Implementation Assessment Report Sorted By Project Type (August 2007) (Click or scroll-Down for Completed Projects Since Year 2000)
|
Active Projects: |
Project Type | State Job No | Project Title | Research Implementation Assessment | Agency | Principal Investigator | Contract Start Date | Current End Date | Current Total Project Cost (Research Only) | R&D Manager | ODOT Lead Technical Liaison | Program Office |
---|---|---|---|---|---|---|---|---|---|---|---|
Aerial | 134316 | Airborne LiDAR Reflective Linear Feature Extraction for Strip Adjustment and Horizontal Accuracy Determination | No | Ohio State University | Charles Toth | 11/1/2006 | 3/1/2008 | $98,525.52 | Monique R. Evans | John Ray | Office of Aerial Engineering |
Aerial | 134326 | Performance of GEOID03 for Height Conversion in Ohio | No | Ohio State University | Dorota Grejner-Brzezinska | 11/15/2006 | 3/15/2008 | $70,508.52 | Monique R. Evans | John Ray | Office of Aerial Engineering |
Environmental | 134253 | VAR - Statewide Noise Abatement Alternatives | No | McCormick Taylor & Associates, Inc. | Robert Kolmansberger | 1/18/2006 | 8/18/2006 | $188,340.00 | Monique R. Evans | Elvin Pinckney | Office of Environmental Services |
Environmental | TPF-5(135) | Tire/Pavement Noise Research Consortium | No | Washington Department of Transportation | Linda Pierce | 7/1/2006 | 6/30/2011 | $140,000.00 | Monique R. Evans | Adam Alexander | Office of Environmental Services |
Geotechnical | 134165 | Landslide Hazard Rating Matrix and Database | Yes | University of Akron | Robert Liang | 3/1/2004 | 12/31/2007 | $536,827.00 | Karen Pannell | Kirk Beach | Office of Geotechnical Engineering |
Geotechnical | 134169 | Bio-Engineering for Land Stabilization | Yes | The Ohio State University | Patrick J. Fox | 3/15/2004 | 6/30/2009 | $342,634.00 | Karen Pannell | Kirk Beach | Office of Geotechnical Engineering |
Geotechnical | 134254 | Development of Geotechnical Data Schema in Transportation | Yes | University of Florida | Marc Hoit | 8/10/2005 | 6/30/2008 | $644,649.00 | Karen Pannell | Kirk Beach | Office of Geotechnical Engineering |
Geotechnical | 134301 | Sonar Imaging of Flooded Subsurface Voids | No | Ohio State University | Patrick J. Fox | 7/1/2006 | 8/31/2007 | $38,294.00 | Karen Pannell | Kirk Beach | Office of Geotechnical Engineering |
Geotechnical | 134319 | Shear Strength of Clay and Silt Embankments | No | Ohio University | Teruhisa Masada | 12/1/2006 | 12/1/2008 | $347,740.00 | Karen Pannell | Steven Sommers | Office of Geotechnical Engineering |
Geotechnical | 134325 | Rock Slope Design Criteria | Yes | Kent State University | Abdul Shakoor | 1/15/2007 | 7/15/2008 | $272,191.60 | Karen Pannell | Stephen Taliaferro | Office of Geotechnical Engineering |
Geotechnical | TPF-5(076) | Development of Geotechnical Procedures/Operations Manual | Yes | Maine Department of Transportation | Mike Adams |
|
1/1/3000 | $135,000.00 | Karen Pannell | Gene Geiger | Office of Geotechnical Engineering |
Geotechnical | TPF-5(151) | Subsurface Drainage for Landslide and Slope Stabilization | No | Washington State Department of Transportation | Tom Badger | 3/1/2007 | 12/1/2010 | $310,000.00 | Karen Pannell | Gene Geiger | Office of Geotechnical Engineering |
Hydraulics | 134141 | Operation & Maintenance of a Statewide Crest-Stage Stream Gauging Network in Ohio | Yes | Ohio Department of Natural Resources | Bernard N. Sroka | 8/7/2003 | 8/7/2021 | $1,106,056.00 | Omar Abu-Hajar | Bill Krouse | Office of Structural Engineering |
Maintenance | 134266 | Enhancement of Winter Maintenance Material Ordering and Inventory | Yes | Wright State University | Frank Ciarallo | 9/7/2005 | 3/31/2008 | $123,693.00 | Omar Abu-Hajar | Diana Clonch | Office of Maintenance Administration |
Maintenance | SPR-3(042) | Aurora Program | Yes | Iowa Department of Transportation | Sandra Q. Larson | 10/1/2003 | 1/1/3000 | $2,397,500.00 | Omar Abu-Hajar | Diana Clonch | Office of Maintenance Administration |
Maintenance | TPF-5(092) | Clear Roads - Test and Evaluation of Materials, Equipment and Methods for Winter Highway Maintenance | Yes | Wisconsin Department of Transportation | Thomas Martinelli | 6/26/2005 | 1/1/3000 | $580,000.00 | Omar Abu-Hajar | Diana Clonch | Office of Maintenance Administration |
Materials | 134219 | Continuing Investigation of Polishing and Friction Characteristics of Limestone Aggregates in Ohio | Yes | University of Akron | Robert Liang | 2/1/2005 | 8/1/2007 | $297,022.50 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 134221 | Refine AASHTO T283 Resistance of Compacted Bituminous Mixture to Moisture Induced Damage for Superpave | Yes | University of Akron | Robert Liang | 2/1/2005 | 2/1/2008 | $148,036.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 134260 | A Simple Test Procedure for Evaluating Low Temperature Crack Resistance of Asphalt Concrete | Yes | Ohio University | Shad Sargand | 10/1/2005 | 10/1/2007 | $101,795.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 134302 | Automated Laboratory Testing Methods for Specific Gravity & Absorption: Verified to Match the Current Test Methods | Yes | Infrastructure Management and Engineering | Arudi Rajagopal | 7/1/2006 | 1/1/2009 | $195,651.80 | Karen Pannell | Lloyd Welker | Office of Materials Management |
Materials | 134312 | Performance of Warm Mix Asphalt (WMA) Pavements | Yes | Ohio University | Shad Sargand | 8/28/2006 | 8/28/2008 | $252,441.41 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 134317 | Verification of the Use of a Carbon Blocking Agent for Fly Ash in Concrete | No | University of Cincinnati | Richard Miller | 11/1/2006 | 11/1/2007 | $10,000.00 | Karen Pannell | Bryan Struble | Office of Materials Management |
Materials | 134330 | Phase 2 - A Comparison of Optical Gradation Devices to Current Test Methods | No | Infrastructure Management and Engineering, Inc. | Arudi Rajagopal | 1/17/2007 | 11/30/2007 | $35,615.34 | Karen Pannell | Jeff Wigdahl | Office of Materials Management |
Materials | TPF-5(100) | Deicer Scaling Resistance of Concrete Pavements, Bridge Decks, and Other Structures Containing Slag Cement | Yes | Iowa Department of Transportation | James Berger | 3/1/2005 | 12/31/2007 | $225,000.00 | Karen Pannell | Bryan Struble | Office of Materials Management |
Materials | TPF-5(129) | Recycled Unbound Pavement Materials | No | Minnesota Department of Transportation | Nancy Whiting |
|
|
$390,000.00 | Karen Pannell | Lloyd Welker | Office of Materials Management |
Pavement | 134148 | Pavement Forecasting Models | Yes | University of Toledo | Eddie Y. Chou | 11/1/2003 | 12/31/2007 | $308,081.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134170 | Long Term Monitoring of Moisture Under Pavements | Yes | The Ohio State University | William Wolfe | 5/1/2004 | 10/31/2007 | $220,236.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134226 | Review of ODOT's Overlay Design Procedure | Yes | Applied Research Associates, Inc. | Mike Darter | 7/1/2005 | 6/30/2007 | $112,879.64 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134256 | An Exploratory Study on Functionally Graded Materials with Applications to Multilayered Pavement Design | Yes | University of Akron | Ernian Pan | 8/15/2005 | 8/15/2007 | $134,037.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134261 | Improved Models for User Costs Analysis | Yes | University of Cincinnati | O. Sam Salem | 9/15/2005 | 6/15/2007 | $77,620.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134280 | Forensic Investigation of AC and PCC Pavements with Extended Service Life | Yes | Ohio University | Bill Edwards | 1/15/2006 | 5/15/2008 | $372,825.87 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134287 | Monitoring and Modeling of Pavement Response and Performance | Yes | Ohio University | Shad Sargand | 5/1/2006 | 5/1/2011 | $1,379,372.06 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134299 | Effectiveness of Chip Sealing and Microsurfacing on Pavement Serviceability and Life | No | Infrastructure Management and Engineering | Arudi Rajagopal | 7/1/2006 | 1/1/2009 | $163,798.61 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134300 | Guidelines for Implementing NCHRP 1-37A M/E Design Procedures in Ohio | No | Applied Research Associates, Inc. | Michael Darter | 7/1/2006 | 6/30/2008 | $192,549.86 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134323 | Relationship Between Skid Resistance Numbers Measured With Ribbed and Smooth Tire and Wet Accident Locations | No | Applied Pavement Technology, Inc. | Roger Larson | 1/1/2007 | 8/1/2008 | $109,999.00 | Karen Pannell | Andrew Williams | Office of Pavement Engineering |
Pavement | 134345 | Evaluation of Rubblization Projects in Ohio | No | Infrastructure Management and Engineering | Arudi Rajagopal | 7/19/2007 |
|
$179,393.66 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14770 | Truck/Pavement/Economic Modeling & In-Situ Field Data Analysis Application | Yes | Ohio University | Shad Sargand | 2/9/2001 | 8/9/2007 | $682,775.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14795 | Effectiveness of Thin Hot Mix Overlay on Pavement Ride and Condition Performance | Yes | University of Toledo | Eddie Y. Chou | 2/1/2002 | 12/31/2007 | $385,331.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14815 | Instrumentation of the WAY-30 Test Pavements | Yes | Ohio University | Shad Sargand | 2/1/2003 | 2/1/2007 | $479,797.94 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 437046 | Determination of Mechanical Properties of Materials used in the WAY-30 Test Pavements | Yes | Ohio University | Sang-Soo Kim | 1/1/2004 | 1/1/2008 | $106,882.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | TPF-5(010) | Structural Improvement of Flexible Pavements Using Geosynthetic for Base Course Reinforcement | Yes | Maine Department of Transportation | Dale H. Peabody | 10/1/2004 | 9/1/2006 | $595,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | TPF-5(063) | Improving the Quality of Pavement Profiler Measurement | Yes | FHWA | Robert Orthmeyer | 5/1/2003 | 9/30/2009 | $1,333,000.00 | Karen Pannell | Brian Schleppi | Office of Pavement Engineering |
Pavement | TPF-5(070) | Second International Conference on Accelerated Pavement Testing | Yes | Minnesota Department of Transportation | James Klessig |
|
2/1/2009 | $50,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | TPF-5(101) | Evaluation of Applications of Mechanistic Prediction Modeling Tools | Yes | New York Department of Transportation | Imad Basheer |
|
|
$580,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | TPF-5(112) | Midwest States Pooled Fund Pavement Preservation Partnership | Yes | Michigan Department of Transportation | Kevin Kennedy | 1/1/2006 | 8/24/2008 | $220,000.00 | Karen Pannell | David Humphrey | Office of Pavement Engineering |
Pavement | TPF-5(127) | Consortium of Accelerated Pavement Testing (CAPT) and Technical Exchange Partnership | No | FHWA | Nelson Gibson | 6/28/2005 | 6/28/2008 | $200,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | TPF-5(153) | Optimal Timing of Preventive Maintenance for Addressing Environmental Aging in HMA Pavements | No | Minnesota Department of Transportation | Thomas Wood |
|
|
$375,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Planning | SPR-3(049) | Urban Mobility Study | Yes | Texas Department of Transportation | Gabriel Contreras | 5/1/2003 | 5/1/2010 | $600,000.00 | Monique R. Evans | Leonard Evans | Office of Systems Analysis Planning and Program Management |
Planning | TPF-5(004) | Long Term Pavement Performance (LTPP) Specific Pavements Study (SPS) Traffic Data Collection | Yes | FHWA | Deborah Walker | 8/7/2003 | 8/7/2008 | $3,462,405.00 | Monique R. Evans | Tony Manch | Office of Technical Services |
Planning | TPF-5(036) | Transportation Asset Management Research Program | Yes | Wisconsin Department of Transportation | Nina McLawhorn | 7/1/2006 | 7/1/2008 | $1,557,800.00 | Monique R. Evans | Leonard Evans | Office of Systems Analysis Planning and Program Management |
Planning | TPF-5(108) | Software Tools for Sharing and Integrating GIS Data | Yes | Washington Department of Transportation | Tami Griffin | 6/27/2005 | 6/27/2009 | $310,000.00 | Monique R. Evans | Dave Blackstone | Office of Technical Services |
Planning | TPF-5(156) | Mississippi Valley Freight Coalition | No | Wisconsin Department of Transportation | Nina McLawhorn | 9/1/2006 | 1/1/2020 | $325,000.00 | Monique R. Evans | Don Fisher | Office of Systems Planning and Program Management |
Safety | 134166 | Crash Base Rates for Intersections in Ohio | Yes | University of Cincinnati | Prahlad Pant | 3/1/2004 | 9/30/2006 | $169,551.00 | Monique R. Evans | Jennifer Townley | Office of Systems Planning & Program Management |
Safety | 134230 | Crash Base Rates for Freeways/Reduction Strategies for Rear End Crashes | Yes | PDP Associates, Inc. | Prahlad Pant | 7/1/2005 | 1/1/2008 | $229,933.40 | Monique R. Evans | Don Fisher | Office of Systems Planning and Program Management |
Safety | SPR-2(210) | Safety Analyst | Yes | FHWA | Ray Krammes | 4/1/2001 | 4/1/2006 | $1,159,997.00 | Monique R. Evans | Jennifer Townley | Office of Systems Planning & Program Management |
Safety | SPR-3(017) | Mid-West States Crash Testing Program | Yes | Nebraska Department of Roads | Amy Starr | 7/1/1997 | 6/30/2009 | $6,797,234.00 | Monique R. Evans | Dean Focke | Office of Roadway Engineering |
Safety | TPF-5(120) | Deer Vehicle Crash Information and Research (DVCIR) Center | Yes | FHWA | Mary Gray | 1/30/2007 | 1/1/3000 | $260,000.00 | Monique R. Evans | Tom Ramsay | Office of Systems Planning and Program Management |
Structures | 134142 | An Over-Height Collision Protection System of Sandwich Polymer Composites Integrated with Remote Monitoring for Concrete Bridges | Yes | University of Akron | Pizhong (Chiao) Qiao | 10/1/2003 | 12/31/2007 | $220,000.00 | Omar Abu-Hajar | Omar Abu-Hajar | Office of Research and Development |
Structures | 134225 | Verification of ODOT's Load Rating Analysis Programs for Metal Pipe and Arch Culverts | Yes | Ohio State University | Halil Sezen | 4/1/2005 | 10/1/2007 | $273,356.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 134238 | Field Instrumentation, Monitoring of Drilled Shafts for Landslide Stabilization and Development of Pertinent Design Methods | Yes | University of Akron | Robert Liang | 5/2/2005 | 11/3/2008 | $509,179.00 | Omar Abu-Hajar | Chris Merklin | Office of Geotechnical Engineering |
Structures | 134258 | Development of Degradation Rates for Various Ohio Bridge Types | Yes | University of Cincinnati | Arthur Helmicki | 9/15/2005 | 9/15/2008 | $135,980.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 134267 | Forces on Wingwalls from Thermal Expansion of Skewed Semi-Integral Bridges | Yes | Ohio University | Eric Steinberg | 10/1/2005 | 10/1/2008 | $274,272.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 134329 | Structural Health Monitoring of HAN-30-0295 Highway Bridge | Yes | Ohio Northern University | Farhad Reza | 2/1/2007 | 2/1/2008 | $10,000.00 | Omar Abu-Hajar | Steve Reichenbach | District 01 |
Structures | 14797 | Long Term Monitoring of a Pipe Under Deep Cover | Yes | Ohio University | Shad Sargand | 2/18/2002 | 8/18/2006 | $94,661.77 | Omar Abu-Hajar | Ben Goldsberry | Office of Structural Engineering |
Structures | 14805 | Instrumentation of the US Grant Bridge for Monitoring of Fabrication, Erection, In-Service Behavior, and to Support Management, Maintenance, and Inspection | Yes | University of Cincinnati | Arthur Helmicki | 6/1/2002 | 1/1/2008 | $574,100.00 | Omar Abu-Hajar | Greg Baird | District 09 |
Structures | 14811 | Evaluation of the Effectiveness of Strategic Initiative 9 Pilot Bridge Concepts | Yes | University of Cincinnati | Richard Miller | 10/13/2002 | 10/12/2007 | $231,096.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 426354 | Instrumentation of the Maumee River Crossing | Yes | University of Cincinnati | Arthur Helmicki | 12/15/2003 | 8/15/2009 | $357,237.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | TPF-5(059) | State-of-the-Art Surveillance and Security Technologies | Yes | FHWA | Sheila Duwadi | 3/1/2003 | 12/31/2004 | $80,000.00 | Omar Abu-Hajar | Mike Loeffler | Office of Structural Engineering |
Structures | TPF-5(068) | Long-Term Maintenance of Load and Resistance Factor Design Specifications | Yes | Iowa Department of Transportation | Sandra Q. Larson | 7/15/2002 | 1/1/2010 | $1,940,000.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | TPF-5(088) | NDE/NDT for Highways and Bridges | Yes | New York Department of Transportation | Frank Jalinoos |
|
|
$75,000.00 | Karen Pannell | John Randall (not current) | Office of Structural Engineering |
Structures | TPF-5(106) | Guidelines for Designing Bridge Piers and Abutments for Vehicle Collisions | No | Texas Department of Transportation | Charmaine Richardson | 3/26/2007 | 3/31/2009 | $430,000.00 | Omar Abu-Hajar | Sean Meddles | Office of Structural Engineering |
Technology Transfer | TPF-5(105) | Transportation Library Connectivity | Yes | Wisconsin Department of Transportation | Ann Pahnke | 5/2/2006 | 5/2/2009 | $500,000.00 | Monique R. Evans | Janet Bix | Library |
Traffic | 134218 | Smart Sign Enhancement - Phase 2 | Yes | University of Akron | Ping Yi | 2/1/2005 | 9/1/2007 | $66,615.63 | Monique R. Evans | Paul Trapasso | Office of Traffic Engineering |
Traffic | 134257 | Innovative Method for Calculation of Freeway Travel Time Using Limited Data | Yes | University of Akron | Ping Yi | 10/1/2005 | 9/1/2007 | $32,892.00 | Monique R. Evans | George Saylor | Office of Traffic Engineering |
Traffic | 134270 | Phase 2 - Improved Work Zone Design Guidelines and Enhanced Model of Travel Delays in Work Zones | Yes | Ohio University | Helmut T. Zwahlen | 9/1/2005 | 9/1/2007 | $326,089.18 | Monique R. Evans | Mack Braxton | Office of Traffic Engineering |
Traffic | 134315 | Long Term Striping Alternatives for Bridge Decks | No | University of Akron | Ala R. Abbas | 10/16/2006 | 6/16/2008 | $90,391.78 | Monique R. Evans | Tom Culp | District 03 |
Traffic | 134332 | Demonstration of Innovative Techniques for Work Zone Safety Data Analysis | No | Cleveland State University | Nancy Grugle | 5/1/2007 | 7/1/2008 | $61,316.00 | Monique R. Evans | Jennifer Gallagher | Office of Traffic Engineering |
Traffic | TPF-5(058) | NCHRP 17-18(3) Guidance for Implementation of the AASHTO Strategic Highway Safety Plan | No | FHWA | Ray Krammes | 8/1/2003 | 12/31/2005 | $775,000.00 | Monique R. Evans | Michelle May | Office of Systems Planning and Program Management |
For more project information, please contact the R&D Project Manager
Project Type | State Job No | Project Title | Research Implementation Plan | Total Implementation Percent Complete | Agency | Principal Investigator | Contract Start Date | Current End Date | Current Total Project Cost (Research Only) | R&D Manager | ODOT Lead Technical Liaison | Program Office |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Aerial | 134145 | Airborne LIDAR - A New Source of Traffic Flow Data | Yes | 100% | Ohio State University | Dorota Grejner-Brzezinska | 10/1/2003 | 6/30/2005 | $50,245.00 | Monique R. Evans | John Ray | Office of Aerial Engineering |
Aerial | 14661 | High Accuracy Dynamic Highway Mapping Using a GPS/INS System with On-The-Fly (OTF) GPS Ambiguity Resolution | Yes | 100% | Ohio State University | Dorota Grejner-Brzezinska | 10/21/1996 | 10/12/2002 | $421,202.00 | Monique R. Evans | Jeff Waggamon | District 01 |
Aerial | 14781 | High-Accuracy Direct Aerial Platform Orientation with Tightly Coupled GPS/INC System | Yes | 100% | Ohio State University | Dorota Grejner-Brzezinska | 3/5/2001 | 11/1/2004 | $279,082.00 | Monique R. Evans | John Ray | Office of Aerial Engineering |
Aerial | 14799 | Geo-Referenced Digital Data Acquisition and Processing System Using LIDAR Technology | No |
|
Ohio State University | Dorota Grejner-Brzezinska | 5/1/2002 | 6/30/2005 | $1,685,769.00 | Monique R. Evans | John Ray | Office of Aerial Engineering |
Construction | 14649 | Construction of Flexible Pipe System Using Controlled Low Strength Material - Controlled Density Fill (CLSM-CDF) | No |
|
Ohio University | Shad Sargand | 6/17/1996 | 10/31/2001 | $145,882.00 | Monique R. Evans | Ron Trivisonno | Office of Construction Administration |
Construction | 14780 | The Evaluation of Warranty Provisions on ODOT Construction Projects | Yes | 100% | University of Cincinnati | Issam Minkarah | 11/20/2000 | 12/31/2003 | $186,402.00 | Monique R. Evans | Dan Groh | Office of Construction Administration |
Environmental | 134174 | Effectiveness of Tire/Road Noise Abatement Through Surface Retexturing by Diamond Grinding for Project SUM-76-15.40 | No |
|
Ohio University | Lloyd Herman | 6/7/2004 | 7/30/2005 | $56,422.00 | Karen Pannell | Elvin Pinckney | Office of Environmental Services |
Environmental | 14437 | Effects of Highway Deicing Chemicals on Shallow Unconsolidated Aquifers in Ohio (Proposal designed for 10 year project) | No |
|
USGS | Allison E. Kunze | 1/1/1988 | 9/30/1999 | $4,238,535.00 | Monique R. Evans | Tim Hill | Office of Environmental Services |
Environmental | 14677 | Effects of Pavement Type on Traffic Noise Level | No |
|
Ohio University | Lloyd Herman | 5/5/1997 | 5/5/1999 | $151,996.00 | Monique R. Evans | Elvin Pinckney | Office of Environmental Services |
Environmental | 14687 | Parallel Barrier Effect for Distant Receivers | Yes | 100% | Ohio University | Lloyd Herman | 12/1/1997 | 9/1/2002 | $274,096.00 | Monique R. Evans | Elvin Pinckney | Office of Environmental Services |
Environmental | 14775 | Best Management Practices of Archaeological Study Methods | Yes | 100% | University of Cincinnati | Anastasios Ioannides | 4/2/2001 | 4/2/2003 | $100,000.00 | Monique R. Evans | Paul Graham | Office of Environmental Services |
Environmental | 14776 | Archaeological Study Methodology and Results | Yes | 75% | University of Cincinnati | Robert Frohn | 10/1/2001 | 12/31/2003 | $99,998.00 | Monique R. Evans | Paul Graham | Office of Environmental Services |
Environmental | 14777 | Bankful Characteristics of Ohio's Streams and Their Relation to Peak Streamflows | Yes | 100% | USGS | Greg Koltun | 7/9/2001 | 12/31/2004 | $210,410.00 | Monique R. Evans | Tom Linkous (not current) | Office of Environmental Services |
Environmental | 14778 | A Study of the Use of Low Altitude Airborne Multispectral Scanning for Preliminary Environmental Analysis of Highway Project Sites | No |
|
SenSyTech, Inc. | Jason Jester | 3/1/2001 | 9/30/2001 | $144,549.00 | Monique R. Evans | Tim Hill | Office of Environmental Services |
Geotechnical | 14672 | Reinforced-Soil Embankment on Soft Foundation | No |
|
Ohio State University | T. H. Wu | 2/24/1997 | 5/24/1998 | $31,575.00 | Karen Pannell | Gene Geiger | Office of Geotechnical Engineering |
Geotechnical | 14700 | Identifying Potential Collapse Features Under Highways | Yes | 100% | Wright State University | Paul Wolfe | 5/1/1998 | 12/31/2002 | $137,144.00 | Karen Pannell | Rick Ruegsegger | Office of Geotechnical Engineering |
Geotechnical | 14709 | Use of Electrical Resistivity to Detect Underground Mine Voids in Ohio | Yes | 100% | USGS | Rodney Sheets | 8/1/1998 | 4/30/2002 | $57,500.00 | Karen Pannell | Rick Ruegsegger | Office of Geotechnical Engineering |
Geotechnical | 14720 | Implementation of Slope Stability Research: Geologic Profiles Along I-70 and I-77 | No |
|
Ohio State University | T. H. Wu | 9/15/1999 | 7/15/2001 | $12,034.00 | Omar Abu-Hajar | Gene Geiger | Office of Geotechnical Engineering |
Geotechnical | 14782 | Development of a Rockfall Hazard Rating Matrix & Data Management System for Ohio | Yes | 100% | Kent State University | Abdul Shakoor | 3/5/2001 | 6/1/2005 | $162,391.00 | Karen Pannell | Kirk Beach | Office of Geotechnical Engineering |
Geotechnical | 14798 | Inclinometer - Time-Domain Reflectometry Comparative Study | Yes | 100% | Ohio University | Shad Sargand | 2/18/2002 | 6/18/2004 | $80,732.00 | Karen Pannell | Alexander Dettloff | Office of Geotechnical Engineering |
Geotechnical | 45041 | Study of IR-70 Surface Depressions in Guernsey County, Ohio - Phase I & Phase II - GUE-70-14.10 Mine Research | Yes | 100% | BBC&M Engineering Inc. | Timothy Van Echo | 8/15/1999 | 6/30/2003 | $1,446,975.00 | Karen Pannell | Rick Ruegsegger | Office of Geotechnical Engineering |
Hydraulics | 134265 | A Streamflow Statistics (StreamStats) Web Application for Ohio | No |
|
USGS | Greg Koltun | 9/1/2005 | 12/31/2006 | $120,000.00 | Omar Abu-Hajar | David Riley | Office of Structural Engineering |
Hydraulics | 14636 | Using Wetlands for Storm Water Management | Yes | 100% | Ohio University | Gayle Mitchell | 11/1/1995 | 11/1/2000 | $101,882.00 | Omar Abu-Hajar | Bill Krouse | Office of Structural Engineering |
Hydraulics | 14684 | Bench Scale Development & Field Testing of a Partial Exfiltration Trench (PET) for Controlling Highway Runoff Quality | Yes | 100% | University of Cincinnati | John Sansalone | 10/20/1997 | 9/30/2001 | $246,572.00 | Omar Abu-Hajar | Bill Krouse | Office of Structural Engineering |
Hydraulics | 14740 | Techniques for Estimating Flood-Peak Discharges of Rural Unregulated Streams in Ohio | Yes | 100% | USGS | Greg Koltun | 5/28/2000 | 5/30/2003 | $132,088.00 | Omar Abu-Hajar | Bill Krouse | Office of Structural Engineering |
Hydraulics | 14743 | Techniques for Estimating Selected Flow Characteristics of Rural, Unregulated Ohio Streams | Yes | 100% | USGS | Greg Koltun | 4/1/2000 | 9/30/2001 | $16,700.00 | Omar Abu-Hajar | Bill Krouse | Office of Structural Engineering |
Hydraulics | 14753 | Qualifying the Effects of Highway Construction on the Peak Rate & Volume of Storm Water Runoff in Rural & Moderately Urbanized Watersheds | Yes | 100% | Water Resources and Coastal Engineering, Inc. | Shirly Schluchter | 6/6/2000 | 7/31/2003 | $120,850.00 | Omar Abu-Hajar | Bill Krouse | Office of Structural Engineering |
Hydraulics | 14813 | Risk Assessment & Update of Inspection Procedures for Culverts | Yes | 100% | Ohio University | Gayle Mitchell | 12/15/2002 | 5/31/2005 | $343,129.00 | Omar Abu-Hajar | Mike Loeffler | Office of Structural Engineering |
Maintenance | 134216 | Effectiveness of RWIS Bridge Temperature Simulators | No |
|
Ohio University | Helmut T. Zwahlen | 12/15/2004 | 6/30/2007 | $239,429.69 | Omar Abu-Hajar | Diana Clonch | Office of Maintenance Administration |
Maintenance | 14758 | Evaluation of ODOT Roadway/Weather Sensor Systems for Snow & Ice Removal Operations | No |
|
Ohio University | Helmut T. Zwahlen | 9/7/2000 | 11/15/2006 | $1,130,235.20 | Monique R. Evans | Diana Clonch | Office of Maintenance Administration |
Materials | 134187 | A Comparative Evaluation of Corelok Device in Determining Reliable Bulk Gravity and Maximum Gravity Test Results | No |
|
University of Cincinnati | Arudi Rajagopal | 9/1/2004 | 6/30/2006 | $26,700.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 134227 | Evaluation of High Absorptive Materials to Improve Internal Curing of Low Permeability Concrete | No |
|
Cleveland State University | Norbert Delatte | 4/1/2005 | 5/1/2007 | $98,703.79 | Karen Pannell | Bryan Struble | Office of Materials Management |
Materials | 134255 | Phase 1: Proof of Concept Validation of Methodology to Examine the Responsible Use of Recycle in Corrugated Polyethylene (PE) Drainage Pipe | No |
|
Jana Laboratories, Inc. | Ken Oliphant | 8/1/2005 | 12/19/2006 | $35,000.00 | Karen Pannell | Lloyd Welker | Office of Materials Management |
Materials | 134264 | A Comparison of Optical Gradation Analysis Devices to Current Test Methods | No |
|
Infrastructure Management and Engineering, Inc. | Arudi Rajagopal | 9/1/2005 | 9/1/2006 | $65,375.84 | Karen Pannell | Jeff Wigdahl | Office of Materials Management |
Materials | 14559 | Evaluation of Portland Cement Concretes Containing Ground Granulated Blast Furnace Slag | Yes | 100% | University of Akron | Allen Shen | 8/16/1993 | 2/16/1999 | $364,450.00 | Karen Pannell | Lloyd Welker | Office of Materials Management |
Materials | 14701 | Durability & Performance Characteristics of Hot Mix Asphalt Containing Polymer Additives - Phase I: Laboratory Study | Yes | 100% | University of Akron | Robert Liang | 5/18/1998 | 12/18/2001 | $212,071.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14702 | Pavement Performance Testing | Yes | 100% | Ohio University | Shad Sargand | 5/18/1998 | 3/8/2002 | $224,916.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14703 | Evaluation of Ohio Superpave Projects | No |
|
Ohio State University | Osama Abdulshafi (not current) | 5/18/1998 | 5/18/2000 | $36,116.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14734 | Determination of Recycled Asphalt Pavement Content in Asphalt Mixes Based on Expected Mixture Durability | Yes | 100% | Ohio State University | Osama Abdulshafi (not current) | 3/17/2000 | 3/17/2003 | $166,979.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14751 | Mechanistic Evaluation of the Georgia Loaded Wheel Tester for Superpave Asphalt Mixtures | Yes | 100% | University of Akron | Robert Liang | 6/12/2000 | 4/12/2004 | $259,397.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14793 | Blending Proportions of High Skid and Low Skid Aggregate | Yes | 100% | University of Akron | Robert Liang | 2/1/2002 | 7/1/2003 | $97,408.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14796 | A Working Review of Available Non-Nuclear Equipment for Determining In-Place Density of Asphalt Pavement | Yes | 100% | Ohio University | Shad Sargand | 2/18/2002 | 8/19/2004 | $74,795.00 | Karen Pannell | David Powers | Office of Materials Management |
Materials | 14800 | Fineness of Densified Micro Silica and Dispersion in Concrete Mixes | No |
|
University of Cincinnati | Anastasios Ioannides | 4/1/2002 | 9/1/2006 | $40,000.00 | Karen Pannell | Bryan Struble | Office of Materials Management |
Materials | 14802 | Comparison and Definition of State DOT's Practices in Selection of Materials for Pavements | Yes | 100% | Infrastructure Management and Engineering, Inc. | Arudi Rajagopal | 4/1/2002 | 9/30/2004 | $60,554.05 | Karen Pannell | Lloyd Welker | Office of Materials Management |
Materials | 14803 | Larger Sized Coarse Aggregate in Portland Cement Concrete Pavement and Structures | No |
|
University of Cincinnati | Anastasios Ioannides | 5/1/2002 | 9/1/2006 | $150,000.00 | Karen Pannell | Bryan Struble | Office of Materials Management |
Pavement | 134184 | Development of a Composite Pavement Performance Index | Yes | 50% | Ohio Northern University | Farhad Reza | 9/1/2004 | 11/1/2005 | $10,085.69 | Karen Pannell | Andrew Williams | Office of Pavement Engineering |
Pavement | 134185 | Cone Penetrometer Equipped with Piezoelectric Sensors for Measurement of Soil Stiffness in Highway Pavement | Yes | 100% | Case Western Reserve University | David (Xiangwu) Zeng | 9/1/2004 | 12/1/2005 | $10,000.00 | Karen Pannell | Chris Merklin | Office of Geotechnical Engineering |
Pavement | 134186 | Developing Pavement Performance Predicting Models and Decision Trees for the City of Cincinnati | No |
|
University of Cincinnati | Arudi Rajagopal | 9/1/2004 | 6/30/2006 | $35,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134196 | Investigation of Pavement Cracking on SR-4 and Demonstration of Multi-Head Breaker in Fracturing Reinforced PCC Pavement Before AC Overlay | No |
|
Infrastructure Management and Engineering, Inc. | Arudi Rajagopal | 8/15/2004 | 6/30/2006 | $80,883.36 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 134239 | Petrographic Examination of Concrete Cores Taken From Pavement Slabs on the ODOT DEL-23 Test Road Project and the ODOT HAM-75-14.41 | No |
|
Lankard Materials Laboratory, Inc. | David Lankard | 5/11/2005 | 5/11/2006 | $18,950.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14512 | Permeability & Stability of Base & Subbase Materials | Yes | 100% | University of Toledo | Brian Randolph | 3/2/1992 | 2/16/1999 | $364,450.00 | Karen Pannell | Aric Morse | Office of Pavement Engineering |
Pavement | 14583 | Load Response Instrumentation of SHRP Pavements | Yes | 100% | University of Cincinnati | Andrew Bodocsi | 6/13/1994 | 6/30/2001 | $299,388.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14589 | Monitoring and Analysis of Data Obtained from Moisture-Temperature Recording Stations | Yes | 15% | Case Western Reserve University | Ludwig Figueroa | 8/1/1994 | 6/30/1997 | $53,720.00 | Karen Pannell | Aric Morse | Office of Pavement Engineering |
Pavement | 14598 | Implementation of a System for Controlling the Lateral Position of a Moving Vehicle - Phase II | Yes | 100% | AMT Systems Engineering, Inc. | Dennis Pugh | 8/29/1994 | 5/29/1996 | $68,495.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14640 | Field Testing of the ODOT Sensor-Assisted Steering System | Yes | 100% | AMT Systems Engineering, Inc. | Dennis Pugh | 3/22/1996 | 8/23/2002 | $43,729.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14652 | Continued Monitoring of Instrumented Pavement in Ohio | Yes | 100% | Ohio University | Shad Sargand | 9/3/1996 | 8/31/2002 | $1,350,545.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14654 | Three-Dimensional Modeling of Flexible Pavement | Yes | 100% | Ohio University | Shad Sargand | 9/3/1996 | 9/3/1998 | $30,000.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14666 | Application of High Performance Concrete in the Pavement System | Yes | 80% | Ohio University | Shad Sargand | 11/4/1996 | 3/15/2002 | $163,476.00 | Karen Pannell | Keith Keeran | Office of Construction Administration |
Pavement | 14667 | Performance of Dowel Bars and Rigid Pavement | Yes | 50% | Ohio University | Shad Sargand | 11/4/1996 | 7/30/2001 | $261,316.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14668 | Ohio Route 50 Joint Sealant Experiment | Yes | 50% | University of Cincinnati | Anastasios Ioannides | 11/4/1996 | 7/11/2002 | $305,116.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14670 | Long Term Monitoring of Broken & Seated Pavements | Yes | 90% | University of Cincinnati | Issam Minkarah | 1/15/1997 | 10/30/2002 | $145,424.00 | Karen Pannell | Aric Morse | Office of Pavement Engineering |
Pavement | 14676 | Magnitude Assessment of Free & Hydrated Limes Present in RPCC Aggregates | Yes | 100% | University of Toledo | Jiwan Gupta | 3/31/1997 | 3/31/2002 | $169,096.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14683 | An Evaluation of the Cost Effectiveness of D-Cracking Preventive Measures | Yes | 100% | Bowling Green State University | L. Travis Chapin | 10/27/1997 | 1/27/2001 | $25,310.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14691 | Continued Monitoring of SHRP Pavement Instrumentation Including Soil Suction & Relationship with Resilient Modulus | Yes | 0% | Ohio State University | William Wolfe | 3/3/1998 | 12/31/2003 | $301,481.00 | Karen Pannell | Aric Morse | Office of Pavement Engineering |
Pavement | 14693 | Long Term Monitoring of Seasonal & Weather Stations & Analysis of Data from SHRP Pavements | Yes | 50% | Case Western Reserve University | Ludwig Figueroa | 5/3/1998 | 5/5/2004 | $384,049.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14694 | Extended Monitoring & Analysis of Moisture Temperature Data | Yes | 33% | Case Western Reserve University | Ludwig Figueroa | 5/5/1998 | 12/5/2001 | $79,448.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14695 | Laboratory Characterization of Materials & Data Management for Ohio-SHRP Projects (U.S. 23) | Yes | 95% | Ohio University | Shad Sargand | 3/30/1998 | 1/31/2002 | $126,330.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14696 | Structural Response of High Performance Concrete Pavement | Yes | 50% | Ohio University | Shad Sargand | 3/30/1998 | 3/15/2002 | $90,543.00 | Karen Pannell | Aric Morse | Office of Pavement Engineering |
Pavement | 14704 | Monitoring Seasonal Instrumentation & Modeling Climatic Effects on Pavements at the Ohio/SHRP Test Road | Yes | 50% | University of Toledo | Andrew Heydinger | 5/18/1998 | 11/1/2003 | $219,920.00 | Karen Pannell | Aric Morse | Office of Pavement Engineering |
Pavement | 14711 | Hot Weather Load Test | Yes | 100% | Ohio University | Shad Sargand | 7/1/1998 | 3/31/2002 | $74,762.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14738 | Effectiveness of Crack Sealing on Pavement Serviceability & Life | Yes | 25% | University of Cincinnati | Arudi Rajagopal | 3/1/2000 | 9/30/2003 | $230,972.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14744 | Accelerated Testing of Ohio SHRP Sections 390101, 390105, & 390107 | Yes | 25% | Ohio University | Shad Sargand | 4/28/2000 | 8/29/2004 | $187,722.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14746 | Structural Support of Lime Stabilized Subgrade used with Flexible Pavements | No |
|
University of Toledo | Eddie Y. Chou | 4/28/2000 | 12/31/2004 | $197,026.00 | Karen Pannell | Chris Merklin | Office of Geotechnical Engineering |
Pavement | 14749 | Determination of Pavement Layer Stiffness on the Ohio SHRP Test Road Using Non-Destructive Testing Techniques | Yes | 100% | Ohio University | Shad Sargand | 5/10/2000 | 5/10/2002 | $60,289.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14767 | Materials Properties for Implementation of Mechanistic-Empirical (M-E) Pavement Design Procedures | Yes | 50% | Ohio University | Teruhisa Masada | 2/21/2001 | 3/1/2004 | $142,570.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14768 | Evaluation of Pavement Performance on DEL-23 | No |
|
Ohio University | Shad Sargand | 2/9/2001 | 8/15/2006 | $1,024,143.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14783 | Evaluation of the Variation in Pavement Performance between ODOT Districts | Yes | 75% | University of Toledo | Eddie Y. Chou | 2/9/2001 | 11/1/2004 | $266,675.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14804 | Evaluation of Drainable Bases Under Asphalt Pavement | No |
|
University of Akron | Robert Liang | 4/1/2002 | 7/1/2007 | $594,353.60 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14809 | Evaluation of HPC Pavements in Nelsonville, Ohio | Yes | 25% | Ohio University | Shad Sargand | 10/1/2002 | 6/30/2004 | $86,455.00 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Pavement | 14814 | Evaluation of Guidelines for Subgrade Treatments | No |
|
University of Toledo | Eddie Y. Chou | 12/1/2002 | 3/31/2005 | $74,668.00 | Karen Pannell | Chris Merklin | Office of Geotechnical Engineering |
Pavement | 14817 | Use of Dynamic Cone Penetrometer in Subgrade and Base Acceptance | No |
|
Ohio University | Shie-Shin Wu | 2/15/2003 | 3/1/2007 | $118,487.04 | Karen Pannell | Roger Green | Office of Pavement Engineering |
Planning | 134138 | Upper Midwest Freight Corridor Study | Yes | 100% | University of Wisconsin-Madison | Teresa M. Adams | 8/19/2003 | 3/31/2005 | $360,004.00 | Monique R. Evans | Suzann Rhodes (not current) | Office of Urban and Corridor Planning |
Planning | 134152 | The Columbus Metropolitan Freeway Management System (CMFMS) Effectiveness Study: Part 2 - The After Study | Yes | 50% | Ohio State University | Benjamin A. Coifman | 2/1/2004 | 3/31/2006 | $122,625.00 | Monique R. Evans | George Saylor | Office of Traffic Engineering |
Planning | 134263 | Upper MidWest Freight Corridor Study - Phase 2 | No |
|
University of Wisconsin-Madison | Teresa M. Adams | 9/1/2005 | 4/30/2007 | $140,000.00 | Monique R. Evans | Kelly Brooker | Office of Systems Planning and Program Management |
Planning | 14681 | Development of a Dynamic Traffic Assignment Based Congestion Management System | Yes | 100% | Northwestern University | Thanasis Zillaskopoulous | 6/6/1997 | 6/30/2001 | $26,074.00 | Monique R. Evans | Mark Byram | Office of Technical Services |
Planning | 14710 | Off-Road Axle Detection Sensor (ORADS) | Yes | 100% | Spectra Research, Inc. | Paul Zidek | 8/11/1998 | 2/11/2001 | $377,157.00 | Monique R. Evans | Tony Manch | Office of Technical Services |
Planning | 14724 | Impact of By-Passes to Ohio Communities Under 35,000 Population | Yes | 100% | John E. Kleymeyer & Associates | John Kleymeyer | 12/20/1999 | 7/20/2001 | $69,302.00 | Monique R. Evans | Suzann Rhodes (not current) | Office of Urban and Corridor Planning |
Planning | 14761 | Best ITS Management Practices & Technologies for Ohio | Yes | 100% | KHA of Ohio - Kimley-Horn & Associates | Amy Massey | 10/17/2000 | 7/30/2001 | $99,972.00 | Monique R. Evans | Howard Wood | Division of Planning |
Planning | 14766 | Freight Impacts on Ohio's Roadway System | Yes | 75% | Cambridge Systematics, Inc. | Mark Cutler | 12/5/2000 | 7/1/2002 | $352,485.00 | Monique R. Evans | Mark Locker | Office of Environmental Services |
Planning | 14806 | Communication Strategies for State Transportation Research Programs | No |
|
Ohio University | Diana Knott | 8/1/2002 | 8/1/2005 | $35,024.55 | Monique R. Evans | Monique R. Evans | Office of Research & Development |
Planning | 14810 | Validation of ODOT Sufficiency Rating System | No |
|
University of Cincinnati | Prahlad Pant | 10/13/2002 | 6/30/2005 | $76,572.00 | Monique R. Evans | Leonard Evans | Office of Systems Analysis Planning and Program Management |
Policy Development | 134167 | Freight Mobility, Access and Safety Strategies | Yes | 100% | Cambridge Systematics, Inc. | Gary Maring | 3/1/2004 | 5/31/2006 | $195,219.16 | Monique R. Evans | Don Fisher | Office of Systems Planning and Program Management |
Roadway | 134162 | Development of an NCHRP Report 350 TL-3 New Jersey Shape 50-inch Portable Concrete Barrier | No |
|
Battelle Memorial Institute | James C. Kennedy | 7/1/2004 | 7/1/2006 | $137,412.00 | Monique R. Evans | Dean Focke | Office of Roadway Engineering |
Safety | 134161 | Evaluation and Design of ODOT’s Type 5 Guardrail with Tubular Backup | Yes | 100% | Battelle Memorial Institute | James C. Kennedy | 3/1/2004 | 3/1/2006 | $205,891.00 | Monique R. Evans | Dean Focke | Office of Roadway Engineering |
Safety | 134220 | Crash Reduction Factors for Education and Enforcement Strategies in Ohio | No |
|
Ohio University | Helmut T. Zwahlen | 2/1/2005 | 6/30/2007 | $72,485.26 | Monique R. Evans | Jonathan Hughes | Office of Systems Planning and Program Management |
Safety | 14706 | Development of an Accident Visual Analysis & Data Integration Tool | Yes | 100% | University of Akron | Ping Yi | 5/18/1998 | 2/18/2001 | $71,662.00 | Monique R. Evans | Jonathan Hughes | Office of Systems Planning and Program Management |
Safety | 14733 | Identification of Pavement Marking Colors | No |
|
Wright State University | Allen Nagy | 3/27/2000 | 12/1/2001 | $9,997.00 | Monique R. Evans | Mohammad Khan (not current) | Office of Traffic Engineering |
Safety | 14752 | Rational Schedule of Base Accident Rates for Rural Highways in Ohio - Phase II | No |
|
University of Cincinnati | Prahlad Pant | 6/12/2000 | 12/31/2002 | $195,393.00 | Monique R. Evans | Jennifer Townley | Office of Systems Planning & Program Management |
Safety | 14801 | Development of Crash Reduction Factors | Yes | 100% | University of Dayton | Peter Hovey | 5/1/2002 | 6/30/2005 | $99,736.00 | Monique R. Evans | Jonathan Hughes | Office of Systems Planning and Program Management |
Safety | 14812 | Field Evaluation of Unlighted Overhead Guide Signs Using Older Drivers | Yes | 100% | Ohio University | Helmut T. Zwahlen | 10/28/2002 | 8/28/2003 | $90,620.00 | Monique R. Evans | Jim Roth | Office of Traffic Engineering |
Structures | 134137 | Design of Rock-Socketed Drilled Shafts | No |
|
E. L. Robinson Engineering of Ohio, Co. | Jamal Nusairat | 8/15/2003 | 11/1/2006 | $483,086.24 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 134153 | Dynamic Load Environment of Bridge Mounted Sign Support Structure | Yes | 75% | Case Western Reserve University | Arthur Huckelbridge | 11/1/2003 | 6/1/2005 | $10,000.00 | Omar Abu-Hajar | Randall Over | District 12 |
Structures | 134155 | Evaluation of Stay in Place Metal Forms | No |
|
University of Toledo | Douglas K. Nims | 11/15/2003 | 6/30/2006 | $247,484.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 134188 | Predicting Fatigue Lifetime From Strain Histograms Observed in an Abbreviated Time Window | No |
|
Case Western Reserve University | Arthur Huckelbridge | 9/1/2004 | 12/1/2006 | $53,913.00 | Omar Abu-Hajar | Scott Seeley | Office of Structural Engineering |
Structures | 14595 | Predicting The Ultimate Load Capacity of Long-Span Precast Concrete Arch Culverts | Yes | 100% | University of Dayton | Manoochehr Zoghi | 7/1/1994 | 9/1/1995 | $9,993.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14611 | Instrumentation, Testing, and Monitoring of a Newly Constructed Reinforced Concrete Deck-on-Steel Girder Bridge - Phase III | Yes | 100% | University of Cincinnati | Arthur Helmicki | 4/3/1995 | 3/3/2000 | $661,080.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14615 | Use of HPC for an Adjacent Box Beam Bridge Guernsey County, Ohio, Bridge #GUE-22-0657 | Yes | 100% | University of Cincinnati | Richard Miller | 6/17/1996 | 10/29/1999 | $352,926.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14635 | Bridge Type Specific Management of Steel-Stringer Bridges in Ohio - Phase I: Validation of Tools | Yes | 75% | University of Cincinnati | Arthur Helmicki | 3/11/1996 | 7/11/2000 | $866,856.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14647 | Instrumented Elastomeric Bridge Bearings | Yes | 25% | University of Toledo | Douglas K. Nims | 5/20/1996 | 5/20/1999 | $85,983.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14648 | Instrumentation and Monitoring of Tieback wall of SUM82 at Brecksville | Yes | 100% | University of Akron | Robert Liang | 6/17/1996 | 12/7/2000 | $138,793.00 | Omar Abu-Hajar | Gene Geiger | Office of Geotechnical Engineering |
Structures | 14655 | Experimental Analysis of Composite Reinforced Bridge - Field Study | Yes | 100% | Ohio University | Shad Sargand | 9/3/1997 | 9/3/1998 | $22,508.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14682 | Field Verification of Structural Performance of Thermoplastic Pipe Under Deep Backfill Conditions | Yes | 100% | Ohio University | Glen Hazen | 6/20/1997 | 12/1/2001 | $391,795.00 | Omar Abu-Hajar | Doug Gruver | District 08 |
Structures | 14685 | Instrumentation, Monitoring, and Testing at the CUY-90-15.24 Central Viaduct Project | Yes | 100% | University of Akron | Robert Liang | 10/27/1997 | 4/27/2000 | $106,854.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 14688 | Infrared Inspection of Composite Reinforced Concrete Structures | Yes | 100% | The Aerospace Corporation | J. P. Nokes | 6/9/1998 | 10/30/2001 | $67,299.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14698 | Forces Exerted in the Wingwalls of skewed Semi-Integral Bridges | Yes | 100% | Ohio University | Eric Steinberg | 4/14/1998 | 9/30/2001 | $82,625.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 14705 | Drilled Shaft Foundations for Noise Barrier Walls & Slope Stabilization | Yes | 80% | University of Akron | Robert Liang | 5/18/1998 | 2/1/2003 | $399,851.00 | Omar Abu-Hajar | Chris Merklin | Office of Geotechnical Engineering |
Structures | 14707 | Drilled Shaft Testing at Washington County Segmental Bridge and Hamilton-50 Test Site | Yes | 100% | University of Akron | Robert Liang | 6/15/1998 | 6/15/2000 | $107,498.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 14708 | Field Performance Evaluation of Multiple Fiber Reinforced Polymer Bridge Deck Systems Over Existing Girders - Phase I | Yes | 100% | University of Cincinnati | Bahram Shahrooz | 7/6/1998 | 6/30/2001 | $402,111.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14715 | Field Performance Evaluation of Multiple Fiber Reinforced Polymer Bridge Deck Systems Over Existing Girders - Phase II | Yes | 100% | University of Cincinnati | Bahram Shahrooz | 5/3/1999 | 10/31/2005 | $1,655,696.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14716 | Structural Health Monitoring of the Tech 21 All-Composite Vehicular Bridge | Yes | 100% | University of Dayton | Manoochehr Zoghi | 9/14/1999 | 3/14/2003 | $64,986.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14717 | The Feasibility Study on Glass Fiber Reinforced Polymer (GFRP) Tubes Filled with Concrete for Pile/Column for Bridges | Yes | 100% | Stress Steel Company, Inc. | Srinivasa Iyer | 9/14/1999 | 9/30/2001 | $120,497.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14718 | Environmental/Durability Evaluation of FRP Composite Strengthened Bridges | Yes | 100% | Lawrence Technological University | Nabil Grace | 9/14/1999 | 12/14/2003 | $326,089.00 | Omar Abu-Hajar | Scott Seeley | Office of Structural Engineering |
Structures | 14719 | Retrofit of Existing Reinforced Concrete Bridges with Fiber Reinforced Polymer Composites | Yes | 100% | University of Cincinnati | Bahram Shahrooz | 9/13/1999 | 1/13/2002 | $163,379.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14721 | Performance Evaluation of Bridge with Fiber Reinforced Composite Decks | Yes | 100% | Ohio State University | William Wolfe | 9/15/1999 | 9/30/2002 | $125,000.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14722 | Evaluation of Composite Post-Tensioning System on Bridge COS-79-0955, Coshocton County | Yes | 100% | Ohio State University | William Wolfe | 9/15/1999 | 7/15/2001 | $200,567.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14723 | Evaluation of Composite Post-Tensioning System on Bridge SCI-23-0.96, Scioto County | Yes | 100% | Ohio State University | William Wolfe | 9/15/1999 | 9/15/2001 | $365,129.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14732 | Use of Fiber Reinforced Polymer Composites for Repair or Retrofit of Prestressed Box Girders | Yes | 100% | University of Cincinnati | Richard Miller | 4/3/2000 | 5/1/2003 | $56,902.00 | Omar Abu-Hajar | Scott Seeley | Office of Structural Engineering |
Structures | 14735 | MSE Wall & Reinforcement Testing at MUS-16 Bridge Site | Yes | 35% | University of Akron | Robert Liang | 4/3/2000 | 10/29/2004 | $348,871.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 14736 | Bridge Type Specific Management of Steel-Stringer Bridges: Development of Field Calibrated Software Rating Tools and Statistical Bridge Database | No |
|
University of Cincinnati | Arthur Helmicki | 4/3/2000 | 12/31/2005 | $422,676.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14737 | Development of a Load Test for the Evaluation & Rating of Short Span Reinforced Concrete Slab Bridges | Yes | 100% | Case Western Reserve University | Arthur Huckelbridge | 5/9/2000 | 2/9/2002 | $96,318.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14739 | FRP Composite Prestressing Strands | Yes | 100% | Lawrence Technological University | Nabil Grace | 5/9/2000 | 11/9/2003 | $263,278.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14742 | Transverse Cracking of High Performance Concrete Bridge Decks After One Season or Six to Eight Months | Yes | 50% | University of Cincinnati | Richard Miller | 4/10/2000 | 1/31/2005 | $104,279.00 | Omar Abu-Hajar | Scott Seeley | Office of Structural Engineering |
Structures | 14745 | Implementation of Field Measurements for Fatigue Lifetime Evaluation | Yes | 75% | Case Western Reserve University | Arthur Huckelbridge | 6/1/2000 | 12/1/2002 | $97,644.00 | Omar Abu-Hajar | Scott Seeley | Office of Structural Engineering |
Structures | 14747 | Further Use of Spread Footing Foundations for Highway Bridges | Yes | 25% | Ohio University | Shad Sargand | 5/1/2000 | 4/1/2006 | $143,328.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Structures | 14750 | Continued Long-Term Monitoring of HAM-42-0992 & HAM-126-0881L: Instrumentation, Testing, & Monitoring of Reinforced Concrete Deck-On-Steel Girder Bridges | Yes | 100% | University of Cincinnati | Arthur Helmicki | 6/12/2000 | 6/2/2005 | $105,290.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14755 | Environmental Durability Evaluation of Externally Bonded Composites | Yes | 100% | University of Cincinnati | Bahram Shahrooz | 6/19/2000 | 4/19/2004 | $173,190.00 | Omar Abu-Hajar | Scott Seeley | Office of Structural Engineering |
Structures | 14759 | Thin Bonded Overlay & Surface Laminates | Yes | 100% | Ohio Ready Mixed Concrete Association | James Barnhart | 8/21/2000 | 12/1/2001 | $10,637.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14764 | Ohio Bridge Maintenance Manual | Yes | 100% | Ohio State University | Osama Abdulshafi (not current) | 11/1/2000 | 12/31/2002 | $315,055.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14765 | Identification of Bridges in BARS Database Rated by WSD Method and an Intelligent Decision Support System to Convert the WSD-Based Rating to LFD-Based Rating | Yes | 25% | Ohio State University | Hojjat Adeli | 12/1/2000 | 2/29/2004 | $76,946.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14772 | Objective Condition Assessment of Deteriorated or Damaged Bridges in Ohio | No |
|
University of Cincinnati | Arthur Helmicki | 1/1/2001 | 12/31/2005 | $218,381.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14787 | Evaluation of Durability of Prestressed/Precast Concrete in Ohio | Yes | 100% | Concrete Research & Testing | Nick Scaglione | 4/1/2001 | 11/1/2002 | $47,105.00 | Omar Abu-Hajar | Tim Keller | Office of Structural Engineering |
Structures | 14788 | Instrumented Monitoring and Field Calibrated Modeling of WAS-339-2013 Prior to, During, And After Superload | Yes | 100% | University of Cincinnati | Arthur Helmicki | 6/1/2001 | 5/31/2002 | $88,325.00 | Omar Abu-Hajar | Amjad Waheed | Office of Structural Engineering |
Structures | 14789 | Verification of Performance and Design Criteria for High Performance Steel Bridge Girders (SJN Also 454190) | Yes | 100% | University of Cincinnati | James Swanson | 8/1/2001 | 12/31/2005 | $178,159.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14791 | Innovative Bridge Design/Construction Techniques to Expedite Construction | Yes | 90% | University of Cincinnati | Richard Miller | 10/1/2001 | 7/1/2002 | $12,418.00 | Omar Abu-Hajar | John Randall (not current) | Office of Structural Engineering |
Structures | 14792 | Pressure Distribution Around a Metal Pipe Under Deep Cover | Yes | 100% | Ohio University | Shad Sargand | 10/1/2001 | 9/30/2004 | $68,798.00 | Omar Abu-Hajar | Saleh El-Dabaja | District 10 |
Structures | 14794 | Dynamic Pile Testing Technology: Validation and Implementation | No |
|
University of Akron | Robert Liang | 2/1/2002 | 6/15/2007 | $367,460.00 | Omar Abu-Hajar | Jawdat Siddiqi | Office of Structural Engineering |
Traffic | 134154 | Human Factor Opportunities to Improve Ohio’s Transportation System | No |
|
Ohio University | Helmut T. Zwahlen | 12/1/2003 | 7/1/2005 | $118,083.00 | Monique R. Evans | Mohammad Khan (not current) | Office of Traffic Engineering |
Traffic | 134157 | Portable Bench Tester for Piezo Weigh-in-Motion (WIM) Equipment | No |
|
Athens Technical Specialist, Inc. | Gene Norris | 3/1/2004 | 5/1/2006 | $129,455.00 | Monique R. Evans | Robert Jessberger (not current) | Office of Technical Services |
Traffic | 14646 | Design & Development of an Automated NEMA Traffic Signal Controller Tester | No |
|
Athens Technical Specialist, Inc. | James Gilfert | 7/1/1996 | 8/30/2000 | $113,689.00 | Monique R. Evans | Rodger Dunn | Office of Traffic Engineering |
Traffic | 14673 | Dilemma Zone Protection & Signal Coordination at Closely-Spaced High-Speed Intersections | Yes | 100% | University of Cincinnati | Prahlad Pant | 3/17/1997 | 7/31/2001 | $122,971.00 | Monique R. Evans | Satya Goyal | Office of Traffic Engineering |
Traffic | 14674 | Evaluation of Ground Mounted Diagrammatic Entrance Ramp Approach Signs | Yes | 50% | Ohio University | Helmut T. Zwahlen | 3/31/1997 | 12/30/2000 | $183,288.00 | Monique R. Evans | Jim Roth | Office of Traffic Engineering |
Traffic | 14690 | Neural Network Model for Automatic Traffic Incident Detection | No |
|
Ohio State University | Hojjat Adeli | 1/12/1998 | 8/31/2001 | $145,184.00 | Monique R. Evans | George Saylor | Office of Traffic Engineering |
Traffic | 14714 | Field Evaluation of the CTCLS Series Traffic Signal Load Switches in the Field | Yes | 100% | Ohio University | Helmut T. Zwahlen | 3/19/1999 | 9/1/2003 | $677,965.00 | Monique R. Evans | Homer Suter | Office of Traffic Engineering |
Traffic | 14748 | LED Traffic Signal Lamp Characteristics | Yes | 100% | Athens Technical Specialist, Inc. | James Gilfert | 6/6/2000 | 6/30/2002 | $47,906.00 | Monique R. Evans | Satya Goyal | Office of Traffic Engineering |
Traffic | 14754 | Field Testing & Implementation of Dilemma Zone Protection & Signal Coordination at Closely-Spaced High-Speed Intersections | Yes | 100% | University of Cincinnati | Prahlad Pant | 6/12/2000 | 5/30/2005 | $159,094.00 | Omar Abu-Hajar | Satya Goyal | Office of Traffic Engineering |
Traffic | 14756 | Implementation and Testing of the Travel Time Prediction System (TIPS) | No |
|
University of Cincinnati | Prahlad Pant | 6/16/2000 | 6/16/2001 | $211,663.00 | Monique R. Evans | Ken Linger | Office of Traffic Engineering |
Traffic | 14757 | An Intelligent Decision Support System for Work Zone Traffic Management & Planning | No |
|
Ohio State University | Hojjat Adeli | 8/14/2000 | 4/30/2004 | $185,357.00 | Monique R. Evans | Ken Linger | Office of Traffic Engineering |
Traffic | 14760 | Evaluation of a Real-time Travel Time Prediction System in A Freeway Construction Work Zone | No |
|
Ohio University | Helmut T. Zwahlen | 8/22/2000 | 6/30/2001 | $9,988.00 | Monique R. Evans | Ken Linger | Office of Traffic Engineering |
Traffic | 14785 | Smart Sign Ordering System | Yes | 100% | University of Akron | Ping Yi | 3/13/2001 | 5/31/2004 | $68,842.00 | Monique R. Evans | Jim Roth | Office of Traffic Engineering |
Traffic | 14808 | Improved Work Zone Design Guidelines and Enhanced Model of Travel Delays in Work Zones | No |
|
Ohio University | Helmut T. Zwahlen | 9/1/2002 | 2/1/2006 | $901,819.58 | Monique R. Evans | Mack Braxton | Office of Traffic Engineering |
For more project information, please contact the R&D Project Manager