Sign In
An Official Site ofOhio.gov

ReferenceFiles: Superseded RID Files

  
  
  
  
AE-03_Renderings_20221109.pdf
  
12/15/2022 4:07 PMBrown, Sarah
AE-04_Draft Aesthetic Design Checklist_PID 116649_20221227.pdf
  
1/13/2023 8:01 AMBrown, Sarah
DR-06_Willow Run Storm Water Separation Study_202203.pdf
  
12/15/2022 4:07 PMBrown, Sarah
EN-15_Regulated Materials Summary and Commitments_20221020.pdf
  
12/15/2022 4:14 PMBrown, Sarah
EN-28_BSB Environmental Commitments_20230108.pdf
  
1/27/2023 7:43 AMBrown, Sarah
EN-28_BSB Environmental Commitments_20230127.pdf
  
2/3/2023 10:07 AMBrown, Sarah
EN-28_BSB Environmental Commitments_20230201.pdf
  
2/17/2023 11:14 AMBrown, Sarah
GN-05_Video Monitoring Specifications_20221228.pdf
  
1/27/2023 7:46 AMBrown, Sarah
LD-04_BSB_SmartPDF_20220729.pdf
  
1/13/2023 9:42 AMBrown, Sarah
LD-07_Concept I-W Corridor Exhibit_20221110.pdf
  
1/13/2023 9:43 AMBrown, Sarah
LD-07_Concept I-W Corridor Exhibit_20230104.pdf
  
1/27/2023 7:47 AMBrown, Sarah
LD-08_Concept I-W Multimodal Exhibit_20221109.pdf
  
1/13/2023 9:43 AMBrown, Sarah
LD-08_Concept I-W Multimodal Exhibit_20221206.pdf
  
1/27/2023 7:47 AMBrown, Sarah
PC-01_Project Permitting Requirements_v2.xlsx
  
1/27/2023 7:53 AMBrown, Sarah
RR-01_BSB_RailroadCoordinationSummary_20221209.pdf
  
4/10/2023 1:10 PMBrown, Sarah
RW-02_ODOT Final Right-of-Way Tracings_20140509.pdf
  
2/17/2023 11:41 AMBrown, Sarah
RW-02_ODOT Final Right-of-Way Tracings_20230217.pdf
  
4/10/2023 1:10 PMBrown, Sarah
RW-06_RightofWay Availability Table_20230116.pdf
  
2/3/2023 10:07 AMBrown, Sarah
RW-06_RightofWay Availability Table_20230203.pdf
  
3/28/2023 1:06 PMBrown, Sarah
RW-06_RightofWay Availability Table_20230328.pdf
  
4/10/2023 1:10 PMBrown, Sarah
UT-05_Duke Energy Allowable Utility Loading Memo_20221202.pdf
  
2/10/2023 12:25 PMBrown, Sarah
UT-07_BSB Utility Coordination Memorandum_20230112.pdf
  
2/17/2023 11:26 AMBrown, Sarah