I-71 Lytle Tunnel

I-71 Lytle Tunnel

PID 87268

Bring tunnel and its systems into compliance with current fire codes and design standards. It includes lighting, mechanical and ventilation systems upgrade; concrete and tile repair; and cameras and fire detection system installation.
  • Began: June 2015
  • Open to traffic: July 2018
  • Final Completion: September 2019
  • Construction Cost: $32 million