ITEM 448  ASPHALT CONCRETE

448.01  Description

448.02  JMF Field Adjustments

448.03  Density

448.04  Reports

448.05  Acceptance

448.06  Basis of Payment

 

448.01  Description.  This work consists of constructing a surface course or an intermediate course of aggregate and asphalt binder mixed in a central plant and spread and compacted on a prepared surface.  The Department will determine acceptance of the mixture by Lot, based on the composition of random samples taken and tested by the Contractor and verified by the Department.

The requirements of Item 441 apply, except as modified by this specification.

448.02  JMF Field Adjustments.  Determine the need for any JMF gradation adjustments, provided for in 441.05, from the results of quality control and Department verification tests of the first two acceptance lots.  Following adjustment, the Department will apply the adjusted JMF, for acceptance purposes, to the entire production including the first two lots.  Give the DET written notice of JMF adjustments no later than the end of the first workday following the notification of verification test results of the second acceptance lot.

For projects with less than two acceptance lots or for any JMF that will no longer be used on a project, give the DET written notice of any JMF gradation adjustments within 1 workday following the notification of acceptance test results.

448.03 Density.  Conduct density gauge quality control testing on the asphalt mat according to Supplement 1055 (S 1055).  Conduct density gauge testing on uniform courses of 1.0 in (25mm) or more plan thickness.  Conduct density gauge testing on projects of two adjacent lanes or more and with at least one continuous mile (1.6 kilometers) of paving (excepting bridges, intersections etc.).

When Supplement 1055 density gauge testing is required, the requirements of 401.16, except the last four paragraphs, are waived.  The requirements of 401.13 do not apply.  However, rollers must fully and satisfactorily provide the required compaction, be mechanically sound, and meet Hot Mix Asphalt industry standards.  The Department retains the right to reject the use of rollers which are not in good repair, or are not designed to do the work required.  A three-wheel roller per 401.17 is not required.

448.04  Reports.  Refer to Item 403 for reporting requirements of asphalt mixtures tested at the asphalt plant.  Report density gauge QC testing results according to S 1055.

448.05 Acceptance. Refer to Item 403 for acceptance requirements.  If a project includes 448.03 Density, acceptance will include any density deductions according to S 1055.04.

448.06 Basis of Payment.  The Department will pay for accepted quantities, completed in place, at the contract prices, or at the contract price as modified in 448.05, as follows:

Item           Unit                            Description

448             Cubic Yard                  Asphalt Concrete
                       (Cubic Meter)              Intermediate Course, Type ___

 

448             Cubic Yard                  Asphalt Concrete Surface
                       (Cubic Meter)              Course, Type ___