Interstate 275 Repaving and Bridge Work Project
Update
Hamilton County (Friday, November 22, 2019) - The
following restrictions will be in place as part of the Interstate 275 repaving
and bridge work project:
Friday, November 22 - Double-lane closure (left lanes) of I-275
West between Four Mile Road and the Kentucky side of the Combs Hehl
Bridge; ramp closure from I-275 West to Kellogg Avenue (Exit 72); ramp closure
from southbound Kellogg Avenue to I-275 West to Kentucky from midnight Friday
until 6 a.m. Saturday, November 23.
Saturday, November 23 through Sunday, November 24 - Single-lane closure (right lane) of I-275 West between
Four Mile Road and the Kentucky side of the Combs Hehl Bridge from midnight
Saturday until 6 p.m. Sunday.
Saturday, November 23 through Sunday, November 24 - Closure of the contraflow lane from 7 a.m. Saturday until 6
p.m. Sunday.
Monday, November 25 - Single-lane closure (left lane) of I-275 West between
Four Mile Road and the Kentucky side of the Combs Hehl Bridge from 9 a.m. until
2 p.m.
The following restrictions
remain in place for trucks:
- 10’ wide
- 75’ overall length
- Weight restriction of 120,000 lbs.
Arrow boards and/or signs will alert
motorists of the work zone and restrictions, and all work is contingent upon
the weather.
To help ensure the safety of the
construction workers as well as the traveling public, motorists should remain
alert, reduce their speed and watch for stopped traffic while passing through
the work zone.
For more information about the project,
visit this link,
and for ongoing traffic, construction and weather-related information, please
visit www.OHGO.com.