July 2021 SCD Updates.pdf
  
115 KB
•DM-1.2 
    o Revised miscellaneous drawing labels to reflect
         updated terminology.
    o Removed 8” Type F conduit reference.
    o Revised drawing notes to reflect C&MS 605
        changes.
•All but DM series – Renamed to match the name to the item each drawing is detailing.

7/16/2021
January 2021 SCD Updates.pdf
  
92 KB
• CB 2.1 & 2.2- Add language to last sentence of Blockout Note clarifying that the expansion joint shown in the curb is required for all curb types.
1/15/2021
July 2020 SCD Updates.pdf
  
66 KB
•DM-1.1 – Update references to Tied Concrete Block Mat
•DM-4.1 - Revise notes and channel installation details
7/17/2020
July 2020 Location and Design and SCD Revisions.mp4
  
12641 KB
Video presentation of July 2020 L&D and SCD revisions
7/17/2020
July 2019 SCD Updates.pdf
  
60 KB
• CB-1.1 – Clarified manufacturer grate type
• I-2.2 – Corrected cut-section call out and clarified dimensions
7/19/2019
July 2018 SCD Updates.pdf
  
134 KB
• CB-1.1 – Added Catch basin Type 2-2C, includes frame and grate for parking lot installations with Detail and Notes
• CB-2.1 – Removed bicycle safe grate wording referring to diagonal grate.
• CB-2.2 – Updated Notes to correct the number of grates from two to one. Removed bicycle safe grate wording referring to diagonal grate.
• I-1.1 – Updated All details to reflect use in variable width concrete medians
• DM-4.1 – Added Clarification and simplification to the flume location and construction
7/20/2018
July 2017 HY SCDs Updates.pdf
  
189 KB
•DM-1.1: Updated Riprap Cutoff Wall notes to reflect changes in C&MS 601.04.
•HW-2.1: Updated precast notes to reflect changes in C&MS 602.03. 
•HW-2.2: Updated precast notes to reflect changes in C&MS 602.03. 
•HW-1.1, 2.1, & 2.2 moved under the Office of Structural Engineering.
7/21/2017
January 2016 HY SCDs Updates.pdf
  
196 KB
• CB-1.2, 1.3: Added General Note to both drawings stating that CBs 2-3, 2-4, 2-5, & 2-6 are not intended for traffic bearing applications.
• CB-1.1, 1.2, 1.3, 2.1, 2.2, 2.3, 3.1, 3.2, 3.3, 3.4; I-1.1, 1.2, 2.1, 2.2, 2.3, 2.4; MH-1.2: Revised Openings note to clarify minimum pipe opening size.
• MH-1.1: Revised notes and drawing to better conform with available frame and cover castings.
• DM-1.1: Removed the animal guard from the notes and drawings for the Reinforced Concrete Outlet and Outlet Pipe.
• DM-4.1, 4.4; HW-2.1, 2.2:  Revised notes and drawing by replacing “Fabric Filter” with “Geotextile Fabric”.
• DM-4-3: Revised Sediment Dam and Sediment Basin drawings.
1/15/2016
July 2015 Standard Drawing Revision.pdf
  
58 KB
• HW-2.1 Half-Height Headwalls For Corrugated Metal Pipe and Plastic
Revised the requirements for the anchor cable to something more readily available. Provided an eye bolt as another option to securing anchor cable to headwall.
• HW-2.2 Half-Height Headwalls For Concrete Pipe
Switched the tables of span/rise to rise/span for elliptical concrete pipe.
7/17/2015
1-16-2015 Hyd SCD Revisions.pdf
  
30 KB
DM-1.4 Conduit Installation - Drawing Removed
1/16/2015
Revision_document_July2014.pdf
  
52 KB
Standard Drawing DM 1.3 Slotted Drain – trapezoidal grate only
7/18/2014
1-17-2014 Hyd SCD Changes.pdf
  
13 KB
The following SCDs have been revised: CB-2.2, I-2.1, I-2.2, I-2.3, & I-2.4
1/17/2014
July 2013 Hyd SCD Changes.pdf
  
10 KB
The following Standard Construction Drawings have been changed: DM-4.1 & DM-4.3.
7/19/2013
SCD_1-18-2013_Transmittal.pdf
  
13 KB
All Standard Drawings have been updated.
1/18/2013
SCD_7-20-12_transmittal.pdf
  
54 KB
All Standard Drawings have been updated
7/20/2012
SCD_10-21-11_transmittal.pdf
  
163 KB
The following Standard Construction Drawings have been changed:  DM-4.1, DM-5.1, I-2.1 and I-2.4
10/21/2011
SCD_7-15-11_transmittal.pdf
  
58 KB
The following Standard Construction Drawings have been changed: DM-1.4
7/15/2011
SCD_1-21-11_transmittal.pdf
  
16 KB
The following drawings have been modified: DM-1.1, DM-4.1