200  EARTHWORK

ITEM 201  CLEARING AND GRUBBING

201.01  Description

201.02  General

201.03  Clearing and Grubbing

201.04  Scalping

201.05  Method of Measurement

201.06  Basis of Payment

 

201.01  Description.  This work consists of clearing, grubbing, scalping, removing trees and stumps, and removing all vegetation and construction debris from the limits shown on the plans, except such objects that are to remain or are to be removed according to other items of work.

Use all suitable excavation material in the work.  Alternatively, legally use, burn, or dispose of all material according to 105.16 and 105.17.

201.02  General.  Remove or save all trees, shrubs, and plants designated on the plans.  Preserve all vegetation and objects not designated for removal.  Paint cut or scarred surfaces of trees or shrubs selected for retention according to 666.04.

The time limitations on the clearing and grubbing operations are specified in Item 207.

201.03  Clearing and Grubbing.  Clear and grub all trees and stumps marked for removal and all surface objects, brush, roots, and other protruding obstructions not designated to remain, except for special treatments listed below:

A.     In locations to be seeded, remove stumps at least 6 inches (150 mm) below ground surface.

B.      In unseeded areas to be rounded at the top of backslopes, cut the stumps flush with or below the surface of the final slope line.

C.      The Contractor may leave undisturbed stumps and roots, and nonperishable solid objects 6 inches (150 mm) above the existing ground surface in the plan embankment construction locations where the embankment height is greater than 9 feet (3 m) from the subgrade elevation and when the existing side slope is 8:1 or flatter.

D.      In locations outside of the construction limits of the cut and embankment areas not to be seeded, the Contractor may leave sound stumps 24 inches (0.6 m) above the existing ground surface.

Except in areas to be excavated, backfill stump holes and other holes created by removing obstructions with Item 203 embankment material.  Place and compact according to Item 203.

Remove low hanging, unsound, or unsightly branches on trees or shrubs designated to remain.  Trim branches of trees extending over the roadbed to provide a clear height of 20 feet (6 m) above the roadbed surface.

Dispose of debris contaminated with garbage, solid waste, or hazardous waste or material according to other contract items.

201.04  Scalping.  Scalping includes removing surface material such as roots, sod, grass, residue of agricultural crops, sawdust, and decayed vegetable matter.  The depth of scalping does not include topsoil or other material below the scalping operation.  The Engineer will not require areas to be scalped in the plan embankment construction locations where the embankment height is greater than 9 feet (3 m) to the subgrade elevation and when the existing side slope is 8:1 or flatter.  Scalp all other areas where excavation or embankment is required.

201.05  Method of Measurement.  The Department will measure by one of the following methods:

If Clearing and Grubbing is specified in the Contract, the Department will not measure the area cleared and grubbed.

If Item 201 Tree Removed or Item 201 Stump Removed is specified in the Contract, the Department will measure trees or stumps designated for removal according to the following schedule of sizes:

Pay Item Diameter

Pay Item Designation

Over 12 inches to 24 inches

18-inch size each

Over 24 inches to 36 inches

30-inch size each

Over 36 inches to 60 inches

48-inch size each

Over 60 inches

60-inch size each

Over 0.3 m to 0.6 m

0.5 m size each

Over 0.6 m to 0.9 m

0.8 m size each

Over 0.9 m to 1.5 m

1.2 m size each

Over 1.5 m

1.5 m size each

 

The Department will measure the diameter of trees at a height of 54 inches (1.4 m) above the ground.  Trees 12 inches (0.3 m) and less in diameter are classified as brush.  The Department will measure stumps by taking the average diameter at the cutoff.

201.06  Basis of Payment.  If Item 201 Clearing and Grubbing is specified in the Contract, the Department will pay for all work described, including backfilling holes, scalping, and removing all trees and stumps, at the lump sum price bid.  If Item 201 Tree Removed or Item 201 Stump Removed is specified in the Contract, the Department will consider the remaining work described incidental and will not pay for performing this work directly.

The Department will pay for accepted quantities at the contract prices as follows:

Item           unit                                Description

201             Lump Sum                      Clearing and Grubbing

201             Each                                Tree Removed, ___ Size