ODOT 2013 CONSTRUCTION ADMINISTRATION
MANUAL OF PROCEDURES
 Copies of the 2013 Construction Administration Manual of Procedures may be purchased by contacting:
|
Ohio Department of Transportation Office of Contracts 1980 West Broad Street Columbus, Ohio 43223 Telephone (614) 466-3778, 466-3200 |
Price: $13.00 + Shipping + tax Make checks payable to: Treasurer of State of Ohio c/o Department of Transportation |
Complete PDF of entire 2013 Construction Administration Manual of Procedures ready for printing:
Click Here
for use on mobile devices: Complete e-book of the entire 2013 Manual: Click here
|
100 General Provisions |
Item |
Title |
Item |
Title |
Forward |
Forward and Introduction |
107 |
Legal Relations and Responsibility to Public |
|
101 |
Definitions and Terms |
108 |
Prosecution and Progress |
|
105 |
Control of Work |
109 |
Method of Measurement and Payment |
|
106 |
Control of Materials |
|
|
|
|
|
200 Earthwork |
Item |
Title |
Item |
Title |
201 |
Clearing and Grubbing |
205 |
Chemically Stabilized Embankment |
|
202 |
Removal of Structures and Obstructions |
206 |
Chemically Stabilized Subgrade |
|
203 |
Roadway Excavation and Embankment |
208 |
Rock Blasting |
|
204 |
Subgrade Compaction and Proof Rolling |
209 |
Linear Grading |
|
|
|
250 Pavement Repairs |
Item |
Title |
Item |
Title |
251 |
Partial Depth Pavement Repair |
255 |
Full Depth Pavement Removal and Rigid Replacement |
|
252 |
Full Depth Rigid Pavement Removal and Flexible Replacement |
256 |
Bonded Patching of Portland Cement Concrete Pavement |
|
253 |
Pavement Repair |
257 |
Diamond Grinding Portland Cement Concrete Pavement |
|
254 |
Pavement Planing |
258 |
Dowel Bar Retrofit |
|
|
|
300 Bases |
Item |
Title |
Item |
Title |
301 |
Asphalt Concrete Base |
308 |
Asphalt Treated Free Draining Base |
|
302 |
Asphalt Concrete Base |
320 |
Rubblize and Roll |
|
304 |
Aggregate Base |
321 |
Cracking and Seating Existing Non-Reinforced Concrete Pavement |
|
305 |
Portland Cement Concrete Base |
|
|
|
|
|
400 Flexible Pavement |
Item |
Title |
Item |
Title |
401 |
Asphalt Concrete Pavements - General |
423 |
Crack Sealing, Hot Applied |
|
407 |
Tack Coat |
424 |
Fine Graded Polymer Asphalt Concrete |
|
408 |
Prime Coat |
442 |
Superpave Asphalt Concrete |
|
409 |
Sawing and Sealing Asphalt Concrete Pavement Joints |
443 |
Stone Matrix Asphalt Concrete |
|
410 |
Traffic Compacted Surface |
446 |
Asphalt Concrete (based on density) |
|
411 |
Stabilized Crushed Aggregate |
448 |
Asphalt Concrete (based on composition) |
421 |
Microsurfacing |
|
|
422 |
Chip Seal |
|
|
|
450 Rigid Pavement |
Item |
Title |
Item |
Title |
451 |
Reinforced Portland Cement Concrete Pavement |
455 |
Quality Control Plan, Testing and Assurance for Qc/Qa Concrete |
452 |
Non-Reinforced Portland Cement Concrete Pavement |
499 |
Concrete - General |
|
500 Structures |
Item |
Title |
Item |
Title |
501 |
Structures - General |
513 |
Structural Steel Members |
502 |
Structures for Maintaining Traffic |
514 |
Painting of Structural Steel |
503 |
Excavation for Structures |
515 |
Prestressed Concrete Bridge Members |
504 |
Sheet Piling Left in Place |
516 |
Expansion and Contraction Joints Joint Sealers and Bearing Devices |
505 |
Pile Driving Equipment Mobilization |
517 |
Railings |
506 |
Static Load Test |
518 |
Drainage of Structures |
507 |
Bearing Piles |
519 |
Patching Concrete Structures |
508 |
Falsework and Forms |
520 |
Pneumatically Placed Mortar |
509 |
Reinforcing Steel |
522 |
Structural Plate Corrugated Metal Structures on Footings |
510 |
Dowel Holes |
523 |
Dynamic Load Test |
511 |
Concrete for Structures |
524 |
Drilled Shafts |
512 |
Treating Concrete |
526 |
Approach Slabs |
|
600 Incidentals |
Item |
Title |
Item |
Title |
601 |
Slope and Channel Protection |
618 |
Rumble Strips on Shoulders |
602 |
Masonry |
619 |
Field Office |
605 |
Underdrains |
620 |
Delineators |
606 |
Guardrail |
621 |
Raised Pavement Markers (RPM) |
607 |
Fence |
622 |
Concrete Barrier |
608 |
Walks, Curb Ramps, and Steps |
623 |
Construction Layout Stakes |
609 |
Curbing, Concrete Medians, and Traffic Islands |
624 |
Mobilization |
610 |
Cellular Retaining Walls |
625 |
Highway Lighting |
611 |
Pipe Culverts, Sewers, and Drains |
626 |
Barrier Reflectors |
613 |
Low Strength Mortar Backfill |
630 |
Traffic Signs and Sign Supports |
614 |
Maintaining Traffic |
631 |
Sign Lighting and Electrical Signs |
615 |
Roads and Pavements for Maintaining Traffic |
632 |
Traffic Signal Equipment |
616 |
Dust Control |
633 |
Traffic Signal Controllers |
617 |
Reconditioning Shoulders |
638 |
Water Mains and Service Branches |
|
640 Pavement Marking |
Item |
Title |
Item |
Title |
641 |
Pavement Marking - General |
645 |
Preformed Pavement Marking |
642 |
Traffic Paint |
646 |
Epoxy Pavement Marking |
643 |
Polyester Pavement Marking |
647 |
Heat-Fused Preformed Thermoplastic Pavement Marking |
644 |
Thermoplastic Pavement Marking |
648 |
Spray Thermoplastic Pavement Marking |
|
650 Roadsides |
Item |
Title |
Item |
Title |
651 |
Topsoil Stockpiled |
659 |
Seeding and Mulching |
652 |
Placing Stockpiled Topsoil |
660 |
Sodding |
653 |
Topsoil Furnished and Placed |
661 |
Planting Trees, Shrubs, and Vines |
654 |
Renovating Existing Soil |
662 |
Landscape Watering |
656 |
Roadside Cleanup |
666 |
Pruning Existing Trees |
657 |
Riprap for Tree Protection |
670 |
Erosion Protection |
658 |
Tree Root Aeration |
671 |
Erosion Control Mats |
|
Supplemental Specifications |
Item |
Title |
Item |
Title |
832 |
Temporary Sediment And Erosion Controls |
851 |
Asphalt Treated Free Draining Base |
840 |
Mechanically Stabilized Earth (MSE) Walls |
1015 |
Compaction Testing Of Unbound Materials |
850 |
Cement Treated Free Draining Base |
|
|