widening will conclude in 2015.
 
 

 Try rolling over the map above, or use the following breakdowns for more info on projects in your area:

 
 