| | Belmont | I-70/Mall Rd. Interchg Amendments | Modify the Mall Road Interchange for Traffic Capacity, Highway Safety and Economic Development | City of St. Clairsville with support of Belmont County Transportation Improvement District | 64 KB
|
| | Butler | SR 4B 4.12/4.68 | Improve the safety, congestion and geometrics of this segment of SR4B by redesigning the SR129 interchange, improving geometrics and adding capacity. This project (Phase 5a PID# 83395 and Phase 5b PID# 86137) is part of an overall SR 4 Bypass Corridor pro | ODOT District 8 | 65 KB
|
| | Butler | Winton/S. Gilmore Road | The main objective of the HAM-CR239-9.49 project is to provide additional capacity on Winton/S. Gilmore Road from Smiley Road to Mack Road. Work will consist of widening to provide an additional through lane in each direction on Winton/Gilmore Road as wel | City of Fairfield | 46 KB
|
| | Champaign | Champaign County US Route 68 Project | Extending US Route 68 from Dallas Road north to State Route 55 in Champaign County. Construction will consist of four lanes, six foot treaded shoulders with eight foot graded shoulders and clear zone, constructed as a limited access highway... | Champaign County | 64 KB
|
| | Champaign | Route 68 Connecting Bypass Phase 1 | Construction of a LA 2-lane connector bypass | City of Urbana | 850 KB
|
| | Champaign | Route 68 Connecting ByPass Phase 2 | Construction of a LA 2-lane connector bypass | City of Urbana | 1000 KB
|
| | Clark | IR 70 | TRAC History: In 2002, the CLA-IR 70-06.75/25.11 project was programmed as a Major New project to address a lack of lane continuity on IR 70. Identified Major Rehabilitation projects within the corridor (CLA IR 70-13.95/20.92 and CLA-IR 70-20.92/25.11)... | ODOT District 7/ Clark County - Springfield TCC | 1289 KB
|
| | Clark | IR 70 | TRAC History: In 2002, the CLA-IR 70-06.75/25.11 project was programmed as a Major New project to address a lack of lane continuity on IR 70. Identified Major Rehabilitation projects within the corridor (CLA IR 70-13.95/20.92 and CLA-IR 70-20.92/25.11)... | ODOT District 7 | 1289 KB
|
| | Clark | IR 70 | TRAC History: In 2002, the CLA-IR 70-06.75/25.11 project was programmed as a Major New project to address a lack of lane continuity on IR 70. Identified Major Rehabilitation projects within the corridor (CLA IR 70-13.95/20.92 and CLA-IR 70-20.92/25.11)... | ODOT District 7 - Springfield TCC | 1316 KB
|
| | Clermont | SR 32 2.25 | Improve the safety, congestion and geometrics of the SR 32 corridor from Glen Este Withamsville Road to Old SR74 by eliminating at grade intersections and replacing with an interchange. | ODOT District 8 | 64 KB
|
| | Clermont | IR 275 8.95/8.90 Part 2 | Improve the safety, congestion and geometrics of the interchanges of IR275/SR32 and SR32/Eastgate Blvd by redesigning the interchanges as per the approved interchange modification study done under PID # 76289. This project is Phase 2 and 3 of the overall | ODOT District 8 | 66 KB
|
| | Clermont | IR 275 8.95/8.90 Part 3 | Improve the safety, congestion and geometrics of the interchanges of IR275/SR32 and SR32/Eastgate Blvd by redesigning the interchanges as per the approved interchange modification study done under PID # 76289. This project is Phase 2 and 3 of the overall | ODOT District 8 | 66 KB
|
| | Clermont | IR 275 8.95/8.90 | Improve the safety, congestion and geometrics of the interchanges of IR275/SR32 and SR32/Eastgate Blvd by redesigning the interchanges as per the approved interchange modification study done under PID # 76289. This project is a portion of Phase 2 of the o | ODOT District 8 | 66 KB
|
| | Columbiana | US 30 from SR 44 to SR 11 | ODOT’s currently programmed project is STA/COL-30-22.11/0.00, PID 10748. The long range goal of this project is to complete the US 30 corridor from East Canton to East Liverpool which would complete the corridor through Ohio. This corridor has already h | Columbiana County | 66 KB
|
| | Coshocton | State Route 16 | Reconstruction of State Route 16 as a four-lane interstate look-alike to complete the State Route 161/37/16/36 macro-corridor from Columbus to Interstate 77. | ODOT District 5 | 253 KB
|
| | Cuyahoga | CUY-42-0.90 | Upgrade and widen U.S.42 (Pearl Road) from approximately 1000 feet south of Drake Road to Shurmer Road (approximately 6200 feet). The project includes a new concrete pavement with curbs, and new 5’ walks on the east and west sides of Pearl Road. Drake R | City of Strongsville | 112 KB
|
| | Cuyahoga | IR-90 (CCG 4A) | Easterly Interceptor relocation | ODOT District 12 | 60 KB
|
| | Cuyahoga | IR-90 (CCG 4B) | Build a new overhead CSX Railroad bridge at a new location to accommodate the realignment of the Innerbelt Curve. This structure will replace the existing structure. | ODOT District 12 | 60 KB
|
| | Cuyahoga | IR-90 (CCG 4C) | Build a new overhead Norfolk Southern Railroad bridge at a new location to accommodate the realignment of the Innerbelt Curve. This structure will replace the existing structure. | ODOT District 12 | 60 KB
|
| | Cuyahoga | IR-90 (CCG 4D) | Reconstruction of four (4) overhead bridge structures near the Innerbelt Curve: Superior Avenue, St. Clair Avenue, Hamilton Avenue, and Lakeside Avenue. Work will include replacing existing structures with longer spans to accommodate future widening. | ODOT District 12 | 61 KB
|
| | Cuyahoga | IR-90 (CCG 4E) | I-90 realignment from Superior Ave. to E. 55th Street; Includes reconstruction of I-90/SR-2 Interchange. | ODOT District 12 | 61 KB
|
| | Cuyahoga | IR-90 (CCG 5A) | RECONSTRUCTION OF FOUR (4) OVERHEAD ARTERIAL ROADWAY BRIDGES ALONG THE INNERBELT CUT SECTION FROM PROSPECT AVE TO PAYNE AVENUE: PROSPECT AVE, EUCLID AVENUE, CHESTER AVENUE, & PAYNE AVENUE. WORK WILL INCLUDE REPLACING EXISTING STRUCTURES WITH LONGER SPANS | ODOT District 12 | 61 KB
|
| | Cuyahoga | IR-90 (CCG 5B) | I-90 EB in Innerbelt Trench from E. 22nd Street to Superior Avenue | ODOT District 12 | 61 KB
|
| | Cuyahoga | IR-90 (CCG 5C) | I-90 WB in Innerbelt Trench from E. 22nd Street to Superior Avenue | ODOT District 12 | 61 KB
|
| | Cuyahoga | IR-90 (CCG 6A) | WIDEN & REPLACE THE IR-77 BRIDGE OVER IR-490 IN CLEVELAND. INVOLVES REMOVING THE BOTTLENECK BETWEEN 2 6-LANE SECTIONS. | ODOT District 12 | 60 KB
|
| | Cuyahoga | IR-90 (CCG 6B) | Remove and build a new longer bridge for Broadway ( SR 14) over IR-77 and reconstruct Ramp J5 and Ramp J6 to provide standard lane widths and merge distances. The existing Broadway entrance ramp to IR 77 will be closed and a new Frontage Road will be cons | ODOT District 12 | 61 KB
|
| | Cuyahoga | IR-90 (CCG 7) | I-71 from SR-176 (Jennings Freeway) to I-90; Replace bridge decks and pavement including modifying SR-176 exit ramp. | ODOT District 12 | 60 KB
|
| | Cuyahoga | I-77 | Construct additional lane each direction on I-77 from the Ohio Turnpike interchange to SR-82. Work also to include existing pavement rehabilitation/replacement, lighting, signing, noise walls, and concrete barrier. | ODOT District 12 | 81 KB
|
| | Cuyahoga | Opportunity Corridor | New Multi- lane Corridor | ODOT - District 12/City of Cleveland | 60 KB
|
| | Cuyahoga | SR-87 (Chagrin Blvd.) | Widening of Chargrin Road (SR-87) to 4 lanes from I-271 to Avondale Ave. Project is the 1st phase of the overall project that will extend eastward to Lander Circle. Work will include construction of access roads along back lot lines as mainline road acc | Village of Woodmere | 161 KB
|
| | Cuyahoga | IR-271 | Construct additional lane each direction on I-271 from the I-271/I-480 (east) interchange split to I-271/I-480N interchange. Work also to include , lighting, signing, noise walls, and concrete barrier. | ODOT District 12 | 68 KB
|
| | Delaware | DEL SR 750 1.23 | The project involves the widening of SR 750 from 0.1 of a mile west of Wellington Blvd to Sawmill Parkway. TRAC funding is being requested for right of way and construction. | ODOT District 6 | 63 KB
|
| | Delaware | Veterans Parkway | Project includes the study, design and construction of a 3.9 mile limited access arterial bypass around the southeast quadrant of the City of Delaware. | City of Delaware, Ohio | 79 KB
|
| | Erie | US 250 | Intersection improvements at US 250 and Bogart Road, Park Place South, Hull, Strub & Perkins (both funded with ODOT HSP), Sycamore, US 6, Fun Drive and Crossings Road. Modify the US 250/ SR 2 Interchange by adding NB Right Lane at EB on ramp... | ODOT District 3 | 190 KB
|
| | Fairfield | Fai-33 | Converting an at-grade intersection to an interchange. | ODOT District 5 | 195 KB
|
| | Fairfield | Interstate 70 at SR 256 | Reconstruct the the State Route 256 Interchange and Taylor Road Off-ramp. | ODOT District 5 | 186 KB
|
| | Fairfield | Interstate 70 | Widen Interstate 70 to six lanes and reconstruct the associated interchanges to accommodate future traffic. | ODOT District 5 | 193 KB
|
| | Fayette | FAY 753 12.87 Extension | Extend SR 753 from US 22 to US 62 around the east side of Washington C.H. | ODOT/Fayette County Engineer (LPA) | 44 KB
|
| | Fayette | Central Ohio Logistics Center | Construct intermodal mega site that would include a potential major manufacturing tenant on a JRS of over 1,000 acres, a logistics/industrial park, and a cargo trans-loading facility. | Fayette County Commissioners Office | 76 KB
|
| | Franklin | FRA-71-0.00 | Reduce congestion and increase capacity on IR 71 South between the Pickaway/Franklin County Line to just south of Stringtown Rd. by widening from two to three lanes in each direction in conjunction with a pavement rehabilitation project. | ODOT District 6 | 186 KB
|
| | Franklin | FRA IR 270 South Outerbelt | Further develop the environmental and cost implications for the project(s) resulting from the I-270 South Outerbelt Study including the IR 270/US 23, IR 270/IR 71, and IR 71/Stringtown Rd interchanges and portions of IR 71 and IR 270 in southern Franklin... | ODOT District 6 | 186 KB
|
| | Franklin | I-71 - 6.09 (SR665 Interchange) | Reconstruction and improvement of the I-71 Interchange with SR665, including SR665 corridor improvements from the North Meadows Drive intersection on the east to the relocated Haughn Road access intersection on the west... | City of Grove City, Ohio | 219 KB
|
| | Franklin | FRA IR 70 Far East Freeway Study | Develop the environmental and cost implications for selected improvements resulting from the Far East Freeway Study. Specifically, US 33 at Petzinger Rd interchange, IR 70 at Hamilton Rd interchange, IR 70 at IR 270 and Brice Rd interchanges, and IR 70... | ODOT District 6 | 64 KB
|
| | Franklin | 315/70/71 reconstruction | Increase safety and reduce congestion on IR 70 between approximately Sullivant Avenue and the Norfolk Southern/CSX railroads, on IR 71 between Greenlawn Avenue and IR 70, and on SR 315 from IR 70 to Broad Street by modifying the IR 70/SR 315 interchange... | ODOT District 6 | 65 KB
|
| | Franklin | FRA IR 270 at Alum Creek Dr | Improve Alum Creek Drive/Groveport Road intersection and Alum Creek Drive/IR 270 interchange by providing turn lanes, bypass lanes, and roundabouts. The necessary improvements will be constructed in three phases. | ODOT District 6 | 46 KB
|
| | Franklin | FRA 270 South Widening | Reduce congestion and increase capacity on IR 270 South between approximately IR 71 and US 23 by widening from two to four lanes in each direction in conjunction with a pavement rehabilitation project. The widening is the implementation of part of the ... | ODOT District 6 | 65 KB
|
| | Franklin | North High Street (US 23) | Widens North High Street between Flint Rd. and Lazelle Rd. by 1 lane each direction, constructs sidewalk, shared-use path, improves drainage, and replaces traffic signals. The work limits for this project overlap the limits of ODOT’s FRA-23-22.23 Project... | City of Columbus | 65 KB
|
| | Franklin | I-270/US 33 Interchange Improvements Phase 1 | The I-270/US 33 interchange is a junction point on the National Highway System (NHS). The NHS is the centerpiece of the national effort to provide safe, modern and efficient transportation to the public and provides seamless linkages of transportation ... | City of Dublin | 110 KB
|
| | Fulton | Hallett Avenue (CR 1) | Construct grade separation structure to carry Hallett Avenue over the NS Railroad | Village of Swanton | 366 KB
|
| | Gallia | US 35 Rio Grande/Rodney Area | Preliminary Engineering Study will be conducted of a Highway Connector Project between eastern Lawrence County and Gallia County. | Gallia County Commissioners | 64 KB
|
| | Greene | US 35 | The elimination of the five (5) at-grade intersections between North Fairfield Road and the Xenia Bypass along US 35 in Greene County through the construction of new interchanges at Factory Road and Valley Road. | City of Beavercreek / Ohio Department of Transportation District 8 | 67 KB
|
| | Hamilton | Cincinnati Streetcar – Ph. 1 | The City of Cincinnati is sponsoring the development of a streetcar transit system, to serve as an urban circulator for downtown and adjoining neighborhoods. The City has identified streetcar transit as a potential tool for improving local circulation... | City of Cincinnati | 718 KB
|
| | Hamilton | Cincinnati Fourth Main Rail and Cincinnati Union Terminal | Conduct a feasibility study for adding a fourth main line to Norfolk Southern Railroad tracks serving downtown Cincinnati with the intent of easing rail freight congestion, and potentially facilitating future rail passenger service serving Cincinnati Union... | Port of Greater Cincinnati Development Authority | 279 KB
|
| | Hamilton | SR 32F 2.50/0.00 Part1 Eastern Corridor | These PID#’s have been split from the original PID# 22970. PID# 22970 was the Eastern Corridor in which a Tier 1 Final Environmental Impact Statement (FEIS) was completed and a Record of Decision (ROD) was obtained. The PID#’s listed on this application h | ODOT District 8 | 94 KB
|
| | Hamilton | Oasis Rail Corridor Part2 Eastern Corridor | These PID#’s have been split from the original PID# 22970. PID# 22970 was the Eastern Corridor in which a Tier 1 Final Environmental Impact Statement (FEIS) was completed and a Record of Decision (ROD) was obtained. The PID#’s listed on this application h | ODOT District 8 | 94 KB
|
| | Hamilton | SR 32F 0.00 Part3 Eastern Corridor | These PID#’s have been split from the original PID# 22970. PID# 22970 was the Eastern Corridor in which a Tier 1 Final Environmental Impact Statement (FEIS) was completed and a Record of Decision (ROD) was obtained. The PID#’s listed on this application h | ODOT District 8 | 94 KB
|
| | Hamilton | IR 75 16.23 | Improve the safety, congestion and geometrics at the interchange of IR75/IR275 by eliminating two loop ramps. | ODOT District 8 | 64 KB
|
| | Hamilton | Interstate 75 | Phase 8 of the Mill Creek Expressway Project. Project will widen I-75 for additional through lanes, rehabilitate existing pavement and bridges. Reconstruction of the SR 562/I-75 interchange to reduce congestion and improve safety is included in this phas | ODOT District 8 | 72 KB
|
| | Hamilton | IR 75 10.70 | Improve the safety, congestion and geometrics of this segment of IR75 by redesigning the interchanges, improving geometrics and adding one lane both northbound and southbound. | ODOT District 8 | 64 KB
|
| | Hamilton | Interstate 71 / 75 | Project will reconstruct the Ohio approaches to the Brent Spence Bridge connecting Cincinnati, Ohio to Covington, Kentucky. Work will include additional through lanes and the rehabilitatation of existing pavement and bridges. The project will reduce cong | ODOT District 8 | 72 KB
|
| | Henry | New Bridge from S.R. 110 to S.R. 424 | To design, permit, acquire right-of-way for, and construct a new river bridge. The new bridge will be a seven span bridge with an overall span of 1,125 feet with 625 feet of additional roadway to be installed. | Henry County Engineer | 198 KB
|
| | Hocking | SR664 | Realign approximately 0.6 miles of existing SR664, relocating 2Lane roadway to the north. | ODOT District 10 | 63 KB
|
| | Jefferson | New Ohio River Bridge | The current bridge system in the BHJMPO planning area has significant deficiencies. Addressing these deficiencies will require a reconfiguration of the entire system including construction of new bridge capacity and closing old facilities. One of these | BHJ Metropolitan Planning Commission | 85 KB
|
| | Jefferson | State Route 7 | Improve access to US22 (Veteran’s Memorial Ohio River Bridge) by rebuilding the intersection of SR7 & University Boulevard (SR822) as well as University Boulevard (SR822) with the US22 Interchange | ODOT District 11 | 65 KB
|
| | Lawrence | State Route 7 Chesapeake By-Pass Phase 2 of Tri-State Outerbelt (part of S.E. Ohio Plan) | Proposed is the completion of acquisition and construction of a 5.2 mile section 4 lane limited access highway known as Phase 2 of the Chesapeake By-Pass Project. Phase 2 begins at S.R. 7 mile marker 2.17 at the interchange for the 5th Street Ohio River B | ODOT District 9 | 506 KB
|
| | Licking | Interstate 70 | Reconfigure the 70/79 interchange while addressing Interstate 70 flooding. The project would also include widening the interstate to three lanes in each direction through the project area. | ODOT District 5 | 193 KB
|
| | Licking | SR 16 & Cherry Valley Rd | Replace at an at-grade intersection with an interchange on a multi-lane freeway. The project will include the following work elements: Closure of the existing right-in right-out intersections on the north and south sides of SR 16 and River Road;... | LCATS | 204 KB
|
| | Lorain | U.S. 20 / S.R. 113 | The project includes widening Center Ridge Rd. from three to five lanes, upgrading and synchronization of the existing traffic signals and addition of turn lanes where needed. It also includes the addition of a six-foot wide sidewalk and 10-foot wide multi-use path. | City of North Ridgeville | 191 KB
|
| | Lorain | SR 57 | Modify the existing I-90 Interchange to a Diamond Interchange with traffic signals at the ramp intersections. Remove the 49th Street Bridge SR 57 Overpass, and the ramps to Griswold Road and Midway Mall Boulevard. | ODOT District 3 | 189 KB
|
| | Lorain | SR 58 | Construct a Railroad Grade Separation SR 58 underpass in the Village of Wellington | ODOT District 3 | 190 KB
|
| | Lorain | LOR-90-22.26 | Construct a three quadrant diamond interchange with the Eastbound entrance ramp designed as a loop ramp at I-90 and Nagel Road. Due to its proximity to the interchange, improvements required at the Nagel Road and Chester Road intersection are considered... | City of Avon | 202 KB
|
| | Lucas | IR 75 | Add lane in each direction, upgrade existing interchanges as necessary. | ODOT District 2 | 184 KB
|
| | Lucas | IR 475 | Upgrade the IR475/US20 Interchange to correct horizontal and geometric deficiencies, improve capacity, reduce congestion, and address accident issues. | ODOT District 2 | 189 KB
|
| | Lucas | IR 475 | Upgrade the IR475/US23 Systems Interchange to correct horizontal and geometric deficiencies, including left merges and lack of lane continuity, improve capacity, reduce congestion, and address accident issues. | ODOT District 2 | 185 KB
|
| | Lucas | IR 75 | Upgrade IR 75 in the downtown Toledo area by reconstructing existing deficient interchanges and adding lanes to provide three lanes in each direction. Project is located in the Anthony Wayne Trail (SR 25) and Washington St./Monroe St. area. | ODOT District 2 | 189 KB
|
| | Lucas | IR 75 | This project is Part 2 of the IR75/IR475 systems interchange upgrading project. The project involves adding lanes in the systems interchange and to the mainline. Thirteen bridges will either be replaced or modified to accommodate the project. | ODOT District 2 | 186 KB
|
| | Madison | MAD-70-10.27 | Upgrade interchange of IR 70 and SR 29 by constructing roundabouts at the ramp terminals, widening SR 29 and constructing a roundabout at the SR 29/Commerce Parkway intersection. | ODOT District 6 | 45 KB
|
| | Mahoning | IR-80 | Add a third lane to the IR-80 mainline from IR-680 to SR-193. Bring geometry at the US-422 and SR-193 interchanges up to current standards. The project will change ramp locations and configurations at the IR-80 at SR-46 / IR-680 / SR-11 interchange area. | ODOT District 4 | 300 KB
|
| | Medina | US 42 | Widen US 42 to five lanes plus improvements to the intersections of Harding Street, Forest Meadows Street, Northland Drive, Reagan Parkway and Hillview Way in the City of Medina; and Ledgewood Drive, Grand Boulevard, Stonegate Drive and Fenn Road... | ODOT District 3 | 188 KB
|
| | Medina | Wadsworth SR94 (High Street) Corridor Safety Improvements & Interchange Modifications at SR94 and I-76 | Improvements include 2 phases of work to address the identified deficiencies in the corridor. The first would be widening State Route 94 (High Street) for a 2-way left turn only lane, additional turn lanes and turn lane storage lengths... | City of Wadsworth | 190 KB
|
| | Miami | Interstate 75 (CR 15 to CR25-A) Phase 2 | The Project will rehabilitate and widen Interstate 75 from four lanes to six lanes in between CR 15 (Piqua-Troy Road) to Country Road 25-A. | City of Piqua | 157 KB
|
| | Miami | Interstate 75 (1.13 mi north of SR 41 to CR 15) Phase 1 | The Project will rehabilitate and widen Interstate 75 from four lanes to six lanes in between SR 41 to CR 15 (Piqua-Troy Road)... | City of Piqua | 128 KB
|
| | Montgomery | US 35 | The following is contained in the Minor Project P.E. Study by E.L. Robinson dated November 2008 (Pages 4-5): The project starts at straight line mileage (SLM) 18.57, about 2.56 miles west of the border of Montgomery County and Greene County, passes thro... | ODOT District 7 | 509 KB
|
| | Montgomery | IR-75 Section 6.14 to 7.12 | This project will reconstruct Exit 47 on I-75 to provide the four missing access movements which were not completed when I-75 was originally constructed in the early 1960’s.The movements are: 1) an entrance to north bound I-75 from west bound Central Ave... | Cities of West Carrollton, Moraine, Kettering, Montgomery County Board of Commissioners | 169 KB
|
| | Montgomery | MOUND ACCESS PROJECT | Widen Miamisburg-Springboro and Benner Roads from 2 to 3 lanes | MONTGOMERY COUNTY ENGINEERS | 69 KB
|
| | Morrow | DEL/MRW-71-1150/0.00 | Reduce congestion and increase capacity on IR 71 between approximately Galena Rd in Delaware County and the Morrow/Richland County Line by widening from two to three lanes in each direction in conjunction with pavement rehabilitation projects... | ODOT District 6 | 65 KB
|
| | Muskingum | Mus-93/22 Connector | The project will construct a two-lane controlled access facility on four-lane r/w on new location. The new roadway will begin at the existing intersection of SR 93/US 22 and extend north to connect near the US 40/IR 70 interchange. | Muskingum County Port Authority | 202 KB
|
| | Pickaway | Pickaway East-West Connector | The Pickaway East-West Connector (“Connector”) is a proposed four-lane roadway stretching roughly three to four miles from the southern end of Rickenbacker Airport in the vicinity of the Norfolk Southern Rickenbacker Intermodal Terminal (“Intermodal”) to US 23. | Pickaway County Engineer | 284 KB
|
| | Putnam | Co. Rd. 5 | To widen and resurface 11.2 miles of County Road 5 from State Route 12 in Pandora to County using Non-Freeway Resurfacing, Restoration and Rehabilitation (3R) Improvement Criteria. | Putnam County Engineer’s Office | 216 KB
|
| | Putnam | VLRR – Village Leipsic Railroad | Extend existing Village of Leipsic Railroad (VLRR) track #2 and #3 north of SR65. This includes approximately 4,500 t.f. of rail, subballast and ballast, drainage and road crossing with modifications to existing signal. | Village of Leipsic | 206 KB
|
| | Scioto | SCI-823-Phase 1 Portsmouth Bypass | As part of the Appalachian Development Highway system, it is proposed to construct a new 4-lane limited access highway/bypass of Portsmouth, Ohio. Phase 1 shall be constructed from the TR 234 (Shumway Hollow Rd.) Interchange, near the Scioto County Airpo | ODOT District 9 | 293 KB
|
| | Scioto | SCI-823-Phase 2 Portsmouth Bypass | As part of the Appalachian Development Highway system, it is proposed to construct a new 4-lane limited access highway/bypass of Portsmouth, Ohio. Phase 2 shall be constructed from CR28 (Lucasville-Minford Rd.) to US 23 at Lucasville. This phase is 6.65 | ODOT District 9 | 488 KB
|
| | Scioto | SCI-823-Phase 3 Portsmouth Bypass | As part of the Appalachian Development Highway system, it is proposed to construct a new 4-lane limited access highway/bypass of Portsmouth, Ohio. Phase 3 shall be constructed from US 52 to the TR 234 (Shumway Hollow Rd.) Interchange, near the Scioto Cou | ODOT District 9 | 489 KB
|
| | Seneca | Jones Road (CR 592) | Construct grade separation structure to carry Jones Road over the CSX-T Railroad | City of Fostoria | 1545 KB
|
| | Stark | US 30 (STA-30-18.35) | STA-30-18.35: Relocation of US 30 on a new alignment from Trump Avenue to SR 44 | Ohio Department of Transportation/City of Canton | 213 KB
|
| | Statewide | Rail | 3C Start Up Service | Ohio Rail Development Commission | 44 KB
|
| | Summit | IR-76 | PID# 77262 - This project would modify the interchange at IR-76 and SR-21. PID# 77263-This project includes adding a third lane on IR-76 between SR-21 and Barber Road, while replacing pavement on IR-76 between Medina County line and SR-21 & PID# 77268... | ODOT District 4 | 186 KB
|
| | Summit | SUM – IR76 / 77 | This project will reconstruct the section of IR-76/77 from West of SR-59 through the SR-8 / IR-77 Central Interchange. The project will change the access points and geometry of the Dart, Main/Broadway, and Wolf Ledges/Grant interchanges to improve safety... | ODOT District 4 | 280 KB
|
| | Summit | IR-76 | PID#77264 - This project will reconstruct the section of IR-76 from Battles Avenue interchange through the IR-77 interchange to just West of the SR-59 interchange. The project will change the geometry and increase the capacity of ramps at IR-77 interchange... | ODOT District 4 | 282 KB
|
| | Tuscarawas | TUS-250-5.03 | Upgrade the existing IR 77/US 250 interchange near Strasburg. The project will include pavement widening of US 250, ramp widening, signal installation at 4 intersections, and the replacement of the US 250 bridge over Sugar Creek. The Strasburg intercha | ODOT District 11 | 68 KB
|
| | Warren | I-71 Western Row Road Interchange | Complete an existing partial interchange by adding a new southbound exit ramp and northbound entrance ramp. | Warren County | 63 KB
|
| | Warren | HAM/WAR 71 | Construct new additional northbound exit ramp at Fields-Ertel/Mason-Montgomery Interchange. | Warren County | 65 KB
|
| | Wood | I-475 & SR 25 Interchange | Interchange modification to improve safety and traffic flow. Modification is expected to include lane additions to the ramps, possible reconfiguration of the interchange, lane additions to mainline SR 25 and possible improvements on mainline I-475 | City of Perrysburg | 194 KB
|
| | Wood | IR 75 | Add lane in each direction, upgrade existing interchanges as necessary. | ODOT District 2 | 186 KB
|
| | Wood | State Route 18 | Conduct the ODOT Project Development Process (PDP) to determine a location, perform environmental studies, develop detail design plans, acquire needed right of way, and construct a relocated SR 18. | ODOT District 2 | 188 KB
|