Sign In
An Official Site ofOhio.gov

Various State Route lane closures scheduled for culvert replacements

 
Various State Route lane closures scheduled for culvert replacements
 
Clermont County (Friday, March 31, 2017) – Three culvert replacements require various State Route lane closures beginning next week.
 
Monday, April 3 through Friday, April 28 - Various lane closures will be in place each week day from 7 a.m. to 7 p.m. at the following locations:
 
·         State Route 132 in Ohio Township, between Lindale/Mt. Holly and Concord roads.
·         State Route 125 in Tate Township between Beth-New and Davis roads.
·         State Route 131 in Miami Township between Wild Rose Lane and Dry Run Road.
 
Traffic will be maintained.
 
Arrow boards and/or signs will be in place to alert motorists of the upcoming work zone and road closure.
 
To help ensure the safety of the construction workers as well as the traveling public, motorists should remain alert, reduce their speed and watch for stopped traffic while passing through a work zone.
 
For ongoing traffic, construction and weather-related information, please check www.OHGO.com
 
###
 
The Ohio Department of Transportation maintains the state's largest man-made asset--the transportation system. ODOT's mission is to provide the safe and easy movement of people and goods from place to place. As a $2.8 billion per year enterprise, ODOT invests the bulk of its resources in system preservation through maintenance, construction and snow and ice operations.
 
The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.
 
 
For more information contact:
Brian Cunningham, Communications Manager, at (513) 933-6517
Liz Lyons, Public Information Specialist, at (513) 933-6534
or email D08.PIO@dot.state.oh.us