| 4/28/2025 | | 118279 | | The project will remove the existing traffic signal and construct a roundabout at the intersection of Union St (SR 56) and SR 682. The project will include drainage system adjustments, new intersection lighting, and pedestrian facilities along the corridor. | |
| 4/28/2025 | | 108940 | | This project includes the construction of a ten-foot wide multi-use trail from camelot drive to broadview road (SR 176) and all the associated tree removals, grading, pavemetn, drainage, and pavement markings and signage. The multi-use trail will also cross west creek with a 3-span steel beam with cast in place deck structure with an approximate lenght of 140 feet. | |
| 4/28/2025 | | 106095 | | This project provides for the resurfacing of Indianola Ave from Hudson St to Oakland Park Ave. This project includes roadway pavement repairs, spot replacement of curb and sidewalk, construction of ADA curb ramps and installation of curb extensions and associated storm water collection improvements. This project will install bike lanes in both directions within the existing pavement limits.
| |
| 4/28/2025 | | 119999 | | Proposed shared-use path located on the west side of Columbus Road. Additional work includes curb and walks. | |
| 4/28/2025 | | 121489 | | Bridge rehabilitation of MAD-CR70-0.39, Glade Run Road over Deer Creek | |
| 4/28/2025 | | 117001 | | Construction of a shared use trail connecting Talawanda High School and Talawanda Middle School, with a separate leg to a new regional transit facility on Chestnut Street. | |
| 4/18/2025 | | 11707 | | THIS PROJECT INCLUDES RESURFACING AND PEDESTRIAN IMPROVEMENTS ON MAPLE ST. AND RACE ST. THIS PROJECT ALSO INCLUDES SIGNAL REMOVALS, NEW SIGNAGE, ENHANCED CROSSWALKS WITH RRFB'S, CURB RAMPS, STRIPING, AND OTHER NECESSARY RELATED SCOPE ITEMS.
| |
| 4/18/2025 | | 113802 | | HUR-T.R.182-01.16 (Vesta Road) Design/Build replacement of structurally deficient steel single span Pony Truss bridge. | |
| 4/17/2025 | | 117458 | | Structure replacement of CR23 (Cardington-Chesterville Rd) over Big Walnut Creek. | |
| 4/17/2025 | | 121606 | | Rehabilitation of the bridge deck and approach slabs of the Saint Clair Street bridge over the Grand River in the City of Painesville and Village of Fairport Harbor, Lake County | |
| 4/17/2025 | | 118731 | | Replace superstructure of SFN 7839804 S Main Ave bridge over the Mahoning River in the City of Warren | |
| 4/14/2025 | | 121910 | | This project replaces the existing truss bridge on CR 111. The new bridge will consist of three span cast in place concrete slab with capped pile piers and abutments on drilled shafts socketed into rock. | |
| 4/9/2025 | | 114951 | | Replacement of a three-span continuous concrete slab bridge over the Sycamore Creek with a new three span continuous concrete slab bridge and minimal roadway approach work. | |
| 4/9/2025 | | 113471 | | Rehabilitation of the Harrisburg-Georgesville Road Bridge over Big Darby Creek between Opossum Run Road and London-Groveport Road by replacing the deck and arch fill and repairing the arches and spandrel walls. The rehabilitated structure will include the original decorative bridge railing detail and other incidentals necessary to complete work. | |
| 4/9/2025 | | 116171 | | Pavement Markings | |
| 4/9/2025 | | 116733 | | Rehabilitation of SFN 7837003 CR-67 (Austintown-Warren Rd) bridge over Meander Reservoir. | |
| 4/9/2025 | | 116868 | | Signal replacements/upgrades on SR 46 and SR 169 (Main St) in the City of Niles, Trumbull County, Ohio. | |
| 4/9/2025 | | 122483 | | Remove and replace broken sections of sidewalks along the commercial corridors in the city. | |
| 4/9/2025 | | 111283 | | The project includes the widening of SR 254 (Detroit Road) and SR 83 (Center Road) to construct safety improvements. The intersection will be widened to provide an additional southbound through lane and northbound right turn lane on SR 83. Along SR 254, an additional eastbound left and right turn lanes and extend through lanes east of Avon Commons. Additional project elements include resurfacing, signing, pavement marking, drainage and signal installations/upgrades. | |
| 4/7/2025 | | 122183 | | Replace two Rectangular Rapid Flashing Beacons along Superior Street/SR 65 with two Pedestrian Hybrid Beacons in Rossford. | |
| 4/7/2025 | | 119133 | | The project involves replacement of Bridge No. SU-23-21, located on Lawndell Road and spanning the Sugar Creek. | |
| 4/7/2025 | | 117476 | | Construct sidewalks and pedestrian safety infrastructure at Brookside, Stiles, W. Franklin and Worthington Hills Public Schools. | |
| 4/7/2025 | | 117469 | | This project consists of the reconstruction of the Blackwood Covered Bridge by temporarily dismanteling the bridge; construction of a concrete bond beam on the sandstone abutments; construction of a structural steel superstructure; reconstruction of the covered bridge on the steel superstructure; and other related work to complete the project. | |
| 4/7/2025 | | 116464 | City of Akron Chris Jonke CJonke@akronohio,gov 330-375-2015 | Construction of a 4,280 LF multi-modal trail along an abandoned railroad between Huntington Ave and S Arlington St in the City of Akron, Summit County, Ohio. | |
| 4/3/2025 | | 120812 | | Resurfacing and repair of the Holmes County Trail from approx. 1.25 miles north of Depot in Millersburg to the Village of Killbuck. | |
| 4/2/2025 | | 112478 | | Replacement of SFN 4131886, which carries TR 472 over Goose Creek in Springfield Township of Jefferson County. | |
| 4/2/2025 | | 120271 | | Construction of 400 feet of sidewalk along CR 160 (W Old Main St.) in the unincorporated community of Winesburg. Work includes two retaining walls, drainage items, curb ramps, detectable warnings, a mid-block pedestrian crossing, pavement markings, and installation of signage. | |
| 4/2/2025 | | 117097 | | This project consists of construction of the Blanchard River Greenway Trail extension along State Route 568 in the City of Findlay from the intersection of County Road 236 to Riverbend Park. Project consists of 1.5 miles of 10 FT. multi-use trail, including 0.15 miles along TR241 of striped multi-use roadway to tie into the existing path. Project includes 64-ft length prefabricated bridge. | |
| 4/2/2025 | | 117987 | | Bridge replacement of KNO CR 9 1.05 (SFN 4230272) | |
| 4/2/2025 | | 114002 | | Striping Centerline and Edgeline of Various County Roads using Spray Polyester Pavement Markings | |
| 4/2/2025 | | 114001 | | Striping Centerline and Edgeline of Various County Roads using Spray Polyester Pavement Markings | |
| 4/1/2025 | | 121881 | | This project consists of 4.154 miles of double chip seal on Athens County Road 29 – Big Bailey Run Road. | |
| 4/1/2025 | | 121881 | | This project consists of 4.154 miles of double chip seal on Athens County Road 29 – Big Bailey Run Road. | |
| 3/28/2025 | | 113959 | | Resurfacing E. Perkins from Milan to Remington | |
| 3/28/2025 | | 119148 | | The project shall include the realignment of the Bainbridge Road intersection at Washington Street, including drainage improvements and new signalization. | |
| 3/28/2025 | | 119360 | | The project involves full-depth pavement replacement and complete replacement of the existing East Vine Street bridge over Plum Creek. Sidewalks and existing storm sewers will be reconstructed. Traffic control as indicated in the plans. | |
| 3/28/2025 | | 121823 | | The project shall include the asphalt resurfacing of Wilson Mills Road (CH-0008), from Heath Road at the Chester Township Line (TR-0105) to Thwing Road (CH-0027). The work shall include improvements of approximately 4.48 miles of roadway. | |
| 3/26/2025 | | 115410 | | The existing traffic signals at the intersections Rich St with 3rd St, 4th St, 5th St, and Grant Ave will be fully replaced including new poles and equipment. New fiber optic cable will be installed within the limits of each intersection to connect the signals to the existing Columbus Traffic Signal System (CTSS) network. Additional work includes the brick walk, drainage structure replacement, and new signing and pavement markings. | |
| 3/26/2025 | | 119000 | | Replacement Bridge #164 over branch of Chagrin River on Pioneer Trail within the City of Aurora. Work includes new substructure, new superstructure, and minor approach work. | |
| 3/25/2025 | | 119454 | | Sidewalk and curb ramp replacement, installing ADA curb ramps, crosswalk striping and bicycle repair station around Kirkmere Elementary School in the City of Youngstown. | |
| 3/25/2025 | | 118891 | | Rehabilitation of SFN 7660456 STA Belden Ave NE bridge over East Branch of the Nimishillen Creek by patching the deck slab, abutments, and piers, as well as replacement of the approach slab and guardrail. | |
| 3/25/2025 | | 115364 | | Construction of 1.3 miles of multi-use path along E. Milltown Road and 0.5 miles of multi-use path along Melrose Drive in the City of Wooster. | |
| 3/25/2025 | | 122366 | | Install pavement markings at various locations in Medina County | |
| 3/25/2025 | | 121909 | | This project replaces the existing bridge on TR 32. The new bridge will consist of a single span steel beam bridge with a composite concrete deck and integral abutments on driven H-Pile. | |
| 3/25/2025 | | 121573 | | Milling and resurfacing approximately 0.76 miles of Fulton Street from the Norfolk Southern Railway to West Linfoot Street. | |
| 3/25/2025 | | 114354 | | Resurfacing CR 32 starting at CR 11 and finishing at CR 130. Resurfacing CR 130 starting at the Bellefontaine south corporation limit to the US 33 Ramp. | |
| 3/20/2025 | | 116465 | | Upgrade traffic signals at 14 intersections in Forest Park including new controllers, new detection, and connection to a centrally based system. | |
| 3/19/2025 | | 95403 | | CUY-Rockside Road (C.R.53) Rehabilitation of Existing Bridge 03.23 over the Cuyahoga Valley Scenic Railroad Replacement of Existing Bridge 03.32 over the Cuyahoga River in the Village of Valley View City of Independence | |
| 3/19/2025 | | 113665 | | Tbe work coru;ists of furnishing all labor, materials and equipment necessary for the replacement of the existing bridge on Factory Road over the Little Beaver Creek with a three span concrete slab bridge, the widening of Factory Road at the bridge approaches, the construction of pedestrian facilities from US 35 to the Creekside Trail, and all other work as may be necessary to complete the contract in accordance with the plans and specifications. | |
| 3/19/2025 | | 121427 | | Removal, replacement and installation of all ‘POOR’ rated guardrail and various ‘FAIR’ rated guardrail along various county routes. Said routes include major collectors, minor collectors, and local roads. | |
| 3/19/2025 | | 122963 | | Repaving and Restriping of CR 424 from Independence Dam State Park entrance to the Defiance Henry County Line Rd. | |
| 3/18/2025 | | 119873 | | Proposed improvements include the replacement of 166’ of the Garfield Parkway box culvert, SFN 1890808, enclosing Mill Creek in the Cleveland Metroparks Garfield Reservation. The project also includes approximately 350 feet of stream restoration, site grading, pavement restoration and ancillary site work. | |
| 3/17/2025 | | 113511 | | Upgrade of existing Type 5 Guardrail and deficient end treatments to MGS guardrail and compliant end treatments along sections of County Road 10 (Lackey Old State Road). Project includes ~8200 feet of new MGS guardrail and modern terminal assemblies along with associated site/shoulder preparation work. | |
| 3/17/2025 | | 121915 | | This project includes sidewalk and pedestrian enhancements on Cleveland Ave NW, from 8th St. NW to 12th St NW, in the City of Canton. The work replaces 4’ wide sidewalk with 10’ wide sidewalk on western side. Also, the project extends a 10’ wide side path and 5’ tree lawn on the eastern side of the street, negating the need for bicycle lanes on Cleveland Ave pavement. Finally, the work includes installation of new decorative street lighting. | |
| 3/17/2025 | | 119801 | | Resurfacing of Cleveland Ave (CR 66) from 12th St to the Canton North Corp Limit, in the City of Canton, Stark County, Ohio. Includes full and partial depth repairs, repairing catch basins, manholes, ADA curb ramps, and new pavement markings. | |
| 3/17/2025 | | 119717 | | Rehabilitation of historic truss over the Great Miami River and the installation of a concrete walk to allow recreational access to the Great Miami River. | |
| 3/17/2025 | | 119477 | | Replacement of Bridge No. HAS C0013 13119 (SFN 3430383), which carries CR 13 (Blairmont Rd.) over North Fork of Short Creek. | |
| 3/17/2025 | | 11996 | | Replace existing superstructure and modify existing abutment seat with minimal roadway work. | |
| 3/17/2025 | | 117274 | | This project consists of construction of an 8’ wide concrete sidewalk from Brookside Trail to the Joyce E. Hanks Community Center. The project also includes installation of a rectangular rapid flashing beacon RRFB) at the Joyce E. Hanks Community Center, drainage improvements, traffic control at side roads, and seeding, mulching, and lawn restoration. | |
| 3/17/2025 | | 113811 | Huron County Engineer Lee E Tansey, PE, PS ltansey@hurncountyengineer@org 419-668-1997, ext 105 | HUR-C.R.183-00.80 (Chenango Road) Design/Build replacement of structurally deficient steel single span Pony Truss bridge. | |
| 3/17/2025 | | 111341 | | Replacement / installation of guardrail on various county roads | |
| 3/13/2025 | | 121991 | | THIS PROJECT CONSISTS OF STREETSCAPE ENHANCEMENTS FOR APPROXIMATELY 1,350 FT OF TUSCARAWAS STREET EAST FROM THE WHEELING AND LAKE ERIE RAILROAD CROSSING TO THE NORFOLK AND SOUTHERN RAILROAD CROSSING. ENHANCEMENTS INCLUDE NEW CURB, WALK, LIGHTING, BRICK, RESURFACING AND RE-STRIPING.
| |
| 3/13/2025 | | 120616 | | This project proposes to resurface US-224 from the intersection of SR-18 (W. Market St.) to approximately 1,000 feet east of Saint Lawrence Drive, including spot full depth repairs and pavement markings. | |
| 3/13/2025 | | 119849 | | Replace structure on Kimberly Parkway over Mason Run (SFN 2560283) in the City of Columbus. | |
| 3/13/2025 | | 119419 | | Removal of existing pony truss and steel beam superstructures with new bridge superstructures, new substructure behind the existing abutments, and a new pier. Use the typical roadway section to transition from the new bridge profile to the existing pavement. | |
| 3/13/2025 | | 118741 | Scioto County Engineer Darren LeBrun, PE, PS darren.lebrun@sciotocouny engineer.org 740-259-5541 | Project consists of constructing a new retaining wall, a 4' paved shoulder from the beginning of the new solder pile wall to the corporation pavement joint, microsurfacing from the beginning of the curve before TR399 Pleasant Valley Road to the corporation pavement joint. Work also includes installing enhanced flashing signage, installing new guardrail along the new soldier pile wall, replacing existing guardrail anchors, and painting new thermoplastic centerline and edge lines along the project route. | |
| 3/13/2025 | | 116054 | | Construction of a replacement single-span composite prestressed concrete box beam bridge. | |
| 3/13/2025 | | 115280 | | Construction of shared used path along Mansfield Avenue (CR 5) from Belmont Avenue to Grange Avenue | |
| 3/13/2025 | | 110610 | | Resurfacing of approximately 2.25-mile section of Brecksville Road (SR-21) between Royalton Road (SR-82) and Sprague Road (the northern corporation limit). Work will include milling of existing asphalt and replacement, and curb ramp replacement. | |
| 3/11/2025 | | 120480 | | Replacement of the SFN 7730225 Kent St bridge over the Little Cuyahoga River in the City of Akron, Summit County, Ohio. | |
| 3/6/2025 | | 122170 | | Installation of approximately 2,800 ft. of a concrete multi-use path along County Road 9 and State Route 12 on the Liberty Benton Academic Complex, as well as an actuated pedestrian crossing on County Road 9 at Early Drive. | |
| 3/6/2025 | | 119771 | | Construct 750 feet of new concrete sidewalk, curb ramps, new storm sewer, retaining wall, and RRFB’s. | |
| 3/6/2025 | | 120142 | | Installation of electric vehicle charging infrastructure in OTR and CBD parking garages. | |
| 3/6/2025 | | 117454 | | Construction of 1.6-miles of a shared use path (SUP) from the Village of Octa to SR 729 in the Village of Milledgeville. | |
| 3/6/2025 | | 113551 | | Installation of pavement markings on various County roads within Pickaway County, and other work all in accordance with the plans, specifications, and bid documents. | |
| 3/4/2025 | | 112026 | | Reconstruction of East Main Street with full depth asphalt pavement, a landscaped median, a roundabout at Willow St., a roundabout at Horning Rd., concrete curbs, bus pull offs, drive aprons, sidewalk, and shared use path, catch basins and laterals, fire hydrant and water main relocations, retaining walls, traffic signals, signing, markings, lighting, landscaping and building demolition. | |
| 3/4/2025 | | 117989 | | Bridge replacement on MUS TR 420A (SFN 6040322) | |
| 3/4/2025 | | 117988 | | Design/build bridge replacement located on Schoenling Road at the intersection of Bay Road in Morgan Township, Butler County, Ohio. Project includes the replacement of a 44’ steel beam bridge with the construction of a new 3-sided structure to be located outside of the ordinary high water, as well as significant roadway approach work. | |
| 3/4/2025 | | 116833 | | Road diet lane reductions on Walnut St from Front St to Commerce St and Boardman St from Walnut St to Market St in the City of Youngstown, Mahoning County, Ohio. Includes safety lighting, sidewalks and crosswalks and a new stairway on Walnut St | |
| 3/3/2025 | | 113165 | | Intersection improvement at Shepard Rd/Richmond Rd/Broadway Ave/Ravenna Rd by adding right turn lanes on Ravenna Rd and left turn lane on Shepard Rd. Includes curb, sidewalks, signal and drainage improvements. | |
| 3/3/2025 | | 112040 | | The project involves widening, resurfacing and improvements of Dressler Rd, Everhard Rd and Belden Park Crossing to accommodate new lane configurations. A raised median will be added on Dressler Rd between Belden Village St and Everhard Rd and between Belden Park Crossing and University St. Raised medians will also be installed along Everhard Rd between Dressler Rd and the Children’s Physicians drive/Holiday Inn Drive. A New 12” water main will be installed on Everhard Rd. Also included within the plans are upgrades to drainage, signals, signing, striping, reconstruction of Southwest Mall entrance on Belden Village St, and the addition of retaining walls/sidewalk on the West side of Dressler Rd between Everhard Rd and Belden Park Crossing. | |
| 2/25/2025 | | 115809 | | The project consists of widening and resurfacing 3.13 miles of CR 14 (Danville Amity Road), improving ditches, extending and replacing culverts, and guardrail installation. | |
| 2/25/2025 | | 119991 | | Design/build bridge replacement located on Kyles Station Road approximately 0.6 miles east of Lesourdsville West Chester Road in Liberty Township, Butler County, Ohio. Project includes the replacement of a 3-span 112’ concrete box beam bridge with the construction of a new concrete bridge structure and associated roadway approach work. | |
| 2/25/2025 | | 119010 | | Replace existing simple span steel beam bridge on ex1stmg abutments. Remove old bridge, furnish and install a new prestressed concrete bridge members B21-48, (40'8" O/A) on existing abutments. | |
| 2/25/2025 | | 116426 | | The project consists of the improvement of 0.52 miles of E. Broadway, starting at the intersection of Main Street going to the intersection of Rudolph Road. Project includes full depth pavement reconstruction, pavement milling and resurfacing, full curb replacement, curb ramp upgrades, adjust and replacement of drainage structures, localized pavement repairs and drive apron replacements. | |
| 2/25/2025 | | 115191 | | The widening of Social Row Road from 2 lanes to 5 lanes from just east of Waterbury Ridge Lane to 400 feet east of Sheehan Road. Improvements also include new storm sewer, curb and gutter, sidewalk, shared use path, a new traffic signal at the intersection of Paragon Road, and a traffic signal replacement at the intersection of Sheehan Road. | |
| 2/25/2025 | | 113792 | | Safety Improvement on 0.75 mile of S.R. 72 (Limestone St.) by elimination of driveways; construction of five 10’ lanes, 1’ shy distance to curb, 4’ tree lawns and 6’ walks along with the necessary drainage structures and driveways; revision of lane assignments at the Limestone St. and Leffel Ln. Intersection; construction of pedestrian refuge islands; and replacement of traffic signals at Leffel Ln. and at John St. | |
| 2/25/2025 | | 113209 | | Intersection improvement at US 62 (W State St) and Beechwood Ave/Sawburg Ave, in the City of Alliance, Stark County, Ohio. Includes widening Beechwood/Sawburg to allow for northbound dual left turn lanes, northbound and southbound right turn lanes and radius improvement on NE quadrant. | |
| 2/24/2025 | | 117081 | | Rehabilitation of South Ave bridge (SFN 5060745) with new Superstructure over Y&S Railroad. | |
| 2/19/2025 | | 111193 | | Project in Bowling Green to resurface South Main St (SR 25) from south corporation line to Ordway Ave with spot full depth repairs. Includes signal improvements, repair of existing sidewalk and curb and gutter, installation of a new left turn lane at Napoleon Rd, the installation of a shared use path from Gypsy Lane Rd to Napoleon Rd, two pedestrian hybrid beacons, and other related necessary scope items. | |
| 2/18/2025 | | 121014 | | Installation of pedestrian crossings on SR 13 at Valleyview Drive and Forest Hills Drive intersections, including rectangular rapid flashing beacons, signs, crossing and yield line pavement markings, and ADA curb ramps. | |
| 2/18/2025 | | 115198 | | Guardrail replacement on various county roads. | |
| 2/18/2025 | | 117240 | | Installation of sidewalk from Lincoln Avenue to Heron Drive with pedestrian traffic control measures. | |
| 2/11/2025 | | 121405 | | Rehabilitating the Beach Rd Bridge over the Big Darby Creek by investigating for grout voids in ducts, remedial grouting, and various other repairs. | |
| 2/11/2025 | | 120294 | | The project involves replacement of existing guardrail along various County Roads in Stark County. | |
| 2/11/2025 | | 118053 | | Roadway right sizing on Harrison Ave from Queen City Avenue to Corp Line (Cheviot) including pedestrian safety improvements, roadway pavement improvements, traffic signal rebuilds, and retaining walls. | |
| 2/11/2025 | | 113722 | | Realign and widen Mason-Morrow-Mill Grove Road (CR 38) west of the Columbia Road North (CR 15) intersection. Add signing and pavement marking improvements and replace the existing box culvert with a new elliptical culvert. | |
| 2/11/2025 | | 111451 | | The work for which proposals are invited consists of furnishing all labor, equipment and material for the widening of North Fairfield Road from Fairbrook Elementary School to Shakertown Road to three (3) lanes, curb, gutter, storm sewer, an eight (8) foot sidewalk along the east side of North Fairfield Road and a five (5) foot sidewalk along the west side of North Fairfield Road, and all other work as may be necessary to complete the contract in accordance with the plans and specifications. | |
| 2/5/2025 | | 119754 | | Pedestrian safety improvements at various locations in the city. Installation of raised crosswalks on Herschel Ave, Main St, and Hatmaker St. Reconfiguration of Central Pkwy and Stark St intersection. Reconfiguration of Red Bank Rd and Woodford Rd intersection. Installation of sidewalk on Duck Creek Rd. | |
| 2/5/2025 | | 118514 | | This project involves widening and reconstruction of Sunnyside Road (CR 624) from 200 feet north of Shady Lake Drive to Liberty Avenue (U.S. 6) for approximately 0.4 miles. The work to be performed includes roadway widening and reconstruction, roadside drainage, grading, and signing and pavement marking. | |