Pavement SCDs - Revision Logs

​​​​​​​​​​​​Standard Construction Drawings

Pavement - Revision Logs​


Date of RevisionRevision Summary​
​January 19, 2024
  • BP-3.1 Specified that the Course Detail for Widening is for widening next to existing pavement to remain in place, not phase joints on pavement replacement projects.  Indicated that the existing subbase should not be excavated vertically at the widening joint to avoid undermining the existing pavement.  Added a note indicating the pavement layers in the widening may not align with the existing layers as shown.  Removed the 0.25” elevation difference in the widening and added a note to slightly exceed the elevation of the existing pavement.  Updated terminology and references throughout and corrected some typographical errors.

​January 21, 2022

  • ​BP-2.1 Corrected the offset from the longitudinal joint to the first dowel in the Plan view on sheet 2.
  • BP-2.5 Corrected the units for the undercut on type TU repairs.  Specified that the 12” cut back for additional pavement removal is a minimum.  Updated terminology to match C&MS.
  • BP 3.1 Updated the gutter seal reference to reflect asphalt specifications reorganization.​​
January 15, 2021​
  • BP-2.2 Corrected reference to C&MS on sheet 2.
January 17, 2020
  • BP-3.1 Added “if specified" to the longitudinal joint preparation detail.
January 18, 2019
  • BP-3.2 Issued new asphalt safety edge drawing.
  • BP-8.2 Issued new concrete safety edge drawing