Columbia Parkway Bridge Work Postponed
Hamilton County (Monday, November 18, 2019) – A bridge clearing project on the Columbia Parkway bridge in downtown Cincinnati has been postponed temporarily.
Crews have been working to clear loose concrete and debris from the Columbia Parkway bridge that carries traffic over Interstate 471 and Eggleston Street. Although additional work was scheduled on the ramp from eastbound 5th Street/westbound Columbia Parkway to I-471 South tonight, November 18, the project has been postponed due to equipment malfunction.
Thus, the ramp and southbound I-471 lanes will remain open tonight. A schedule to resume operations has yet to be determined.