4/28/2016
  
102065
Mill Creek Metroparks
Mark Fisher, PE
1-330-702-3010
This project consists of improving 0.374 miles of Memorial Hill Drive by planing the existing asphalt pavement and placing asphalt concrete leveling and intermediate courses, placing a polymer asphalt surface course and pavement markings, and performing related items of work as further described in these plans and specifications.
4/28/2016
  
101910
Erie County
Matt Rogers, PE, Erie County Engineer's Office
1-419-627-7710
Asphalt concrete planing and resurfacing, full-depth pavement repairs, and guardrail replacement of local road approaches to Ohio Turnpike bridge structures.
4/27/2016
  
99805
Trumbull County Engineer
Gary Shaffer
1-330-675-2253
The replacement of four diesel engine trucks with four CNG powered trucks.
4/21/2016
  
98701
Village of Boston Heights
Chad M Lewis, PE
1-330-913-1054
Resurfacing of 3” of asphalt with 20% of pavement repair from the Southern Corp Limit to SR 303 (0.41 mile).
4/21/2016
  
97939
City of Shelby
Joe Gies
1-419-342-3600
The project consists of improving 1.04 miles of Mansfield Avenue (SR-39) from Main Street to Seneca Drive by asphalt pavement rehabilitation, curb and sidewalk replacement, drainage structure upgrades, and three signalized intersection reconstructions. The project also includes improvement of 1.16 miles of Mansfield Avenue from Seneca Drive to Taylortown Road by asphalt pavement rehabilitation.
4/20/2016
  
98614
Trumbull County Engineer
Gary Shaffer
1-330-675-2253
Replacement of 7 guardrail locations and 7 cross culverts,
and ditch cleanout for a length of 2.764 miles along
Ravenna Warren Rd.
4/18/2016
  
99418
City of Springfield
Leo Shanayda, City Engineer
1-937-324-7310
Improve and increase the accessibility for cyclists, by adding bike racks throughout the city.
4/12/2016
  
89127
Mercer County
James A Wiechart
1-419-586-7759
Bridge rehabilitation and associated approach work.
4/12/2016
  
95515
Metropolitan Park District of the Toledo Area
Jon Zvanovec
1-419-360-9184
Development of an urban multi-use hike and bike trail.
4/6/2016
  
97855
Summit County Metro Parks
Charles Hauber, PE, PS
1-330-865-8040 ext. 206
The purpose of this project is to construct a 10 foot wide asphalt paved bikeway within the right-of-way owned by metro regional transit authority along this railroad corridor.  The project length is 1.8 miles, extending from Eastwood Avenue to Mill Street in Akron, Ohio.
4/5/2016
  
97572
Knox County
Jim Henry
1-7440-397-1590
Resurfacing and related.
4/4/2016
  
98613
Canfield Township
Keith Rogers, Township Administrator
1-330-533-4239
Removal and replacement of the existing storm sewer and channel reconstruction on Pebble Beach Drive in Canfield Township.
4/4/2016
  
101477
City of Streetsboro
Joseph Ciuni, PE, PS
1-216-927-8655
Resurfacing of Hudson-Aurora Road from the Streetsboro Corp. line to the I-480 ramp.
3/30/2016
  
99336
City of Huron
Frances R Rourke, PE
1-614-474-1103
Roadway widening on US 6 to accommodate a right turn lane and two left turn lanes to improve access to Fabens Park.
3/30/2016
  
90670
City of Perrysburg, Ohio
Doug Dariano, PE City Engineer
1-419-872-7880
Construction of a single lane modern roundabout with related drainage, sidewalk, sidepath and traffic control work.
3/29/2016
  
96388
City of Urbana
Tyler Bumbalough
1-937-652-4324
Installation of two new sidewalk sections: approximately 1,000’ on Boyce Street and 750’ on Madison Avenue. Also install ADA compliant curb ramps and thermoplastic pavement striping for crosswalks.
3/24/2016
  
93960
City of Toledo
Tim Grosjean
1-419-245-1344
Resurfacing of 4.3 miles of Detroit Avenue.
3/23/2016
  
84859
Columbiana County
Mary Browne, PE
1-330-424-1459
This project involves the replacement of the existing steel beam bridge with a precast arch top culvert with wingwalls. It also includes minor paving, pavement markings, guardrail and signing.
3/22/2016
  
93983
Scioto County Engineer
Craig J Opperman, PE, PS
1-740-259-5541
It is proposed to replace the structure on TR 99, Mackletree Road, at the 4.81 mile marker 0.29 miles from where it ends and intersects with SR 125.
3/22/2016
  
99811
Delaware County Engineer
Brian Dilley, Deputy Construction Engineer
1-740-833-2430
Resurfacing South Old 3C Highway including construction of paved shoulders or bicycle lanes and replacement of deficient guardrail and signs.  Total project length = 2.26 miles.
3/22/2016
  
99227
Clinton County Engineer
Adam J Fricke, PE, PS, County Engineer's Office
1-937-382-2078
This project consists the improvement of 14.212 miles of various county roads in Clinton County by planning 1” of existing surface, placing ¾” of Item 441 asphalt concrete intermediate course, 1-1/4” of Item 441 asphalt concrete surface course, and installing raised pavement markers (centerline) as well as Item 648 spray thermoplastic pavement markings (centerline and edgeline). 
3/22/2016
  
94795
City of Springfield
Leo Shanayda, City Engineer
1-937-324-7310
Shave and pave roadway.  ADA intersection improvements.
3/11/2016
  
98763
Hamilton County Engineer
Eric Beck
1-513-946-8432
Installation of a traffic signal and fiber optic interconnect system along various in Sycamore Township, Hamilton County, Ohio.
3/11/2016
  
95399
Clinton County Engineer
Adam J Fricke, PS PE County Engineer's Office
1-937-382-2078
This project consists of removing two crest hills to provide additional sight distance for the intersection of CLI-CR-15 (Gurneyville Rd) and CLI-CR-66 /TR-193 (North Curry Rd) in Union Township of Clinton County, Ohio.  Associated improvements include reconstruction of approximately 2125 LF of Gurneyville Rd. and  reconstruction of approximately 460 LF of North Curry Road.
3/10/2016
  
95677
City of Toledo
Tim Grosjean
1-419-245-1344
Reconstruction of 0.14 miles of Indiana Avenue.
3/10/2016
  
97022
Village of Butler
Kenneth Kinley, Mayor
1-419-883-2481
Installation of sidewalks, curb and gutter, and storm sewers along Wilson Avenue and Morgan Street.
3/9/2016
  
97163
Stark County Engineer
David R Torrence, PE, PS
1-330-477-6781
Resurfacing (mill & fill) of approx. 2.2 mi. of Portage Street between Lorraine Avenue and Frank Avenue, including pavement markings.  Signal upgrade at Lake O’ Springs Avenue N.W.
3/9/2016
  
100741
City of Youngstown
Charles T Shasho
1-330-742-8800
Resurfacing South Avenue between Williamson Avenue and Midlothian Blvd. (1.78 miles) including new curb ramps, pavement markings, and traffic signs.
3/9/2016
  
94184
City of Norwalk
Joshua Snyder, PE
1-419-663-6735
Intersection widening with signal upgrades and drainage improvements.
3/9/2016
  
88528
Summit County Engineer
Joe Paradise, PE
1-330-643-8105
The project primarily involves upgrading traffic signals along a two mile stretch of South Arlington Road form Chenoweth Road to Bruce Road.  To address mobility throughout the Arlington Road corridor, this project will install sidewalks, add a left turn lane for northbound Arlington Road from Chenoweth Road to Bruce Road.  New pavement markings and utility relocations will be part of this project.
3/1/2016
  
86562
City of Massillon
Keith Dylewski, PE
1-330-830-1722
Main project components consist of items such as partial and full depth pavement repairs, grinding of existing asphalt surface, 1 1/2" 441 asphalt concrete surface course, curb ramp installation, catch basin replacement, pavement markings.
3/1/2016
  
82553
Clermont County Engineer's Office
Doug Royer
1-513-732-8885
This project consists of the reconstruction and realignment of 1.2 miles of Aicholtz Road to a two and three lane section with curbed shoulders and sidewalk.  The horizontal and vertical alignments will be improved to satisfy a 35 mph design speed.  A storm system will be installed and culverts will be replaced.  This project will connect the existing East and West legs of Aicholtz Road with a new alignment running under the I-275 bridges constructed with the CLE-275-10.15 project.
3/1/2016
  
93233
City of Dayton
Andrew Marks
1-937-333-3857
This project consists of the installation of asphalt bike paths in both Cleveland Park and Highland Park.
2/29/2016
  
97160
Stark County Engineer
David R Torrence, PE, PS
1-330-477-6781
The project includes the installation of bridge terminal assemblies at various bridges, along with the replacement of the bridge approach guardrail.  It also includes the removal of deteriorated concrete post and panel bridge railing, and replacement with deep beam bridge railing, at several bridges.
2/29/2016
  
98845
City of Port Clinton
Walter Wehenkel
1-419-734-5522
CONSTRUCT A NEW SIDEWALK ALONG THE SOUTH SIDE OF SR-163 (WEST LAKESHORE DR) IN THE CITY OF PORT CLINTON.
2/26/2016
  
90972
City of Canal Fulton
Mark Cozy, City Manager
1-330-854-2225, ext. 119
Improvements including the widening of the intersection of Cherry Street (SR93) and Locust Street (CR228) that includes additional turn lane capacity, improved turning radii, new traffic signals, pavement, storm sewer and waterline reconstruction.
2/26/2016
  
86562
City of Massillon
Keith Dylewski, PE
1-330-830-1722
Main project components consist of items such as partial and full depth pavement repair; grinding of existing asphalt surface; 1 1/2" 441 asphalt concrete surface course; curb ramp installations; catch basin replacement; pavement markings.
2/26/2016
  
81174
Cutler County TID, City of Hamilton
David L Spinney
1-513-785-3452
The South Hamilton Railroad Grade Separation Project (South
Hamilton Crossing or SHX) replaces an existing at-grade railroad crossing on Central Avenue with an overpass created by extending Grand Boulevard to the west to University Blvd. Due to the increase in elevation, East Ave and Pleasant Ave. that run parallel to the railroad must be relocated and elevated The project length is approximately 7,360 feet, which includes 2,709 feet on Grand Blvd., 1,640 feet on Pleasant Ave. (US 127), 1,350 feet on East Ave./Dixie Hwy., 972 feet on University Blvd., 396 feet on Sipple Ave. and 292 feet on a new alley between 11th St. and 12th St.
2/22/2016
  
99574
Mahoning County Engineer
Mike Stipetich
1-330-799-1581
This improvement shall consist of milling, resurfacing, pavement markings, and traffic signal loop replacement as set forth in the plans and estimates.  The length of the project is approximately 12,763 feet (2.42 miles; 4 lanes) on Baily Road between Mahoning Avenue and the Mahoning County/Trumbull County corporation line.
2/22/2016
  
98671
Mercer County
James A Wiechart
1-419-586-7759
3.07 miles of roadway resurfacing with minor widening and roadside improvements
2/22/2016
  
98970
Trumbull County Engineer
Gary Shaffer
1-330-675-2253
Construction of approximately 7,438 feet of 5’ wide
sidewalk and drive approaches in sections along North
River Road on both the north and south sides. Project
begins at SR46 North River intersection and heads west.
Work includes installation of pipe to accommodate new
walk.
2/22/2016
  
95315
City of Beavercreek
Jeff Moorman, PE
1-937-427-5513
This project involves traffic signal upgrades at various intersections along the N Fairfield Road and Indian Ripple Road corridors, as well as, the reconstruction of two existing traffic signal installations.
2/22/2016
  
98872
City of Niles
Neil Buccino, Service Director
1-330-544-900
Milling, resurfacing , ADA curb ramps, pavement
markings, and traffic signal loop replacement on Niles
Vienna Rd and Warren Ave in the City of Niles.
2/22/2016
  
93014
City of Zanesville
Chip Saunders
1-740-455-0601
Replacement of deficient bridge over Joes Run.
2/17/2016
  
75436
City of Akron
Michael Teodecki, PE
1-330-375-2336
This project re-routing and re-purposing of the Akron Innerbelt (SR 59) as a grade separated limited access facility into adjacent surface arterial streets.  The Akron Innerbelt project study area is located on the west side of the downtown Akron, Summit County, Ohio.  Roadway features within the project area include the Innerbelt infrastructure and portions of Rand Street, Dart Avenue and Locust Street.
2/17/2016
  
88990
City of Akron
Christine Jonke, PE
1-330-375-2015
This project consist of 3.00 miles of roadway and signal improvements along East/West Exchange Street and East/West Cedar Street.  Improvements include a road diet of 1.71 miles of pavement with resurfacing on East/West Exchange Street between South Portage Path and Arc Drive and 1.29 miles of resurfacing on East/West Cedar Street between West Exchange Street and South Broadway Street.  Other improvements along the entire 3.00 miles include replacing 21 signals, installing curb bump outs to create dedicated on street parking and bike lanes, replacing storm and sanitary sewers and manholes, and replace curb ramps and light fixtures.
2/17/2016
  
88009
County of Summit Engineer's Office
Joe Paradise, PE
1-330-643-8105
The proposed work consists of placing a new superstructure on the re-worked existing abutments, removal of the existing pier, reconstruction of 0.04 miles of Bank St. with new curbs, sidewalks, drainage, water mains, traffic control devices and pavement markings.
2/17/2016
  
91536
Hamilton County Engineer's Office
Eric Beck
1-513-946-8432
Improvement od Pippin Road - Phase 2 from approximately Compton Road to approximately Springdale Road.
2/12/2016
  
95120
Warren County Transportation Improvement Daniel J Corey, PE, PS Dan.Corey@co.warren.oh.us 1-513-431-1229
Relocation of Columbia Road to the east of its current location and the upgrade and realignment of Western Row Road East of I-71 through the first bend to the east, with capacity improvements at the intersection with the existing ramps and Kings Island Drive.
2/12/2016
  
88968
City of Akron Christine Jonke, PE CJonke@akronohio.gov 1-330-375-2015
Signal upgrade and coordination, including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection and emergency pre-emption on Copley Rd. from IR77 southbound ramps to Rhodes Avenue in the City of Akron.
2/12/2016
  
93432
City of Akron Christine Jonke, PE CJonke@akronohio.gov 1-330-375-2015
Signal upgrade and coordination, including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection and emergency pre-emption on Brittain Rd. from East Market Street to Eastwood Avenue in the City of Akron.
2/12/2016
  
93439
City of Akron Christine Jonke CJonke@akronohio.gov 1-330-375-2015
Signal upgrade and coordination, including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection and emergency pre-emption on Tallmadge Avenue from Home Avenue to Brittain Road in the City of Akron.
2/12/2016
  
93435
City of Akron Christine Jonke CJonke@akronohio.gov 1-330-375-2015
Signal upgrade and coordination, including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection and emergency pre-emption on SR 18 (Market Street) from Summit Street to Portage Path in the City of Akron.
2/12/2016
  
95675
City of Bowling Green, Ohio Jason Sisco, PE, PS, City Engineer JSisco@bgohio.org 1-419-354-6227
Realign Gypsy Lane Road, construct a westbound left turn lane, extend the northbound left turn lane and replace the existing traffic signal, sidewalks and curb ramps.
2/11/2016
  
95674
City of Toledo Tim Grosjean tim.grosjean@toledo.oh.gov 1-419-245-1344
Reconstruction and widening of Douglas Road from Sylvania Ave to 600' north of Laskey.
2/11/2016
  
99051
City of Akron Christine Jonke, PE CJonke@akronohio.gov 1-330-375-2015
The work within the limits of this project includes the construction of a new roadway 0.28 miles of White Pond Parkway from White Pond Drive to the cul-de-sac. The project includes new pavement, sidewalk, curbs, bioswale, storm sewer, watermain, sanitary sewer, drainage structures traffic control signs and pavement markings, lighting and other related items.
2/10/2016
  
83541
Pickaway County Engineer Anthony Neff, PE, PS aneff@pickawayengineer.org 1-740-474-3360
Improvement of 0.54 miles of CR 22 (Scioto Darby Road) by replacing the existing two span pratt through truss over Big Darby Creek including reconstruction of the approach roadway, grading and drainage.
2/9/2016
  
97709
Knox County Jim Henry, County Engineer jhenry@rrohio.com 1-740-397-1590
Replacement and installation of new guardrail on various Knox County roads.
2/9/2016
  
98978
Ottawa County Craig Miller Cmiller@co.ottawa.oh.us 1-419-734-6777
Resurfacing 3 miles of Elmore Eastern Road, CR-6, from the Village of Elmore East Corporation line (Schultz-Portage Road) to SR-590. Extensive base repairs will also be included along the edges of the roadway.
2/5/2016
  
94265
City of Lebanon
Darren D Owens, PE, PS - City Engineer
1-513-228-3133
Pavement base repairs if required, milling and resurfacing, replacement of raised pavement markers and traffic signal loops and re-placement of pavement markings along By-Pass 48 for approximately 4.6 lane miles of pavement with an approximate area of 73,000 SY.  This project will also require quantity separation between the City of Lebanon and the Ohio Department of Transportation.
2/1/2016
  
95514
Columbiana County
Mary Browne
1-330-424-1429 ext. 290
Rehabilitation of McClellan Covered Bridge and paving of
approximately 400 feet of road to bridge and culvert replacement.
1/28/2016
  
93918
City of Toledo
Tim Grosjean
1-419-245-1344
Resurfacing of 1.76 miles of Central Avenue.
1/27/2016
  
94288
Butler County Engineer's Office
Dale Steward
1-513-785-4143
Project involves the widening of two lane section of Liberty Fairfield Road to three lanes. This will consist of one lane in either direction along with a two-way left turn lane. The project begins at Millikin Road continuing north approximately 2850 lineal feet to Randall Drive. The project will include the replacement of an existing box culvert and drainage improvements along both sides of the proposed roadway, and installation of a new 12” water main.
1/27/2016
  
90812
City of Kettering
Irina Titova-Spang, PE, PTOE
1-937-296-2436
This project involves the upgrade of the City of Kettering traffic system central software and hardware including traffic signal controllers, other cabinet equipment, retro-fitting the cabinets with UPS, replacing surveillance cameras and installing camera lowering divides, school zone signs, bringing curb ramps to ADA compliance, installation of fiber optic redundant links.
 
1/27/2016
  
98672
Mercer County
James A Wiechart
1-419-586-7759
1.450 Miles of roadway resurfacing with minor widening and
roadside improvements.
1/27/2016
  
93820
City of Hudson
Thomas Sheridan, PE, PS
1-330-342-1770
Resurfacing of State Route 91 (North Main) in the City of Hudson, from State Route 303 to Clinton/Aurora Streets. Includes partial and full depth repairs, curbs, signal upgrade.
1/27/2016
  
96339
Hamilton County Engineer's Office
Eric Beck, PE
1-513-946-8432
Construction of new sidewalk along the east side of Wolfangel Road between Bowen Avenue and State Road in Anderson Township, Hamilton County, Ohio.
1/27/2016
  
98796
Greene County
Luke Trubee
1-937-562-7533
Restoring the Ballard Road covered bridge to as close to original condition as possible.
1/26/2016
  
100017
Perkins Township
Matt Rogers, PE, Erie County Engineer's Office
1-419-627-7710
Construction of 5' wide concrete sidewalk on the west side of Didion Drive.
1/25/2016
  
98713
Ottawa County
James P Moore, PE
1-419-734-6777
Embankment slope failure mitigation for CR - 18 overpass at the Ohio Turnpike.
1/22/2016
  
90793
City of Dayton
Brian Zamostny
1-937-333-3844
Reconstruction of Keowee Street from Helena Street to Stanley Avenue and resurfacing of Keowee Street from Stanley Avenue to the Great Miami River.
1/22/2016
  
95847
City of Kettering
Chad Ingle, PE, PS
1-937-296-2436
The project involves the construction of a 10' wide concrete
sidewalk and asphalt resurfacing from Shroyer Road to
East Dorothy Lane.
1/15/2016
  
94913
City of Columbus
Jud Hines
1-614-645-1512
This project includes improvements to the intersection of Georgesville Road at Holt Road/Automall Drive and to the Holt Road corridor from Georgesville Road to Georgesville Square South/Holt Run Drive. The primary purpose of the project is to improve safety at the Georgesville Road at Holt Road and Georgesville Square North at Holt Road intersections. The project will improve capacity of the intersections and the Holt Road corridor and will address deficiencies in the pedestrian and bikeway system.
1/15/2016
  
93530
Clermont County Engineer's Office
Doug Royer
1-513-732-8885
The proposed project consists of constructing sidewalks, striped crosswalks and signage for on-site and off-site improvements to connect the existing schools Clough Pike Elementary School and Summerside Elementary School with the surrounding areas.
1/12/2016
  
95324
City of Kettering
Chad Ingle, PE, PS
1-937-296-2436
The project involves the construction of a 8-10 foot wide multipurpose path beginning at the intersection of Wilmington Pike and Farrington Drive to the intersection of Smithville Road and Forrer Blvd along the east side of Wilmington Road and Smithville Road.
1/12/2016
  
City of Middletown
Rob Nicolls
1-513-425-7710
Project Description Total reconstruction, realignment, and widening of approximately 1.84 miles of Oxford State Rd. from Yankee Rd. to Spurlino Way.  Additionally project includes proposed curb & gutter, storm sewer system, water main, and traffic signals.  Associated improvements include the addition and/or modification of pavement markings and signage.
1/12/2016
  
90755
Butler County Engineer's Office
Dale Steward
1-513-785-4143
Replacement of the existing deficient structure carrying Bonham
Road over Four Mile Creek, including approach reconstruction and the construction of a multi-use path.
1/5/2016
  
93239
City of Dayton
Ruth Bickel
1-937-333-4126
Construction of a multi-use path from Cosler Drive to the Creekside Trail, in the Eastern Hills neighborhood.
1/5/2016
  
90789
City of Dayton
Joseph Weinel
1-937-333-4218
Construction of a bike path along the East Side of North Keowee Street from Webster Street to Helena Street.
1/5/2016
  
93441
City of Ravenna
Robert Finney, PE, City Engineer
1-330-296-5666
Signal coordination. Including fiber optic interconnect, new signal heads, pedestrian signals, ADA pushbuttons, video detection, emergency pre-emption. On various streets in the City of Ravenna.
1/5/2016
  
98878
City of Niles
Neil Bucino or Kevin Robertson
1-330-544-9000 (Niles)
Upgrading 0.30 miles of SR169 (Main St) with installation
of lamp post lighting along both sides of Main St. from
Robbins Ave. to East Federal
1/5/2016
  
97154
Stark County Engineer
Beth Iacano, PE
1-330-477-6781
A pavement resurfacing project on CR 228 (Portage Street) involving planing and repaving for a distance of 1.2 miles, access management improvements at two locations, and pedestrian ramp additions and improvements at various locations along the project corridor.
1/5/2016
  
99594
Howland Township (Acting through Trumbull County Engineer)
Gary Shaffer
1-330-675-2253
The improvement of 0.384 miles of TH652 (Commonwealth Ave) by clearing/grubbing, linear grading of ditches, ditch closure and resurfacing.
1/4/2016
  
92552
City of Fairfield
Ben Mann, PE, City Engineer City of Fairfield
1-513-867-4213
Widen westbound Holden Boulevard by one lane to provide a left turn lane, two through lanes, and a right turn lane. Widen eastbound South Gilmore Road to receive two through lanes from Holden Boulevard. Restripe northbound SR-4 to provide dual left turn lanes onto South Gilmore Road. Extend the eastbound South Gilmore Road left turn lane to just west of Parkland Hills Drive. Provide a short left turn lane at Parkland Hills Drive. Replace the traffic signal with mast arms and add intersection lighting. Add illuminated advance lane use signs and new sidewalk from the intersection of Port Union Road & Holden Boulevard/North Gilmore Road to the intersection of SR-4 & Holden Boulevard/South Gilmore Road.
12/30/2015
  
95711
Miami County Engineer
Britt R Havenar, PE, PS
1-937-440-5656
Berm Stabilization and overlay of Eldean Road between Washington and Experiment Farm Roads.
12/29/2015
  
93505
Medina County Engineer
David J Szabo. PE
1-330-764-8879
Resurface 5.46 miles of West 130th Street (CR-17) with three inches of asphalt concrete.
12/29/2015
  
93444
City of Tallmadge
Bob O'Bryan, Assistant Service Director
1-330-633-0854
Improvements will include the reconstruction of 0.75 miles of the North Avenue (SR 91): the reconstruction and upgraded signalization of the Overdale Drive Intersection with North Avenue including new curbs, sidewalks, drainage, lighting, new signing and pavement markings.
12/23/2015
  
94296
City of Mason
Kurt Seiler, PE
1-513-229-8520
Signal upgrades at forty-two (42) traffic signals and the installation of a city wide fiber optic system within the City of Mason.  The signal upgrades include adaptive signal control at eleven (11) intersections, multiple controller replacements, curb ramp upgrades, replacement of emergency vehicle preemption devices, installation of PTZ cameras, UPS battery replacements, and stop bar radar detectors at some intersections.   In addition, vehicular and pedestrian signal heads will be upgraded to LED lenses at various intersections. 
12/21/2015
  
98761
Belmont County
Fred F Bennett, PE, PS
1-740-699-2160
This project is for the placement of 135.32 miles of ITEM 643 centerline pavement markings on various highways.
12/21/2015
  
98728
City of Elyria
Timothy J Ujvari, PE, PS, City Engineer
1-440-326-1444
The contractor shall furnish all labor, equipment, supplies, and supervision of labors necessary, to reconstruct 0.56 miles of SR-57 by resurfacing, including spot fill depth pavement repairs, handicap ramps, replace traffic lights, and pavement markings in the City of Elyria, Lorain County, Ohio.
12/21/2015
  
97127
Lucas County Engineer
Kyle P Warner, PE
1-419-213-2860
Installation of a modern, single lane roundabout.  The project includes new concrete pavement, concrete curbs and gutters, drainage improvements, earthwork, pavement markings and signing.
12/18/2015
  
92260
Stark County Engineer
David R Torrence, PE, PS
1-330-477-6781
Replacement of deficient bridge over Berlin Reservoir/Mahoning River on existing horizontal and modified vertical alignment including minor approach work.  Project length 0.05 miles.
12/14/2015
  
96853
Village of Loudonville
Curt Young
1-419-994-3214
The construction of approximately 7,945 S.F. of concrete walk, 88 C.Y. of asphalt concrete, 932 L.F. of concrete curb, pavement marking, signage and 819 L.F. of 8" waterline.
12/14/2015
  
96430
City of Campbell
Gary Diorio, PE
1-330-744-5321
The project includes construction of approximately 3,075ft. of new 5ft. sidewalk along the west side of Struthers-Liberty Road between Notre Dame Dr. and Tenney Ave. and approximately 579ft. of new 5ft. walk along the south side of Tenney Ave. between Struthers-Liberty Road and Piccadilly Street.
12/9/2015
  
97385
City of Findlay
Brian Thomas
1-419-424-7121
Pavement planning and resurfacing in the City of Findlay on E. Melrose Ave. from Crystal to Bright, on Broad Ave. from Howard to Trenton, on Osborn Ave. from Sandusky to Wedgewood, on McManness from edge of bridge to Center. Other items include sidewalk and curb ramp replacement, treatment of shoulders and adjustment of manholes and catch basins.
12/9/2015
  
88788
Hamilton County Engineer's Office
Eric Beck
1-513-946-8432
Improvement of Blue Rock Road and Cheviot Road from the south intersection of Blue Rock and Cheviot to Galbraith Road.
12/7/2015
  
96501
City of Dover
David F Douglas
1-330-343-6725
Signal upgrades for 14 signals on Wooster Avenue and removal of 2 signals on Iron Avenue, including fiber optic cable connection.
12/7/2015
  
99414
Tuscarawas County
Scott Reynolds
1-330-365-3229
Eastport Ave improvements to include resurfacing, limited full depth repair, curb, sidewalks, storm sewer, etc. from Shamel St. to Little Stillwater Creek, approx. 1300'.
12/7/2015
  
87089
Montgomery County Engineer's Office
Stephanie Ann Goff, PE, PS
1-937-496-7565
The project consists of resurfacing and widening of Yankee Street to a three lane section with curb and gutter along the east side. This work includes improvements to the horizontal and vertical alignment. One existing culvert will be lengthened. The project length is 0.5 miles.
12/7/2015
  
93958
City of Toledo
Tim Grosjean
1-419-245-1344
Resurfacing of 0.87 miles of Reynolds Road along with traffic island enhancements.