Ohio.gov State Agencies  |  Online Services
Skip Ribbon Commands
Skip to main content
  
  
  
  
  
  
  
  
  
4/2/201515012677260/TRU-IR 80-4.50/0.00 (PART 1, PART 2 & PART 3)4MAJOR RECONSTRUCTION150126
1
3/26/201515009582263SIGN-FY20153SIGNING150095Delayed
1
3/20/201515005786482US 6-12.20 (PART 1 AND PART 2)12MAJOR RECONSTRUCTION150057Delayed
2
3/20/201515008587268IR 71-1.348MISCELLANEOUS150085Delayed
5
3/20/201515008686979IR 76/77-11.27/12.224MAJOR RECONSTRUCTION150086Delayed
1
3/20/201515014984655IR 76/IR 77/IR 277-VAR4FOUR LANE RESURFACING150149
1
3/5/201515000190991SR 109-18.02 Major Brdg Repl2BRIDGE REPLACEMENT (1 BRIDGE)150001
7
3/5/201515005688407US 250-00.003INTERSECTION150056
3
3/5/201515012389487SR 257-0.146SLIDE REPAIR150123
3
2/26/201515008093782Van Wert W. Main St. Phase II1MINOR WIDENING150080
4
2/26/201515008722714SR 147-09.5211MISCELLANEOUS150087
2
2/26/201515008891816US 40-17.7111TWO LANE RESURFACING150088
2
2/26/201515008985188IR 77-13.3112BRIDGE REPAIR150089
1
2/26/201515009084587DECK OVERLAYS-FY20153BRIDGE REPAIR150090
1
2/26/201515009193913Gahanna-Inf-FY156MISCELLANEOUS150091
3
2/26/201515009391843SR 646-0.0011TWO LANE RESURFACING150093
1
2/26/201515009488777US 35-00.367BRIDGE REPLACEMENT (1 BRIDGE)150094
2
2/26/201515009785275SR 18-17.96 Resurf2TWO LANE RESURFACING150097
2
2/26/201515009887309SR 416-0.00011TWO LANE RESURFACING150098
1
2/26/201515009993443SR 105-9.762TWO LANE RESURFACING150099
3
2/26/201515010088568/DAR/MER-SR 364-0.00/0.00/0.007TWO LANE RESURFACING150100
1
2/26/201515010184565SR 697-1.781BRIDGE REPLACEMENT (1 BRIDGE)150101
1
2/26/201515800189163Infrastruct-201510MISCELLANEOUS158001
2
2/26/201515800288065US 20-9.24/10.08 Bridges2CULVERT REPLACEMENT158002
3
2/26/201515800383987Hobart/Carl Smith Drive (PART 1, PART 2 AND PART 3)9NEW CONSTRUCTION158003
8