201 Clearing and Grubbing

Clearing and Grubbing

Scalping (201.04)

Clearing and Grubbing

General

The purpose of this section is to establish uniform practices for clearing, grubbing, scalping, and removing trees and stumps within the areas designated in the plans.

Some definitions are detailed below for clarity:

  1. “Clearing” is cutting down all of the trees and brush.
  2. “Grubbing” is clearing by digging up roots and stumps.
  3. “Scalping” is removing the remaining roots, sod, grass, agriculture crop, sawdust, and other vegetation so that the soil is completely exposed.  This does not include removing topsoil.

Varying interpretations as to the extent of removal are possible where these removals are set up on a lump sum basis.  It is necessary to exercise judgment in the administration of this item to accomplish the desired results.

Specification Changes

The main specification changes from 1997 to 2002 are as follows:

  1. All disposals refer to 105.16 and 105.17.
  2. The Engineer’s decision on which trees are to remove is minimized.
  3. The specifications no longer refer to the Right-of Way or the construction limits.
  4. Stumps are now counted for payment.
  5. The plans may detail whether to save or remove trees.
  6. Plan notes are used to better define the work.

Disposal of Materials

All material disposal in the 200-series CMS items refer to 105.16 and 105.17.  The following statement is in 201.01 and is repeated throughout the 200’s:

“Use all suitable excavation material in the work.  Alternatively, legally use, burn, or dispose of all material according to 105.16 and 105.17.”

The use, reuse, and/or disposal of these materials may be regulated. (See section “105.16 Borrow and Waste” of this  manual).

Policy

It is Department policy to remove only those trees that must be removed for the construction and maintenance of the highway and for the safety of the traveling public.  In certain circumstances, it is desirable to leave healthy trees in place.

Plan Notes

There are three plan notes that may be used by the Department to determine the extent of the clearing and grubbing work on the project. The following link describes those notes:

In every case, the plan will denote the limits of the clearing and grubbing.

Plan Note R101A

When Plan Note R101A is used, no trees will be specifically called out for removal. Everything is removed within the areas denoted in the plan.  In this case, the Contractor has the maximum risk if his field count is not accurate.  This note is often used on small projects.

Plan Note R101B

When Plan Note R101B is used, trees and stumps are marked for removal on the plan. This note is used where the designer can reasonably count all of the trees within the work limits.  This count should be accurate at the time of the count.

The count is not necessarily correct at the time of construction.  The Contractors are responsible to visit the site prior to the bid. This allows the Contractor to take tree growth into account.  Typical increase in growth is generally about 25 percent.  This depends on the time between the count and construction.

The Contractor should bring large discrepancies between the plan count and the actual conditions to the Department’s attention prior to the bid.

Plan Note R101C

When Plan Note R101C is used, everything in the plan limits is removed except for the trees denoted as “Do Not Disturb”.

The plan denotes some trees and stumps, where feasible.  In other locations, the plan denotes heavy wooded areas. An estimated count is given in the heavy wooded section.   This estimate is based on representative counts in the woods. 

There are inherent inaccuracies in this count.  The Contractor will be able to make an informed decision in his bid by the knowledge of how the count is made.  By denoting the type and accuracy of the tree counting, it minimizes the claims and change orders from this item of work.

Markings for trees to remain in place should be temporary and not result in an undesirable appearance beyond the life of the contract. 


Trees Located within the Plan Limits Allowed to Remain

Trees that are located within the plan clearing and grubbing limits technically must be removed.  There are circumstances, however, where the Engineer may consider leaving trees in place or making other changes to the contract.

It may be desirable to leave some trees because they are aesthetically pleasing and can provide structural value to an embankment or slope.  Leaving flowering trees and shrubs such as dogwood, redbud, hawthorn, and other attractive growth should be given serious consideration.  Special consideration should be given to rest areas or other specific nature locations.

The Project Engineer will contact the District Environmental Coordinator for recommendations on the attractiveness of trees to remain in place.

Where trees are allowed to remain in place, the area surrounding the trees should be cleared of undesirable undergrowth to provide an attractive appearance and to simplify maintenance.

Trees located within the plan work limits may not require removal because they are outside the clear zone.   It is required to remove trees within the clear zone or a minimum distance of about 30 to 40 feet (9 to 12 meters) from the edge of the travel lanes.  The actual clear zone distance depends on the roadway type.  The Project Engineer needs to contact the District Office of Production to give approval recommendations on the clear zone.

It is not necessary to remove trees beyond areas required for construction if the grading section is in a cut with a 3:1 back slope, or is in fill with a depth requiring a guardrail..

All trees considered for remaining in place must be in good condition.  A tree should be removed if it is dead, fallen, or unhealthy.

It may be necessary to remove some trees for fence and/or noise wall construction.  This  type of removal must be within the right-of-way limits and should not be greater than 10 feet (3 meters) in width in dense growth.  Where trees are scattered, the removal should be confined to trees that are in line with the fence and/or guardrail.

The appearance of a mechanical cutting swath should be avoided when trees are left.  This can be accomplished by having a curved or irregular tree line defining the area rather than a straight-line effect.

Scalping (201.04)

General

It is essential that the project enforce scalping work when it is required.

Scalping is not required under an embankment where the embankment height is greater than 9 feet (3 m) to the subgrade elevation and when the existing side slope is 8:1 or flatter.  Both conditions must be true for the location not to be scalped.  See Figure 201.04.1 for an illustration.

This requirement is in the specifications to ensure good friction between the existing foundation and the new embankment.  This construction technique minimizes future sliding.

Figure 201.04.1 - No Scalping Required