1. State that materials conform to 638.02.
2. Document clearance between pipe and walls of trench: 6
inches (15 cm) minimum, 12 inches (30 cm) maximum. Ensure proper clearance
between water line and any utility crossing or underground structure.
3. Grade shaped to receive bell.
4. Type of sheeting and bracing used to support and
protect adjacent utilities.
5. Type and thickness of bedding.
6. State that trench was kept free from water.
7. State that pipe was carefully handled.
8. Tracer tape installed 1 foot (0.3 m) above top of pipe
extending full-length.
9. Joints installed according to manufacturer’s
recommendation.
10. Perform and document backfill as per 611
Type B and C conduits.
11. Document hydrostatic testing and disinfection as per 638.09
and 638.10.
12. Measure as per 638.19
and 638.20.